E. - MINIMUM STANDARDS

The owner shall submit to the engineer two complete sets of plans and profiles of load work to be constructed in the subdivision. The engineer may require the owner to lay grades and designate size of drains to be used before considering the same and may make any changes he deems necessary to conform to good engineering practice. The owner will furnish the engineer a topographical map of the area to be subdivided when required by him, so that he may be able to study drainage requirements. Contours on the map shall be on two- foot intervals from actual elevation. 1. Street improvements: All existing and new roads, regardless of lot size, must comply with these regulations before dedication is accepted and before the roads will be maintained by Olive Branch. (a) Width and depth of compacted gravel: i. Residential subdivisions shall have a minimum of eight inches of compacted gravel or if measured before compaction, 12 inches of load measurement. ii. Commercial and industrial subdivisions shall have a minimum of 12 inches of compacted gravel over the entire width of the proposed gravel area or shall use a black base treatment in accordance with Mississippi State Aid Road Specifications. iii. Width of compacted gravel: Fifty-foot r.o.w. roads shall have 30 feet of compacted gravel. Sixty-foot r.o.w. roads shall have 40 feet of compacted gravel. All 68-foot and 80-foot r.o.w. roads shall have 48 feet of compacted gravel. Where needed as an arterial road, the gravel thickness and width may be increased by the county engineer. (b) Width of pavement: Fifty-foot r.o.w. roads shall have 30 feet of pavement or 20 feet when there is no curb and gutter. All other roads shall have pavement widths as specified in the cross sections shown in figure 1 [not printed in this volume]. (c) All new roads must be paved by the developer before being accepted by the governing authority for maintenance. Two inches of plant mix surface, using the latest Mississippi State Highway Specifications, is required on all new roads in subdivisions. Any changes from these specifications must be approved by the engineer and tests may be required on all materials. The latest edition of the State Specifications will govern construction. (d) All bridges shall be constructed according to the Mississippi Standard Specifications for State Aid Road and Bridge Construction in effect at the time the subdivision is approved. (e) The subdivider shall dedicate and construct all minor and collector streets for full width of right-of-way as defined in article V, A, 5. Where the developer is developing a subdivision that runs to the center of a major or arterial street, he will be required to dedicate and develop only one-half of said road. However, in no case shall less than 20 feet of wearing surface be required when one-half of the right-of-way is dedicated. (f) Curb and gutter will be installed in all residential, commercial and industrial zoned subdivisions using the Mississippi State Highway Specifications. The developer shall have material and compression tests of the concrete performed and the results submitted to the engineer. In residential, industrial, and commercial subdivisions in rural areas, curb and gutter requirements shall be of such character as is suitable for the expected traffic and in harmony with similar improvements in the surrounding area, as determined by the engineer. (g) The developer's engineer must notify the engineer in writing when the subgrade is ready for gravel stating all culverts, subgrade width and firmness of subgrade are up to approved engineering standards before gravel is placed on the road. The owner shall notify the engineer when he plans to place gravel on the road. The engineer may have a representative present if load measurement is to be used. After the gravel is placed, the engineer will again certify that the gravel is of proper material thickness and width. When the road is to be paved, the engineer again will certify as to roadbed being in proper condition for surfacing and that the materials used meet standards. The engineer or his representative will inspect the road one time after being notified at completion of each phase of this work at no cost to the owner. If another trip is made, there will be a per hour charge for time involved on all other trips. (h) If these standards are not carried out, the Olive Branch mayor and board of aldermen will not accept the roads for maintenance. 2. Drainage: (a) The plat shall be laid out so as to provide proper drainage of the area being subdivided. Drainage improvements shall maintain any natural watercourse and shall prevent the collection of water in any low areas. (Also see 9(e) of this article.) (b) All drainage pipes may be concrete, asphalt-coated metal pipes or plain galvanized-coated metal pipes. The engineer must approve the gauge thickness of asphalt-coated metal pipes or plain galvanized metal pipes. All plain galvanized pipes approved by the engineer for the sizes 21 inches through 96 inches in diameter shall be one gauge heavier than the approved gauge for asphalt-coated metal pipe. The developer's engineer shall provide the engineer with the shipping tickets showing the gauge of all pipes installed. (c) The planning commission upon recommendation of the engineer may require paving of ditches or appropriate stabilization. Sufficient easements will be provided on subdivision plats for maintenance of large ditches for alignment and cleaning. Ditches shall be constructed on uniform grades sufficient for proper runoff. (d) All underground drainage must be inspected and approved by the engineer. (e) All driveway culverts and ramps shall be provided for by the subdivider. The cost of culverts and ramps shall be included within the performance bond for the subdivider, with the number of culverts and cost being approved and estimated by the engineer. Upon installation of any culverts or ramps by the subdivider, the performance bond may be reduced or a new bond substituted to secure the obligation with respect to culvert and ramp provision requirements. 