For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 38.410.070 — Municipal water, sanitary sewer and storm sewer systems

Bozeman Municipal Code, City of Bozeman, Montana (Codified through Order No. 2026-11, adopted September 15, 2026. (Supp. No. 16, Update 1)) · Bozeman Municipal Code § 38.410.070

Corpus is an independent public-information project, not the official City of Bozeman website. Stable reference: corpuslaw.us/code/f02dcdca-ea09-4fe4-8ce4-49dbd09d2234

Sec. 38.410.070. - Municipal water, sanitary sewer and storm sewer systems.

A. General. All municipal water supply, sanitary sewer and storm sewer system facilities must comply with the following requirements: 1. The developer must install complete municipal water and sanitary sewer system facilities, and may be required by the city to install municipal storm sewer system facilities. These systems must be installed in accordance with the requirements of the state department of environmental quality and the city, and must conform with any applicable facilities plan. The city's requirements are contained in the City of Bozeman Design and Construction Standards and the City of Bozeman Modifications to Montana Public Works Standard Specifications, and by this reference these standards are incorporated into and made a part of these regulations. The developer must submit plans and specifications for the proposed facilities to the city and to the state department of environmental quality and must obtain their approvals prior to commencing construction of any municipal water, sanitary sewer or storm sewer system facilities. 2. The cutting of any city street must be done in compliance with the city's street cut policy and City of Bozeman Design and Construction Standards. 3. When a proposed development adjoins undeveloped land, and municipal infrastructure mains would reasonably pass through the new development to the undeveloped land, municipal infrastructure mains must be arranged to allow the suitable development of the adjoining undeveloped land. Municipal infrastructure mains within the proposed development must be constructed to the boundary lines of the tract to be developed, unless prevented by topography or other physical conditions. An exception to this standard may be granted upon written request of the applicant if the applicant demonstrates during the development review process that more efficient design can be accomplished without jeopardizing the public's health, safety and welfare, the purpose of this chapter, or the purpose of the city's land use plan. B. Municipal water supply system; additional requirements. Municipal water supply system facilities must also comply with the following requirements: 1. When the city's municipal water main is extended, the length of a dead-end water main typically may not exceed 500 feet in length, unless approved in writing by the city. 2. The length of service lines from the main to the structure may not exceed 150 feet in length, unless approved in writing by the city. C. Municipal infrastructure requirements and alternative compliance. 1. Whenever any building lots and/or building sites are created inside the city limits or existing lots are annexed, and prior to the issuance of any building permits on such lots or sites, municipal water distribution, municipal sanitary sewer collection, and streets must be provided to the site. Each building site must utilize and be connected to both the municipal water distribution and municipal sanitary sewer collection systems. Installation of improvements is subject to 38.780. a. Alternative. When, in the city's sole determination, it is in the city's long term best interests to allow a building lot or site to be created or developed without immediate access to either municipal water or municipal sewer the city may, at its sole discretion, make such allowance when all of the following have been met: (1) The non-municipal system to service the lot or site must be designed, reviewed and constructed to meet city standards. Systems serving more than one lot or user must be central systems; (2) The non-municipal system must be designed and constructed in a manner to allow connection to the municipal system components shown in applicable facility plans to serve the property at such time as it becomes available; (3) The landowner must provide waivers of right to protest creation of special improvement districts or other financing methods to extend municipal water and sewer services. Such extensions or connections may require construction of system components that are not immediately adjacent to the building lot or site; (4) The landowner must agree to connect to municipal water and sewer services and abandon and remove non-municipal services when so instructed by the city. Such agreement must be binding on all successors and run with the land; (5) If the city takes responsibility to operate the non-municipal system it may impose a surcharge to cover extra operational expenses. City operation of the system is at the city's discretion; (6) The requirement for future connection to the municipal water and/or sewer system, waivers and agreements, and other applicable materials must be either noted on the plat or final plan or a separate notice be recorded at the county clerk and recorder's office so that such notice will appear on a title report or abstract of the property; (7) No non-municipal water or sewer systems must be constructed until all necessary approvals from the state department of environmental quality, City of Bozeman, county health department, and any other relevant agency have been received; and (8) The use of municipal water or sewer systems is considered to be the best means to protect the public interest and welfare. The alternative for the use of non-municipal systems is intended to be used sparingly and in extraordinary circumstances. In order to protect the public interest, in approving a non-municipal system the city may impose such conditions of approval as it deems necessary. 2. These improvements must be designed, constructed and installed according to the standards and criteria as adopted and approved by the city prior to the issuance of any building permits. 3. The issuance of a building permit may be allowed prior to completion of the public infrastructure, provided the criteria, standards, and limitations of 38.780.030 are met.

(Ord. No. 2025-12, § 4(Exh. A), 12-16-2025)

Ask a question about Bozeman law

Corpus searches the Bozeman sections it holds and shows the ones that match, with their citations. Free, no sign-in.