Section 9.2-3. General Criteria and Standards.

1. Applicability: This Ordinance shall apply to any residential development of five (5) acres or more or any non-residential development of three (3) acres or more. This Ordinance shall also apply to any residential development of less than five (5) acres or any non-residential development of less than three (3) acres but have fifty percent (50%) or greater impervious surface. 2. Limitation on Stormwater Runoff: No development shall be undertaken that increases the rate of surface runoff to downstream property owners or drainage systems. 3. Detention of Excess Stormwater Runoff: The increased stormwater run-off resulting from the proposed development shall be detained by the provision of retention or detention facilities. 4. Storage Capacity: Retention or detention facilities shall be designed with sufficient capacity to accommodate all run-off caused by the development in excess of that run-off which would occur from the site if left in its natural, undeveloped condition. This storage shall be sufficient to store all excess flows for the twenty-five (25) year storm of twenty-four (24) hour duration. 5. Channel Stability: The stormwater run-off from the proposed development shall not increase channel instability downstream. 6. Retention/Detention Facilities in Floodplains: If detention storage is provided within a floodplain of a major stream, storage volume for the facility may be provided above/below the high water elevations established for that floodplain with banks 24” higher than floodplain. No retention/detention facility should be located in a regulatory floodway. 7. Stormwater Bypass: Drainage systems shall have adequate capacity to bypass through the development the existing flow from all upstream areas.

Source: Ordinance No. 1399-2002, §3, 300.1, 2-19-02 Source: Ordinance No. 1399-2002, §3, 300.4, 2-19-02 Source: Ordinance No. 1399-2002, §3, 300.6, 2-19-02 Source: Ordinance No. 1366-2000, §3, 4-4-00