Section 7-212. Grading Inspection.

All grading operations for which a permit is required shall be subject to inspection by the Inspection Department. When required, special inspection of grading, operations and special testing shall be performed in accordance with provisions of Section 7-212.2. 1. Grading Designation: All grading in excess of five thousand (5000) cubic yards shall be performed in accordance with the approved grading plan prepared by a civil engineer, and shall be designated as “engineered grading”. Grading involving less than five thousand (5000) cubic yards shall be designated “regular grading” unless the permittee, with the approval of the Inspection Department chooses to have the grading performed as “engineered grading”. 2. Engineered Grading Requirements: For engineered grading it shall be the responsibility of the civil engineer who prepares the approved grading plan to incorporate all recommendations from the soil engineering and engineering geology reports into the grading plan. He/she shall also be responsible for the professional inspection and certification of the grading within his/her area of technical specialty. This responsibility shall include, but need not be limited to, inspection and certification as to the establishment of line, grade and drainage of the development area. The civil engineer shall act as the coordinating agent in the event the need arises for liaison between the other professionals, the contractor and the Inspection Department. The civil engineer shall also be responsible for the preparation of revised plans and the submission of as- graded grading plans upon completion of the work. Soil engineering and civil engineering and geology reports shall be required as specified in Sections 7-202 and 7-203. During grading all necessary reports, compaction data and soil engineering and civil engineering and geology recommendations shall be submitted to the civil engineer and the Inspection Department by the soil engineer and the civil engineer and geologist. The soil engineer’s area of responsibility shall include, but need not be limited to, the professional inspection and certification concerning the preparation of ground to receive fills, testing for required compaction, stability of all finish slopes and the design of buttress fills, where required, incorporating data supplied by the engineering geologist. The civil engineer’s area of responsibility shall include, but need not be limited to, the site grading, design, and drainage. The geologist’s area of responsibility shall include, but need not be limited to, professional inspection and certification of the adequacy of natural ground for receiving fills and the stability of cut slopes with respect to geological matters, and the need for subdrainage or other ground water drainage devices. He shall report his findings to the soil engineer and the civil engineer for engineering analysis. The Inspection Department shall inspect the project at various stages of the work requiring certification and at any more frequent intervals necessary to determine that adequate control is being exercised by the professional consultants. 3. Regular Grading Requirements: The Inspection Department may require inspection and testing by an approved testing agency. The testing agency responsibility shall include, but need not be limited to, certification concerning the inspection of cleared areas and benches to receive fill, and the compaction of fills. When the Inspection Department has cause to believe that geologic factors may be involved, the grading operation will be required to conform to engineered grading’ requirements. 4. Notification of Noncompliance: If, in the course of fulfilling their responsibility under this Article, the civil engineer, the soil engineer, the geologist or the testing agency finds that the work is not being done in conformance with this Article or the approved grading plans, the discrepancies shall be reported immediately in writing to the person in charge of the grading work and to the Inspection Department. Recommendations for corrective measures, if necessary, shall be submitted. 5. Transfer of Responsibility for Certification: If the civil engineer, the soil engineer, the geologist or the testing agency of record are changed during the course of the work, the work shall be stopped until the replacement has agreed to accept the responsibility within the area of their technical competence for certification upon completion of the work.

Source: Ordinance No. 1359-1999, 12-21-99