For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 1300 — Site plan review

Code of Ordinances, City of Meridian, Mississippi (Supp. No. 55: codified through Ordinance No. 4604, enacted October 21, 2025) · Meridian Code of Ordinances, App. A, art. III, § 1300

Corpus is an independent public-information project, not the official City of Meridian website. Stable reference: corpuslaw.us/code/2b8657b2-0f60-45f5-84e6-7de328c0a7b1

Sec. 1300. - Site plan review.

1300.01. Purpose and applicability: Site plan review shall be required to ensure compliance with this zoning ordinance and other ordinances as they apply to all development projects and additionally; to expedite procedures necessary for the obtaining of building permits, to provide the developer with one central review of development proposals, to conserve the time and efforts of city employees in various departments, and to efficiently coordinate the development process. The Building Official in coordination with the Zoning Administrator and subject to other provisions of this ordinance shall determine the level of review required for each permit. Simple, routine projects may be reviewed and approved by the Building Official. More complex projects may be forwarded to the Zoning Administrator or the Site Plan Review Committee. 1300.02. Contents of site plan: The required site plan shall include, but not be limited to, the following elements: (1) Statement describing the character and intended use of the development; (2) A dimensioned site plan based on exact survey and/or properly recorded plat(s) of the property drawn to scale of sufficient size to show: (a.) Exact size and location of all buildings and structures. (b.) All means of ingress and egress (Accessways/curb cuts). (c.) All setbacks, screens and buffers pursuant to Section 710. (d.) Off-street parking and loading areas and calculations. (e.) Refuse collection areas. (f.) Natural features such as streams, lakes or other topographic features, contours, trees or the like. (g.) Grading, drainage and utilities. 1300.03. Conditions and general considerations on issuance of site plan approval: The site plan submitted for such development as defined in this section shall provide that the proposed lot sizes, lot coverage, density, setback provisions, areas, roads, and water courses, and other factors are in conformity with the requirements of applicable ordinances and laws. In addition to such general considerations, said plan shall be approved only after a consideration of the following factors: (1) Safe and convenient ingress and egress to the property and proposed development thereon; (2) Proper surface drainage so that removal of surface waters will not adversely affect neighboring properties or public storm drainage systems and will, so far as practical, conserve the water resources of the area and avoid flooding, erosion, and detrimental depositing of sediments of any kind. Surface water shall be disposed of in a manner consistent with sound engineering and ecological practices. The drainage system will be designed so that, except in unusual circumstances, the rate of runoff of surface water from the site in the condition in which it is proposed to be developed will not exceed the rate of runoff from the site in its undeveloped or existing condition; (3) All utility connections shall be indicated and shall be in conformity with the standards and requirements for connection to utility companies proposed to serve the property whether said utility companies are public or private; (4) Off-street parking and loading areas, with attention to automotive and pedestrian safety, traffic flow and control, access in case of fire and catastrophe, and screening and landscaping; (5) General site arrangement, amenities, and conveniences, to insure that appearance and general layout of the proposed development will be compatible and harmonious with properties in the general area and will not be so at variance with other development in the area as to cause a substantial negative impact on such property values including adequate provision for the disposal of all wastes, the avoidance of noise, odor and other air pollutants that may be generated at the site. 1300.04. Application procedure: (1) The site plan shall be filed with the Building Official or Zoning Administrator whose duty it shall be to determine whether or not the plan needs to be forwarded to the site plan review committee. (2) After complete review, the Zoning Administrator shall certify that said site plan does or does not comply with all ordinances. (3) If the site plan does comply and there is no rezoning or other consideration pending, the Zoning Administrator shall forward the approved site plan to the Building Official, and so notify the applicant in writing. (4) If the site plan does not comply, the Zoning Administrator shall so specify in what respects it does not comply in writing to the applicant and shall then require correction and compliance before further processing. (5) In all cases, the Zoning Administrator shall have up to or a maximum of thirty (30) days from the date of filing to review and recommend either approval, approval with specific conditions, or disapproval of any site plan. (6) This decision shall be binding on all city departments as far as site plan approval for obtaining building permit is concerned. (7) Should the site development plan be approved and no action taken by the developer this approval shall EXPIRE one (1) year from the time of approval. (8) Applicants shall have the right to appear before the site plan review committee. (9) However, the applicant must first make a request to the Zoning Administrator and a time, date, and place must be agreed upon for the meeting. (10) Any person aggrieved of the decision of the site plan review committee may appeal to the Commission in the manner of other appeals.

Ask a question about Meridian law

Corpus searches the Meridian sections it holds and shows the ones that match, with their citations. Free, no sign-in.