Sec. 38.700.100. - Building permit requirements.
A. No building or other structure may be erected, moved, added to or structurally altered and no land use may be changed without valid permits as prescribed in this division. 1. Only minor site surface preparation and normal maintenance is allowed prior to conditional approval by the appropriate review authority and the issuance of a building permit, provided such activity does not include excavation for foundations or the removal of mature, healthy vegetation. Minor site surface preparation means disturbing less than one-half acre, movement of 30 cubic yards or less of material, or a cut or fill of less than cumulative one foot whichever is less. Any excavation and site disturbance must be in conformance with an approved Stormwater Pollution Prevention Plan as described in 40.04.350. No excavation of foundations or setting of forms can commence until final site or sketch plan approval has been granted and until building permits have been issued. Proceeding prior to building permit issuance is at the hazard of the landowner. a. Exception. The issuance of building permits may be allowed prior to completion of infrastructure improvements, pursuant to the concurrent construction provisions established in 38.780. 2. Building permit. Within the limits of the city, building permits must be obtained as provided by 10.02.020. 3. Based upon an approved sketch, site plan, certificate of appropriateness, or special use permit (hereinafter referred to as "plan"), and after any appeals have been resolved, a building permit for the site may be requested and may be granted, provided such building permit is granted within one year of plan approval. Prior to lapse of one year, the applicant may seek an extension as allowed in 38.250 and 38.740.
(Ord. No. 2025-12, § 4(Exh. A), 12-16-2025)
Ask a question about Bozeman law
Corpus searches the Bozeman sections it holds and shows the ones that match, with their citations. Free, no sign-in.