§ 6-1651 — Variances
City Code, Billings, Montana (Supp. No. 67: codified through Ordinance No. 26-5937, passed October 12, 2026) · Billings City Code § 6-1651
Corpus is an independent public-information project, not the official City of Billings website. Stable reference: corpuslaw.us/code/22ec6ce5-51e4-423e-9ab7-80a72ed5cde4
Sec. 6-1651. - Variances.
(a) A variance from the minimum development standards of these regulations may be allowed. An approved variance would permit construction in a manner otherwise as required or prohibited by these regulations. (b) Variance application requirements: (1) A completed floodplain permit application and required supporting material must be submitted; (2) Additionally, a completed variance application specific to the variance request including facts and information addressing the criteria in this section must be submitted; and (3) If the floodplain permit application and variance application is deemed not correct and complete, the floodplain administrator shall notify the applicant of deficiencies within a reasonable time not to exceed thirty (30) days. Under no circumstances should it be assumed that the variance is automatically granted. (b) Floodplain variance application notice requirements. Public notice of the floodplain permit and variance application shall be given pursuant to section 6-1644. (c) Evaluation of variance application. (1) A variance shall only be issued upon a determination that the variance is the minimum allowance necessary, considering the flood hazard, to afford relief from these regulations when all of the findings are met: a. There is a good and sufficient cause other than or in addition to financial hardship; b. Failure to grant the variance would result in exceptional hardship to the applicant; c. There is no basement or residential dwelling that has the lowest floor elevation below the base flood elevation; d. Any enclosure including a crawl space must meet the requirements of subsection 6-1662(b)(1)m., wet floodproof, if the enclosure interior grade is at or below the base flood elevation; e. Granting of a variance will not result in increased flood heights to existing insurable buildings, additional threats to public safety, extraordinary public expense, the creation of any public nuisances, fraud upon or victimization of the public, or create any conflict with other existing local laws or ordinances; f. The proposed use is adequately floodproofed; g. The variance is the minimum necessary, considering the flood hazard, to afford relief; h. Reasonable alternative locations are not available; i. No encroachment that causes an increase to the base flood elevation unless an alteration has been approved pursuant to subsection 6-1662(b); and j. All other criteria for a floodplain permit besides the specific development standard requested by variance are met. (d) Special considerations for variance approval. (1) If the new construction or substantial improvements on a lot of one-half (½) acre or less is contiguous to and surrounded by lots of existing structures constructed below the base flood elevation, a variance may be approved. However, as lot sizes increase beyond one-half (½) acre additional technical justification the floodplain administrator may require additional technical justification; and (2) Historic structures. Variances may be issued for the repair or rehabilitation of historic structures upon a determination that the proposed repair or rehabilitation will not preclude the structure's continued designation as a historic structure and the variance is the minimum relief necessary to preserve the historic character and design of the structure. If the historic nature of the building has been designated as a preliminary or historic structure by U.S. Secretary of Interior or an approved state or local government historic preservation program. (e) Decision. The board of adjustment shall: (1) Evaluate the application using the criteria and findings in this section, the application requirements and minimum development standards in divisions 9 and 10. (2) Hear, make findings, and approve, conditionally approve or deny a variance within sixty (60) days of a complete application. (3) Attach conditions to the granting of variance including a project completion date and inspections during and after construction. (4) Notify the applicant that the issuance of a variance and permit to construct a structure below the base flood level may result in increased premium rates for flood insurance and that flood insurance premiums are determined by actuarial risk and will not be modified by the granting of a variance. (5) Submit to the floodplain administrator a record of all actions involving a floodplain permit and variance, including the findings and decision and send a copy of each variance granted to DNRC. (f) Judicial review. Any person or persons aggrieved by the variance decision may appeal such decision in accordance with BMCC sections 6-1652, et seq.
(Ord. No. 13-5616, § 2, 10-28-13)
Ask a question about Billings law
Corpus searches the Billings sections it holds and shows the ones that match, with their citations. Free, no sign-in.