3. Sidewalks: a. Concrete sidewalks not less than five feet wide and four inches in depth shall be constructed four feet from curb along both sides of all major, minor, and collector streets with curbs and gutters in accordance with applicable standard specifications of the city. b. Sidewalks shall be installed at same time that driveways are installed. c. Sidewalks will have to be installed on all lots prior to receiving final inspection from city. d. The governing authority may waive the above requirements for sidewalks provided that street rights-of-way are left unobstructed and graded in such manner that sidewalks may be constructed at a later date. e. Material and compression tests of the concrete shall be performed and submitted to the engineer. 4. Water supply: All subdivisions shall have the proposed water system approved by the appropriate state agencies. The water system shall have enough outlets and shall be large enough to furnish an adequate water supply and fire protection to every lot. (a) Water mains, where possible, shall be located in street rights-of-way as approved by the engineer. (b) The installation of the water system, including fire hydrants, shall be subject to the approval of the governing authority and engineer. (c) Fire Hydrants: (i) Location: Fire hydrant locations shall be approved by the fire marshal in conjunction with the city engineer. Fire hydrants shall be installed within a subdivision at the following locations (or as directed by the city engineer): (A) At all entrances to and at all intersections within the subdivision. An existing hydrant located within 250 feet of the entrance to the subdivision may suffice for this location, provided it provides adequate fire flow. (B) Along the frontage of all streets within a subdivision at an interval such that there shall be not more than 500 lineal feet, as measured along the curb lien, between fire hydrants. Hydrants will be located at property lines, with the exception of corner lots where the hydrant will be located at the intersection. (C) At locations such that all lots within the subdivision are within 250 feet of a fire hydrant. (ii) Standards: (A) Fire hydrants shall be AWWA Standard Compression Drytop, two-piece standpipe, four-inch valve opening, six-inch inlet connection, diameter of seat ring opening to be not less than five and one-quarter inches, and a six-inch mechanical bell joint inlet with cast iron retainer glands with set screws. Pipe connections for the six-inch lines off the water main shall be of sufficient length to provide for at least a three-foot bury at a minimum. (B) All fire hydrants shall contain the following hose connections: • Two National Fire Underwriters Standard two and one-half-inch hose connections with National Standard Threads, also known as National Hose Threads. • One four and one-half-inch steamer connection with National Standard Threads, also known as National Hose Threads. (C) Hydrants shall open counterclockwise (to the left), and shall have a pentagon-shaped (five-cornered) operating nut and shall be of the compression type with the proper drip valve and constructed so that they will not flood when the barrel is broken. (D) Fire hydrants shall have a shop coat of cement mortar and lined with a bituminous seal coat inside and out below grade and red coat above grade. The contractor shall paint the hydrants after setting as directed by the city engineer. (E) Hydrants shall be equipped with a six-inch branch valve and box between it and the main to which it is connected. The valve cover assembly shall be set in a six-inch square box of concrete, at grade level, no further than three feet from the hydrant location. Valves shall open to the left. Fittings 12 inches and smaller shall have a pressure rating of 250 pounds per square inch. Valves shall be removable without digging. (F) Approved manufacturers: Approved manufacturers of fire hydrants are Mueller, M & H Valve and Fittings Company, or an approved equal. (iii) Setting fire hydrants: (A) General location: Hydrants shall be located in a manner to provide complete accessibility, and in such a location that the possibility of damage from vehicles or injury to pedestrians will be minimized. Unless otherwise directed by the city engineer and the fire marshal, the setting of a hydrant shall conform to approved engineering plans and the following requirements: • Location in relation to curb or pavement lines: When placed behind curb or pavement, the hydrant barrel shall be set so that no portion of the steamer or hose connection caps will be less than 24 inches or more than 42 inches from the gutter face of the curb or edge of pavement. If set between streets, the hydrant shall be placed in a manner designated by the city engineer and the fire marshal. If any unusual conditions prevail, alternative locations will be subject to the approval of the city engineer and the fire marshal. The contractor shall verify the hydrant locations with the city engineer before setting any hydrants. • Location in relation to sidewalk: When set in the lawn space between the curb and the sidewalk, or between the sidewalk and the property line, no portion of the hydrant, or connection caps, shall be within six inches of the sidewalk. (B) Position of nozzles: All hydrants shall be set in a true plumb position to the established grade, and shall have their steamer nozzle facing and perpendicular to the curb or street. They shall conform to the established grade with nozzles at least 12 inches above the ground. (C) Connection to the main: Each hydrant shall be connected to the main water line with a six-inch branch controlled by an independent six-inch gate valve, except as may be otherwise directed by the city engineer. (D) Drainage at hydrants: Hydrants shall be set with at least one-quarter cubic yard of broken stone or coarse washed gravel under and about the base at least two feet in diameter, one foot below the base, and one foot above the drip for drainage. No hydrant drainage pit shall be connected to a sanitary sewer line. (E) Anchorage for hydrants: All fire hydrants shall be shackled to the branch or auxiliary valve and the valve shackled to the tee in a manner approved by the city engineer. All hydrants shall be set upon a slab of concrete four inches thick and not less than 15 inches square, and shall be backed by concrete to prevent the hydrant from blowing off. (F) Cleaning: Hydrants shall be thoroughly cleaned of dirt or foreign matter before setting. (iv) Testing: The plat of any subdivision shall not be recorded until all fire hydrants have been inspected and flow tested by the fire marshal or his designee. 