§ 38.610.090 — Wetland approval conditions

Bozeman Municipal Code, City of Bozeman, Montana (Codified through Order No. 2026-11, adopted September 15, 2026. (Supp. No. 16, Update 1)) · Bozeman Municipal Code § 38.610.090

Corpus is an independent public-information project, not the official City of Bozeman website. Stable reference: corpuslaw.us/code/e03fa2a3-d5dc-445c-bc0b-281d20a0b386

Sec. 38.610.090. - Wetland approval conditions.

The review authority may require mitigation as provided for in 38.610.100 and impose conditions of approval for proposed regulated activities that are necessary to mitigate impacts to wetlands, or which are necessary to mitigate infringement upon wetlands and wetland buffers, or negative indirect or direct effects on the functionality of wetlands and wetland buffers. Conditions of approval may include but are not limited to, the following: A. Notwithstanding the minimum wetland buffer, requiring a wetland buffer of a size appropriate for the proposed activity and the regulated wetland as determined by the review authority; B. Requiring structures be appropriately supported and elevated or otherwise protected against hazards; C. Modifying proposals for waste disposal, stormwater, or water supply facilities; D. Requiring protective covenants between the landowner and the city regarding the future development, use, and subdivision of lands, including but not limited to the preservation of undeveloped areas as open space and restrictions on vegetation removal; E. Requiring a protective covenant between the landowner and the city stating the measures that will be taken to protect all water resources, mitigation, and buffer areas; F. Requiring erosion control and stormwater best management practices (BMPs); G. Clustering structures or development; H. Restricting fill, deposit of soil, and other activities which may be detrimental to a wetland; I. Modifying the project design to ensure a reliable source and flow of water to the regulated wetland; J. Requiring or restricting maintenance of a regulated wetland area for the purpose of maintaining wetland functions; K. Requiring a mitigation monitoring report to be submitted to the review authority (the period and frequency of the reporting will be determined on a case-by-case basis); and L. Requiring that all reasonable effort be made to limit indirect impacts to vegetation and hydrological connectivity in the site design.

(Ord. No. 2025-12, § 4(Exh. A), 12-16-2025)