For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 34.08.080 — Application

Bozeman Municipal Code, City of Bozeman, Montana (Codified through Order No. 2026-11, adopted September 15, 2026. (Supp. No. 16, Update 1)) · Bozeman Municipal Code § 34.08.080

Corpus is an independent public-information project, not the official City of Bozeman website. Stable reference: corpuslaw.us/code/a86da947-545c-4e61-8e1d-363f82a241a3

Sec. 34.08.080. - Application.

A. A person seeking a parade or public assembly permit shall file an application with the city manager on forms provided by the city, and the application shall be signed by the applicant. B. For single, nonrecurring parades or public assemblies, an application for a permit shall be filed with the city manager at least 15 working days and not more than 180 days before the parade or public assembly is proposed to commence. The city manager may waive the minimum filing period and accept an application filed within a shorter period if, after due consideration of the date, time, place, and nature of the parade or public assembly, the anticipated number of participants, and the city services required in connection with the event, the city manager determines that the waiver will not present a hazard to public safety, or if the required timeframe would substantially burden protected rights, including speech and assembly, as to matters of public concern, and the expedited review process would allow reasonable review to address substantial matters of public safety, welfare, and convenience. C. For parades or public assemblies held on a regular or recurring basis at the same location, an application for a permit covering all such parades or assemblies during that calendar year may receive approval of all recurring events within that calendar year on one application, but a separate application fee for each occurrence must be paid. These applications shall be filed with the city manager at least 60 days and not more than 180 days before the date and time at which the first such parade or public assembly is proposed to commence. The city manager may waive the minimum 60-day period after due consideration of the factors specified in subsection B of this section. D. The application for a parade or public assembly permit shall be made on a form provided by the city and shall include all information deemed relevant to the requested event. E. If an application for a permit is denied, the city assumes no liability for expenses incurred by the applicant.

(Code 1982, § 12.32.040; Ord. No. 1458, § 1, 1998; Ord. No. 1798, § 9(12.32.080), 4-25-2011)

Ask a question about Bozeman law

Corpus searches the Bozeman sections it holds and shows the ones that match, with their citations. Free, no sign-in.