§ 10-28 — Permit procedures
Code of Ordinances, City of Meridian, Mississippi (Supp. No. 55: codified through Ordinance No. 4604, enacted October 21, 2025) · Meridian Code of Ordinances § 10-28
Corpus is an independent public-information project, not the official City of Meridian website. Stable reference: corpuslaw.us/code/3d9a1e21-3acb-4769-a237-b3d4e8955301
Sec. 10-28. - Permit procedures.
Application for a development permit shall be made to the local administrator on forms furnished by him or her prior to any development activities, and may include, but not be limited to, the following plans in duplicate drawn to scale showing the nature, location, dimensions, and elevations of the area in question; existing or proposed structures, fill, storage of materials, drainage facilities, and the location of the foregoing. Specifically, the following information is required: (1) Application stage. a. Elevation in relation to mean sea level of the proposed lowest floor (including basement) of all structures; b. Elevation in relation to mean sea level to which any nonresidential structure will be floodproofed; c. Certificate from a registered professional engineer or architect that the nonresidential floodproofed structure will meet the floodproofing criteria in section 10-42(2); d. Description of the extent to which any watercourse will be altered or relocated as a result of proposed development, and; (2) Construction stage. Provide a floor elevation or floodproofing certification after the lowest floor is completed. Upon placement of the lowest floor, or floodproofing by whatever construction means, it shall be the duty of the permit holder to submit to the local administrator a certification of the elevation of the lowest floor or floodproofed elevation, whichever is applicable, as built, in relation to mean sea level. Said certification shall be prepared by or under the direct supervision of a registered land surveyor or professional engineer and certified by same. When floodproofing is utilized for a particular building, said certification shall be prepared by or under the direct supervision of a professional engineer or architect and certified by same. Any work undertaken prior to submission of the certification shall be at the permit holder's risk. The administrator shall review the floor elevation survey data submitted. Deficiencies detected by such review shall be corrected by the permit holder immediately and prior to further progressive work being permitted to proceed. Failure to submit the survey or failure to make said correction required hereby, shall be cause to issue a stop-work order for the project.
(Ord. No. 3963, § 7C, 12-7-93)
Ask a question about Meridian law
Corpus searches the Meridian sections it holds and shows the ones that match, with their citations. Free, no sign-in.