5. Sanitary sewer system: (a) Centralized sewage collection and treatment facilities shall be provided on all lots in all subdivisions except as hereafter provided and shall conform to all applicable state and local laws. (b) Where centralized public sewage collection systems are not reasonably accessible to the subdivider and an individual centralized disposal system is provided by the subdivider, sewer lines shall be laid out so a future connection with the public sewer main shall be made. All plans shall be designed and approved in accordance with the rules, regulations and standards of the Mississippi State Board of Health, the DeSoto County Health Department. Necessary action shall be taken by the subdivider to extend or create a sanitary sewer district which will maintain the disposal system. (c) Individual septic tanks may be used in subdivisions where central sewage is not available only if written approval is obtained from the Mississippi State Board of Health acting through the DeSoto County Health Department. (d) All subdivisions hereafter filed for record in the office of the chancery clerk shall be approved only for use with central collection and treatment of sewage unless there is affixed to the plat a notation signed on behalf of the health department that septic tanks may he used on the lots. Developers contemplating use of central collection and treatment need not submit such plats to the health department but all approvals by the county will only authorize centralized collection and treatment and no building permit will be issued authorizing use of septic tanks on such lots. Notations authorizing use of septic tanks by the health department may be in substantially this form: "SEPTIC TANKS MAY BE USED ON THE LOTS SHOWN ON THIS PLAT OF SUBDIVISION" DESOTO COUNTY HEALTH DEPARTMENT by HEALTH OFFICER DATE: ___________ 6. Streetlights and traffic signs: Streetlights and traffic signs shall be required in accordance with design and specification standards approved by the engineer and utility company. Where streetlights are required the subdivider shall confer with the electric utility company serving the property. 7. Street signs: Street signs shall be installed at all intersections within and bordering the subdivision in accordance with Olive Branch specifications. 8. Care of area during construction: (a) Builders and contractors shall be responsible for cleaning up all loose paper and material subject to be scattered by the wind each day and prevent such material from scattering through a subdivision or to adjoining property. The premises will be kept in a reasonably clear unlittered manner. Building permits may be withheld from builders and contractors who fail to maintain premises free of litter and loose paper after being warned by the building department. (b) Builders and contractors shall not permit waste materials, dirt and debris to be placed or allowed to remain in a public street or road. Surplus dirt shall not be graded or pushed into a street. If a builder or contractor shall not immediately remove such material placed by him or his subcontractors in a street after being warned, no building permit shall be issued to him for a period of six months thereafter, and the violator may be prosecuted for unlawfully placing an obstruction in a public road. At the discretion of the building official, he may cause such material to be removed and the contractor shall be required to pay the cost of such removal. 9. Erosion and sediment control: Installation of the above improvements shall be done in such a manner as to provide for the most effective control of erosion and sediment. The construction plan shall be accompanied by an erosion and sediment control plan which shall be submitted to the DeSoto County Soil and Water Conservation District for review and recommendations. Practical combination of the following technical principles shall be used: (a) The smallest practical area of land shall be exposed at any one time during development. (b) When land is exposed during development, the exposure shall be kept to the shortest practical period of time. (c) Temporary vegetation or mulching shall be used to protect critical areas exposed during development. (d) Sediment basins (debris basins, desilting basins, or silt traps) shall be installed and maintained to remove sediment from runoff waters of land undergoing development. (e) Provisions shall be made to effectively accommodate the runoff caused by changed soil conditions during and after development. (f) Permanent final vegetation and structures shall be installed as soon as practical in the development. (g) The development plan shall be fitted to the topography and soils so as to create the least possible erosion. (h) Whenever feasible, natural vegetation shall be retained and protected. 10. Payment in-lieu of construction: The Board of Aldermen may, under certain circumstances, deem it in the best interests of the City to waive certain general or specific conditions of approval related to the minimum standards set forth hereinabove. A developer seeking such waiver may voluntarily propose a payment in-lieu of construction of such minimum standards. The amount of such payment in-lieu of construction shall be determined by the City Engineer and shall be an amount consistent with the estimated cost to the City of constructing the necessary minimum improvements. In those instances where the developer proposes a payment in-lieu of construction, such proposal shall be submitted to the Planning Commission and the Board of Aldermen with the submission of the preliminary plat or the preliminary development plan, and shall be accompanied by appropriate supporting documentation. It shall be at the discretion of the Board of Aldermen to either accept the payment in-lieu of construction, or to require the construction of the improvement in accordance with the minimum standards set forth hereinabove. In those instances where the waiver and payment in-lieu of construction is approved, the City of Olive Branch shall deposit funds received pursuant to such waiver into a separate account, and such funds shall be used for street, sidewalk, gutter, or other improvements associated with the development for which the payment in-lieu of construction was submitted.

(Ord. of 2-1-94(8)) (Ord. of 2-2-99(5), § 1; Ord. of 6-6-00; Ord. of 2-16-10(3), § 1)