For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 26-614 — Compliance and enforcement

City Code, Billings, Montana (Supp. No. 67: codified through Ordinance No. 26-5937, passed October 12, 2026) · Billings City Code § 26-614

Corpus is an independent public-information project, not the official City of Billings website. Stable reference: corpuslaw.us/code/824e96e7-3fbc-45a9-bee6-debcf9ec1a8d

Sec. 26-614. - Compliance and enforcement.

(a) Enforcement response plan. The city may adopt policies and procedures as set forth in the city's enforcement response plan for carrying out the provisions of this article, provided that such policies and procedures are not in conflict with this article or any applicable state or federal law or regulation. (b) Publication of industrial users in significant noncompliance. The city shall publish annually, in a newspaper of general circulation that provides meaningful public notice within the jurisdictions served by the POTW, a list of the significant industrial users which, at any time during the previous twelve (12) months, were in significant noncompliance with applicable pretreatment standards and requirements. In addition, any industrial user found to be in significant noncompliance with subsections (3), (4) or (8) shall also be published in the newspaper. The following criteria shall be used to define significant noncompliance: (1) Chronic violations of wastewater discharge limits, defined as those in which sixty-six (66) percent or more of all of the measurements taken during a six-month period exceed, by any magnitude, a numeric pretreatment standard or requirement, including instantaneous limits; (2) Technical review criteria (TRC) violations, defined as those in which thirty-three (33) percent or more of all of the measurements for each pollutant parameter taken during a six-month period equal or exceed the product of the numeric pretreatment standard or requirement including instantaneous limits multiplied by the applicable TRC (TRC = 1.4 for BOD, TSS, fats, oil, and grease and 1.2 for all other pollutants except pH); (3) Any other violation of a pretreatment standard or requirement (daily maximum, long-term average, instantaneous limit, or narrative standard) that the administrator determines has caused, alone or in combination with other discharges, interference or pass through, including endangering the health of city personnel or the general public; (4) Any discharge of a pollutant that has caused imminent endangerment to human health, welfare or the environment or has resulted in the city's exercise of its emergency authority to halt or prevent such a discharge; (5) Failure to meet, within ninety (90) days after the schedule date, a compliance schedule milestone contained in a local control mechanism or enforcement order for starting construction, completing construction or attaining final compliance; (6) Failure to provide, within thirty (30) days after the due date, required reports such as baseline monitoring reports, 90-day compliance reports, periodic self-monitoring reports and reports on compliance with compliance schedules; (7) Failure to accurately report noncompliance; or (8) Any other violation or group of violations which may include a violation of best management practices, which the administrator determines may adversely affect the operation or implementation of the local pretreatment program. (c) Administrative enforcement actions. (1) Notice of violation (NOV). When the city finds that an industrial user has violated, or continues to violate, any provision of this article, an industrial discharge permit, or order issued hereunder, or any other pretreatment standard or requirement, the city may serve upon the industrial user a written notice of violation. Within five (5) working days of the receipt of such notice, an explanation of the violation and a plan for the satisfactory correction of prevention thereof, to include specific required actions, shall be submitted by the industrial user to the city. Submission of such a plan in no way relieves the industrial user of liability for any violations occurring before or after receipt of the notice of violation. Nothing in this section shall limit the authority of the city to take any action, including emergency actions or any other enforcement action, without first issuing a notice of violation. (2) Suspension of service. Endangerment to health or welfare of the community: The city, through other than a formal notice to the affected industrial user, may immediately and effectively halt or prevent any discharge of pollutants into any natural waterway, surface drainage within the city, any area under jurisdiction of the city, the POTW of the city or any wastewater system tributary thereto, by any means available to them, including physical disconnection from the wastewater system, whenever it reasonably appears that such discharge presents an imminent endangerment to the health or welfare of the community. Endangerment to environment or treatment works: The city, after written notice to the industrial user may halt or prevent any discharge of pollutants into any natural waterway, surface drainage within the city, any area under jurisdiction of the city, the POTW, wastewater system tributary thereto, by any means available to them, including physical disconnection from the wastewater system, whenever such discharge presents or may present an endangerment to the environment or threatens to interfere with the operation of the POTW. Any person notified of a suspension of the wastewater treatment service and/or the industrial discharge permit shall immediately stop or eliminate the contribution. In the event of a failure of the person to comply voluntarily with the