Sec. 22-202. - Arterial and collector street construction.

(a) Whenever new construction or reconstruction of an arterial or collector street is proposed, the city administrator shall be required to include in every recommendation to the city council a written report which shall address the following: (1) The impact of the proposal on people, property and environment, including the effects of the proposal on present and future land use, auto and pedestrian traffic, vegetation, physiography, aesthetics and the quality of air, water, light and sound; (2) Any adverse effects which cannot be avoided should the proposal be implemented; (3) Alternatives to the proposed action; (4) The relationship between short term effects and long term effects of the proposal. (b) In addition to preparing the written report on the project, the city administrator shall take the following actions: (1) Schedule a city council public hearing for the purpose of hearing all comments pertaining to the proposed work; (2) Publish notice of said hearing in a newspaper of general circulation in the city once each week during the two (2) weeks preceding the week in which the hearing will be held. Said notice shall generally describe the project, including the location of the projects by street name, and shall state the date, time and place at which the hearing will be held. (c) The following construction or reconstruction projects on arterial and collector streets are exempt from the requirements of the written report and the public hearing: (1) All maintenance activities performed by city personnel; (2) All preventive maintenance work performed by private contractors including, but not limited to, chip sealing, slurry sealing and overlays; (3) Removal and replacement of curb, gutter and sidewalk so long as the replacement is made on the existing alignment; (4) All work related to the removal, repair or replacement of existing underground utilities; (5) All work related to the removal, repair, replacement or upgrading of existing traffic signal; (6) All worked related to the installation of school crossing protection other than traffic signals; (7) Any other project may be specifically exempted from the requirement for either the written report or the public hearing, or both, by majority vote of the city council.

(Code 1967, § 13.08.575; Ord. No. 88-4766, § 1, 7-11-88)