§ 28-401 — Required construction submittals
City Code, Billings, Montana (Supp. No. 67: codified through Ordinance No. 26-5937, passed October 12, 2026) · Billings City Code § 28-401
Corpus is an independent public-information project, not the official City of Billings website. Stable reference: corpuslaw.us/code/84de16ba-bf63-41a3-964c-52984ceb15e4
Sec. 28-401. - Required construction submittals.
(a) Any construction within the city's MS4 area shall comply with the provisions of this chapter, city's stormwater management manual, and the state's general permit for storm water discharges associated with construction activity (Montana Code Annotated (MCA) 75-5-101, Administrative Rules of Montana (ARM 17.30.1301 and ARM 17.30.601)). The city will require at a minimum an executed copy of the state standard notice of intent (NOI) form for a storm water discharge associated with construction activity under the general permit and a storm water pollution prevention plan (SWPPP), and a notice of termination (NOT) for construction sites either one acre or larger, for each phase of a construction site that exceeds one acre, or within fifty (50) feet of any water course including irrigation and stormwater ditches for construction sites of less than one acre. (b) Any person performing support activities related to a construction site (e.g. concrete or asphalt batch plants, equipments staging yards, material storage areas, etc.) within the city's MS4 area may require the following NOI, SWPPP, NOT, similar to the requirements of construction activity provided that: (1) The support activity is not a commercial operation serving multiple unrelated construction projects and does not operate beyond the completion of the construction activity. (2) Appropriate controls and measures are identified in the SWPPP for discharge from support activity. (3) The support activity disturbs an area that is one acre or greater in size or is within fifty (50) feet of any water course. (c) In accordance with the state's reporting requirements the property owner shall also notify the city when there is any facility contact change, any spill or release, any finding that there has been non-compliance with the SWPPP. (d) The city shall conduct all inspections of any construction activities requiring a SWPPP for all work within the MS4 area. (e) The city will enforce the requirements under the state's general permit for storm water discharges associated with construction activity in whole or in part determined by the city's enforcement agent. (f) The operator shall retain completed and signed copies of the NOI, MDEQ's confirmation letter for receipt of the NOI package, and a SWPPP at the construction activity project site at all times during the coverage period. If the operator does not maintain a permanent office or building at the project site, copies of these documents shall be retained at the operator's office and shall be brought to the project site by the operator responsible for implementation of the SWPPP. (g) Upon failure of the operator to take corrective actions on or prior to a required date on a reported or observed spill or the potential to release pollutants, including sediment, into the stormwater system, the city may either perform the corrective work or employ contractors to do the same. The contractor shall reimburse the city for all expenditures pertaining to the corrective action in accordance with section 28-505. (h) The city's enforcement agent has the authority to issue a stop work order pursuant to the remediation of a current violation or the potential of a violation of this chapter in accordance with article 18-300. (i) An authorized enforcement agent shall establish the appropriate frequencies for inspection of construction stormwater pollution prevention measures or BMPs at all active construction sites. (j) The permittee or his/her agent will be required to perform regularly scheduled site inspections, at least every fourteen (14) calendar days, and within ten (10) calendar days after major storm events to ensure all BMPs have been constructed and are functioning properly. The purpose of such inspections will be to determine the overall effectiveness of the control plan and the need for additional control measures. Permittee shall document all inspections in writing and made available for review by the city.
(Ord. No. 10-5505, § 1, 3-22-10)
Ask a question about Billings law
Corpus searches the Billings sections it holds and shows the ones that match, with their citations. Free, no sign-in.