suspension order, the city shall take such steps as deemed necessary including immediate severance of the sewer connection, to prevent or minimize damage to the POTW system or endangerment to individuals or the environment. The city may reinstate the industrial discharge permit and/or the wastewater treatment service upon proof of the elimination of the non-complying discharge. A detailed written statement submitted by the industrial user describing the causes of the harmful contribution and the measure taken to prevent any future occurrence shall be provided to the city within five (5) days of the date of occurrence. Suspension of service shall not be a bar against, or a prerequisite for, taking any other action against the industrial user. (3) Administrative compliance order. When the city finds that an industrial user has violated, or continues to violate, any provision of this article, an industrial discharge permit, or order issued hereunder, or any other pretreatment standard or requirement, the city may issue an order to the industrial user responsible for the discharge directing that the industrial user come into compliance within a specific time. If the industrial user does not come into compliance within the time provided, sewer service may be discontinued unless adequate treatment facilities, devices, or other related appurtenances are installed and properly operated. Compliance orders also may contain other requirements to address the noncompliance, including additional self-monitoring and management practices designed to minimize the amount of pollutants discharged to the POTW. A compliance order may not extend the deadline for compliance established for a pretreatment standard or requirement, nor does a compliance order relieve the industrial user of liability for any violation, including any continuing violation. Issuance of a compliance order shall not be a bar against, or a prerequisite for, taking any other action against the industrial user. (4) Consent order. The city may enter into a consent order, assurances of compliance, or other similar documents establishing an agreement with any industrial user responsible for noncompliance. Such documents shall include specific actions to be taken by the industrial user to correct the noncompliance within a time period specified by the document. A consent order may include penalties, supplemental environmental projects, or other conditions and requirements as agreed to by the city and the industrial user. (5) Show cause hearing. (i) The city may order any industrial user who causes or allows an unauthorized discharge to enter the POTW to show cause before the administrator why the proposed enforcement action should not be taken. A notice shall be served on the industrial user specifying the time and place of a hearing to be held by the administrator regarding the violation, the reasons why the proposed action is to be taken, and directing the industrial user to show cause before the administrator why the proposed enforcement action should not be taken. The notice of the hearing shall be served personally or be sent by registered or certified mail (return receipt requested) at least ten (10) days before the hearing. Service may be made on any agent or officer of a corporation. (ii) The administrator may conduct the hearing and take the evidence, or may designate one or more persons to conduct the hearing and to take the following actions: (A) Issue subpoenas requesting the attendance and testimony of witnesses and the production of evidence relevant to any matter involved in such hearings, The administrator or the industrial user may petition the municipal court to enforce any subpoena issued pursuant to this section through the court's contempt powers. (B) Receive evidence from both the industrial user and the administrator on any relevant issue involved in such hearings, provided however, that the Montana Rules of Evidence shall not apply strictly to such evidence. (C) Transmit a report of the evidence and hearing, including transcripts and other evidence, together with recommendations to the administrator for final action thereon. (iii) At any hearing held pursuant to this article, testimony taken must be under oath and recorded. The transcript of testimony will be made available to any member of the public and any party to the hearing upon payment of reasonable charges for the preparation thereof. The hearing may be suspended or continued from time to time in the discretion of the presiding officer, provided that all evidence is received and the hearing is closed within sixty (60) days after it is commenced. (iv) After the administrator has reviewed the evidence, they may issue an order of findings and take an action or no action as necessary and appropriate. (6) Cease and desist order. (i) When the administrator finds that an industrial user is violating this article, an industrial discharge permit, any order issued hereunder, or any other pretreatment standard or requirement, or that the industrial user's past compliance history indicates that violations are likely to recur, the administrator may issue an order to the user directing it to cease and desist all such violations and directing the industrial user to: (A) Immediately comply with all requirements; (B) Take such appropriate remedial or preventive action as may be needed to properly address a continuing or threatened violation, including halting operations and/or terminating the discharge. (ii) Issuance of a cease and desist order shall not be a bar against, or a prerequisite for, taking any other action against the industrial user. (7) Administrative fines. When the city finds that an industrial user has violated, or continues to violate, any