For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 98-159 — Colocation of resources and joint excavation

Code of Ordinances, City of Oxford, Mississippi (Supp. No. 36: codified through Ordinance No. 2026-5, enacted March 17, 2026) · Oxford Code of Ordinances § 98-159

Corpus is an independent public-information project, not the official City of Oxford website. Stable reference: corpuslaw.us/code/50ada2d9-0f60-4bed-b758-50d77462a89d

Sec. 98-159. - Colocation of resources and joint excavation.

Colocation of resources is encouraged. The director of public works may disallow or limit excavation or other work proposed to be performed in an area where similar work has been performed within the prior five years, subject to the exceptions listed in section 98-166. Whenever applicants propose work or construction in the same block or area of the city, the city shall condition permits for such work in a manner that maximizes coordination and minimizes the total period of construction. Such work may be conditioned to require the applicants to participate in a single excavation with the bond to reflect the pro rata share of the work. Applicants may seek a waiver of the joint excavation requirements with respect to a particular excavation. Within 20 calendar days of receipt of a written request for a waiver, the director of public works or his or her designee shall render a decision upon such a request, taking into account the impact of the proposed excavation on the neighborhood and the public health, safety, welfare, and convenience.

(Ord. No. 2012-5, 9-4-2012)

Ask a question about Oxford law

Corpus searches the Oxford sections it holds and shows the ones that match, with their citations. Free, no sign-in.