For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 14.4.05 — Design And Construction Provisions

Code of Ordinances, City of Starkville, Mississippi; partial · Starkville Code of Ordinances § 14.4.05

Corpus is an independent public-information project, not the official City of Starkville website. Stable reference: corpuslaw.us/code/53a511cc-1935-467e-ab58-fa75659b2a20

14.4.05 - Design And Construction Provisions

A. System design and equipment specifications: The utility facilities system of a particular public utility shall be constructed in accordance with the design requirements and equipment specifications, set forth by city ordinance applicable to such design requirement and such design requirements and equipment specifications as shall be established by city ordinance from time to time. B. New underground development: In cases of new construction or property development where utilities are to be placed underground, the developer or property owner shall give each public utility not less than 60 days notice of the particular date on which open trenching will be available for such utility's installation of conduit, pedestals, or vaults. Each public utility shall also timely provide specifications to the developer and property owner as needed for trenching. Costs of trenching, conduit, and easements required to bring service to any development shall be borne by the developer, provided, however, that each public utility shall be reimbursed such costs to the extent any public funds are available therefor, whether by grant or otherwise. C. Underground at multiple-dwelling units: In cause of utility services delivered aerially to multiple dwelling units, each public utility shall make reasonable efforts to minimize the number of individual aerial drop cables, giving preference to undergrounding of multiple drop cables between the pole and dwelling unit. D. Replacement of underground equipment: If a person residing within a public utility's underground facilities area requests replacement of existing equipment owned by such utility, then all labor, material, government or other agency permits and all other costs associated with such utility's replacement of the equipment shall be paid by the person making the request and shall be paid in advance of such utility performing the replacement work. E. Additional underground facilities: In those areas and portions of the city were the transmission or distribution facilities of all public utilities providing telephone service and those of all public utilities providing electric service are already placed or to be placed underground, subject to subsection (b) above, each public utility shall likewise construct, operate and maintain all of its transmission and distribution facilities underground. For the purposes of this paragraph, "underground" shall include a partial underground system, e.g., streamlining. Facilities in each utility's transmission and distribution lines must be in appropriate housings upon the surface of the ground as reasonably approved by the city engineer and/or the general manager of the electric department. The city shall not in any manner be responsible for any costs or liabilities incurred by any utility in placing such utility's facilities underground, except to the extent any public funds are available therefor, whether by grant or otherwise.

Ask a question about Starkville law

Corpus searches the Starkville sections it holds and shows the ones that match, with their citations. Free, no sign-in.