§ 8-242 — Permit required to place DAS and/or small cell technology facilities
Code of Ordinances, City of Pearl, Mississippi (Supp. No. 2: codified through Ordinance of October 3, 2023) · Pearl Code of Ordinances § 8-242
Corpus is an independent public-information project, not the official City of Pearl website. Stable reference: corpuslaw.us/code/cb7311b2-1bbe-4f5b-af49-4f6b00a6eb3d
Sec. 8-242. - Permit required to place DAS and/or small cell technology facilities.
The application process for locations within city right-of-way follow herein. The application process for locations on private property, to include additions to existing structures on private property, are subject to the guidelines of this article, as well as review by the city's architectural review committee, and shall also be subject to any applicable construction permitting processes. (1) Provider or applicant must obtain an infrastructure permit from the city before placing, installing, constructing, or operating any DAS and/or small cell technology facility (and associated accessory equipment) on any support structure that is located on the right-of-way, or substantially modifying the position or characteristics of any such existing facility thereon. (2) Permits are to be filed with the permit department along with payment of the applicable permit application fee. Applications that are found to warrant a waiver or discount of the permit application fee will be handled as a reimbursement after the fact. (3) The city public works director (the "director"), or his designee, will review and process any request for a permit. The director will determine whether the application is complete and whether the proposed facilities comply with the guidelines herein and whether review by any other person or committee should be required. Except as set forth in this section, this permitting process will be administrative and not require the approval of the city board of aldermen or city official other than the director. (4) For complete applications, the city will respond with a final determination of approval or denial within 60 days of submission for collocated applications, whether individual or batched, and within 90 days of submission for new locations, whether individual or batched. Should considerably large batches or groupings of applications stress the city's resources requiring additional time to process, the city shall so notify the applicant(s) in writing, including a reasonable timeline for processing. If/when applications are resubmitted after being determined to be materially incomplete, the timeline starts over for review. (5) If/when applications are determined to be materially incomplete, the city will notify the applicant within 30 days of their submission. (6) If/when applications are denied due to non-compliance, the city will notify the applicant in writing of the specific non-compliant attribute(s). The applicant shall have 30 days in which to submit amendments to its application to cure any deficiency without incurring additional application fees. (7) Upon approval of an application, the permit will be processed and prepared for pick-up. The applicant may pay the related license fee specified herein and pick up the infrastructure permit. (8) Permits for the construction of new facilities or the placement of collocated equipment shall be good for six months following processing of the permit. (9) Each application for a permit shall contain the following: a. Site plan and structural drawings stamped by an engineer licensed in the State of Mississippi depicting the type of facilities, support structure, and means and points at which such facilities and associated accessory equipment will be attached to a support structure; b. Map(s) designating with specificity the location(s) of the requested facilities and all other existing or proposed locations within 1,000 feet; c. The geographic coordinates of all existing antenna and other proposed facilities within the city; d. If the facilities will be located on a support structure on the right-of-way that is owned by any entity other than the city or the applicant, a copy of any license, lease, agreement or other documentation evidencing that the owner of that support structure authorizes the facilities to be attached thereto or agrees in principle to authorize that attachment. e. If the applicant requests permission to place facilities on a new support structure, include the substantiation therefore required by 8-243(1) in this article. f. Photo-simulated post-construction renderings depicting the proposed facilities and accessory equipment, including any/all equipment cabinets, ancillary structures, coloration, and landscaping. g. Demonstrated ability and financial resources to restore the subject area to its preexisting condition following installation if/when the proposed installation will disturb conditions on the right-of-way. h. Certificate(s) of insurance, or of self-insurance, evidencing that it has obtained and will maintain the following types of insurance in connection with its operations on or use of the right-of-way: 1. Commercial general liability coverage insuring the risk of claims for damages to persons or property arising from or related to the installation, construction, maintenance, operation or any use of facility or support structure placed on or along the right-of-way by the applicant (or any of their contractors) with minimum limits of $1,000,000.00 per occurrence and $2,000,000.00 aggregate; and 2. Workers compensation insurance as required by statute. The required general liability coverage shall include the city as an additional insured, and may be provided through a combination of a primary and umbrella excess policies. All required insurance policies shall be furnished by insurers who are eligible to transact business in the State of Mississippi and are rated at least A-VII by AM Best. Following initial installation, if any changes in coverage occur, the applicant shall furnish the city a new certificate indicating that the above-noted coverage remains and will remain in effect. In lieu of the insurance requirements above, an applicant may provide a certificate of self-insurance sufficient to satisfy the above amounts.
(Ord. No. 2020-005, § 3, 12-1-2020)
Ask a question about Pearl law
Corpus searches the Pearl sections it holds and shows the ones that match, with their citations. Free, no sign-in.