provision of this article, an industrial discharge permit, or order issued hereunder, or any other pretreatment standard or requirement, the city may fine such industrial user in an amount not to exceed one thousand dollars ($1,000.00) per day per violation. Such fines shall be assessed on a per-violation, per day basis. In the case of monthly or other long-term average discharge limits, fines may be assessed for each day during the period of violation. Issuance of an administrative fine shall not be a bar against, or prerequisite for, taking any other action against the industrial user. (d) Judicial enforcement remedies. (1) Injunctive relief. When the city finds that an industrial user has violated, or continues to violate, any provision of this article, an industrial discharge permit, or order issued hereunder, or any other pretreatment standard or requirement, the city may petition the Billings Municipal Court for the issuance of a temporary or permanent injunction, as appropriate, which restrains or compels the specific performance of the industrial discharge permit, order, or other requirement imposed by this article on activities of an industrial user. The city may also seek such other action as is appropriate for legal and/or equitable relief, including a requirement for the industrial user to conduct environmental remediation. A petition for injunctive relief shall not be a bar against, or a prerequisite for, taking any other action against an industrial user. (2) Civil penalties. (i) An industrial user who has violated, or continues to violate, any provision of this article, an industrial discharge permit, or order issued hereunder, or any other pretreatment standard or requirement shall be liable to the city for a maximum civil penalty not to exceed one thousand dollars ($1,000.00) per day per violation. In the case of a monthly or other long-term average discharge limit, penalties may accrue for each day during the period of violation. (ii) The city may recover reasonable attorneys' fees, court costs, and other expenses associated with enforcement activities, including sampling and monitoring expenses, and the cost of any actual damages incurred by the city. (iii) In determining the amount of civil liability, the city shall take into account all relevant circumstances including, but not limited to, the extent of harm caused by the violation, the magnitude and duration of the violation, any economic benefit gained through the industrial user's violation, corrective actions by the industrial user, the compliance history of the industrial user, and any other factor as justice requires. (iv) Filing a suit for civil penalties shall not be a bar against, or a prerequisite for, taking any other action against an industrial user. (3) Civil/administrative fine pass through. In the event that an industrial user discharges such pollutants which cause the city to violate any condition of its MPDES permit and the city is fined by the EPA or the state for such violation, then such industrial user shall be fully liable for the total amount of the fine assessed against the city by the EPA and/or the state. (4) Criminal prosecution. (i) Any industrial user who violates or fails to comply with any provision of this article or with any orders, rules, regulations, permits and permit conditions issued hereunder, shall, upon conviction, be guilty of a misdemeanor. The penalty for such misdemeanor shall be a fine not to exceed five hundred dollars ($500.00) or by imprisonment not to exceed six (6) months, or both. (ii) Any industrial user who knowingly makes, authorizes, solicits, aids, or attempts to make any false statement, representation or certification in any hearing, or in any permit application, record, report, plan or other document filed or required to be maintained pursuant to this article, or who falsifies, tampers with, bypasses, or knowingly renders inaccurate any monitoring device, testing method, or testing samples required under this article, shall, upon conviction, be guilty of a misdemeanor, punishable by a fine not to exceed five hundred dollars ($500.00) or imprisonment not to exceed six (6) months, or both. (iii) The city may refer violations that warrant criminal prosecution to the U.S. Attorney General's Office, State Attorney General or USEPA Criminal Investigation Division or other appropriate agency. Such referral shall not preclude the city from taking a parallel administrative or civil enforcement action. (e) Cost recovery. In any judicial action, the city may recover reasonable attorney fees, court costs, deposition and delivery costs, expert witness fees, and other expenses of investigation, enforcement action, administrative hearings, and litigation if the city prevails in the action or settles at the request of the defendant. Any person who violates any of the provisions of this article or the rules and regulations shall become liable to the city for any expense, loss, or damage to the city or to the POTW occasioned by such violation including, but not limited to, investigative/monitoring expenses, fines, penalties, cleaning, repair or replacement work caused by and in connection with the violation. In addition, upon proof of willful or intentional meter bypassing, meter tampering, or unauthorized metering, the city shall be entitled to recover as damages three (3) times the amount of actual damages. (f) Remedies nonexclusive. The remedies provided for in this article are not exclusive of any other remedies that the city may have under the provisions of state law.

(Ord. No. 13-5600, § 1(Att. A), 5-28-13)

Ask a question about Billings law

Corpus searches the Billings sections it holds and shows the ones that match, with their citations. Free, no sign-in.