§ 40.04.360 — Stormwater management

Bozeman Municipal Code, City of Bozeman, Montana (Codified through Order No. 2026-11, adopted September 15, 2026. (Supp. No. 16, Update 1)) · Bozeman Municipal Code § 40.04.360

Corpus is an independent public-information project, not the official City of Bozeman website. Stable reference: corpuslaw.us/code/f2c62d16-28de-41d2-9509-b7a4c7752d7f

Sec. 40.04.360. - Stormwater management.

A. Erosion control. Owner/operator shall: 1. Stabilize disturbed soil using recommended methods described in the city's Stormwater Master Plan; 2. Stabilize or cover soil stockpiles to prevent sediment runoff or blowing of dust or sediment from the site; 3. Prevent upland runoff that may erode disturbed slopes. B. Sediment control. Owner/operator shall: 1. Provide sediment controls in the form of settling basins or traps, temporary seeding, perimeter controls or other BMP described in the city's Stormwater Master Plan; 2. Where possible, design settling basins in a manner that allows adaption to provide long-term stormwater management; 3. Protect adjacent properties by the use of a vegetative buffer, silt fence, fiber roles, or other appropriate BMP as outlined in the city's Stormwater Master Plan. C. Construction site access. Owner/operator shall: 1. Limit the number of temporary access entrances onto a construction site; 2. Implement BMP's to ensure that sediment is not tracked onto public streets or alleys by construction vehicles, or washed into storm drains. D. Removal of temporary erosion control devices. Owner/operator shall remove all temporary erosion control devices upon establishing 70 percent or greater permanent ground cover on a lot. E. Emergency construction. Owner/operator shall clean up or contain sediment or debris resulting from the emergency construction activity in response to emergencies where services are being restored by a franchised utility company or contractor which are not subject to the requirements of a SWPPP. F. Construction waste management. Owner/operator shall at a minimum, control waste such as discarded building materials, concrete truck washout water, chemicals, litter, and sanitary waste at the construction site that may adversely impact adjoining property, public rights-of-way, or the stormwater collection system. Failure to maintain good housekeeping practices at the construction site is a violation of this article. G. Site inspection. 1. An authorized enforcement agent shall establish the appropriate frequencies for inspection of construction stormwater pollution prevention measures or BMPs at all active construction sites. 2. The permittee or the permittee's agent will be required to perform regularly scheduled site inspections, at least every 14 calendar days, and within 24 hours after major storm events to ensure all BMPs have been constructed and are functioning properly. The purpose of such inspections will be to determine the overall effectiveness of the control plan and the need for additional control measures. The permittee shall document all inspections in writing and make inspection records available for review by the city.

(Ord. No. 1763, § 1(14.06.020), 3-22-2010)

Ask a question about Bozeman law

Corpus searches the Bozeman sections it holds and shows the ones that match, with their citations. Free, no sign-in.