§ 802 — Zoning Official
Waveland Official-Site Ordinances; partial · Waveland, MS, Zoning Ordinance, art. VIII, § 802
Corpus is an independent public-information project, not the official City of Waveland website. Stable reference: corpuslaw.us/code/0944dc51-fea1-4ec1-a18c-60efcdd0b5d2
Section 802. Zoning Official
The Zoning Official, designated by the Board of Mayor and Alderman, shall receive applications, assist applicants and appellants in the procedures required hereunder, review development plans, issue zoning permits and act as Secretary to the Planning and Zoning Commission. The Zoning Official shall also administer the Zoning ordinance, Subdivision Ordinance, and other development related ordinances as necessary in coordination with the Building Official and other City Officials as needed. Section 803, Housing Stock Inventory 803.1 Housing Statistics to be Developed and Maintained. The Building Official and the Zoning Official shall jointly take inventory of and develop and maintain current information on the City of Waveland’s housing stock. Such information shall set forth the number of dwelling units per housing type to separately quantify the number of single family, duplex and multi-family dwelling units within the City of Waveland. Multi-family units shall be considered as three (3) or more dwelling units in one building. Multi-family complexes in excess of twelve (12) units shall be further identified by name and location. Information shall be updated timely as building permits are issued.
803.2 Annual Report Required. Each year no later than the second meeting of the Board of Mayor and Aldermen, the Building Official and the Zoning Official shall provide to the Board of Mayor and Aldermen and to the Planning and Zoning Commission a report on the status of the housing stock as of December 31 of the prior year. At a minimum, such report shall include a current tabulation of the various types of housing within the City and the identity and location of multi- family complexes with more than twelve (12) units and the total number of units in such complexes. The Building Official and the Zoning Official may also submit to the Board of Mayor and Alderman and the Planning and Zoning Commission recommendations with their report including, but not limited to, possible amendments to the Zoning Ordinance that may be warranted by changing housing trends. Section 804, Land Development Permit Required A Land Development Permit issued by the Building Official is required in advance of the initiation of the following activities on any site: clearing, grading, excavation, filling, and temporary or permanent road construction, unless such activities are specifically addressed and permitted pursuant to a Building Permit. Any drainage alteration including temporary culvert installation proposed to coincide with such activities shall be referred to the Public Works Director for review and permitting. Section 805, Application for a Land Development Permit 805.1 Applications for a Land Development Permit for site preparation for small scale developments exempt from the Development Plan review requirements of Section 808 shall include the following: A. A site plan, drawn to scale, showing the site boundaries, and existing conditions including, drives, roads, paved areas, structures, natural and manmade drainage ways on or abutting the site, rights of way across the property, tree masses, Live Oaks and Magnolia trees that meet the Section 409 preservation requirements. B. A site plan showing the proposed site work, including: temporary and permanent roads and drives, temporary and permanent culverts, drainage alteration, areas of excavation and fill, trees or tree masses to be cleared, trees to be preserved, and the dimensions and locations of structures and other improvements proposed to be subsequently constructed. C. Where feasible, the above plans may be combined. 805.2 Prior to issuing a Land Development Permit, the Building Official must receive from the Zoning Official written verification that the site is appropriately zoned for the activities and uses proposed or that the Board of Mayor and Alderman has conceptually approved a Preliminary Plat for the site.
805.3 Prior to issuing a Land Development Permit, the Building Official must receive from the Public Works Director written verification that the proposed activities are to be conducted consistent with the provisions of the Drainage Ordinance. 805.4 Extensive tree clearing or other site work proposed without any subsequent development proposed and detailed shall be allowed only by Site Plan Committee approval. 805.5 A Land Development Permit shall become invalid unless the work authorized by it shall have commenced within six (6) months of the date of issuance; and be cancelled by the Building Official if the work authorized by the permit is not substantially completed within one (1) year of the date of issuance. The Building Official shall give written notice that a permit has become invalid or expired and that further work shall not proceed unless, and until, a new Land Development Permit is issued.
Ask a question about Waveland law
Corpus searches the Waveland sections it holds and shows the ones that match, with their citations. Free, no sign-in.
