§ 40.04.700 — Requirements
Bozeman Municipal Code, City of Bozeman, Montana (Codified through Order No. 2026-11, adopted September 15, 2026. (Supp. No. 16, Update 1)) · Bozeman Municipal Code § 40.04.700
Corpus is an independent public-information project, not the official City of Bozeman website. Stable reference: corpuslaw.us/code/52757fdf-66b0-45ab-a0d1-9ec0ed16d4b1
Sec. 40.04.700. - Requirements.
A. To control the quality, volume and rate of stormwater runoff to storm drains and prevent the deterioration of water quality, all new developments and redevelopment projects will be required to submit a stormwater management plan or a comprehensive drainage plan to the city engineering department for approval. The stormwater master plan and city Design Standards establish standards and guidelines for implementing BMPs and stormwater management is incorporated by reference and made part of this article. 1. A comprehensive drainage plan is required for all development larger than five acres. 2. A stormwater management plan is required for all developments equal to or less than five acres and are designated as a sketch plan or larger in accordance to chapter 38, article 19, or are within 50 feet of a watercourse. 3. Redevelopment projects will be required to submit stormwater management plans or operation and maintenance plans if they meet the criteria found in the stormwater master plan, Design Standards, chapter 38, article 19, or this article. 4. Stormwater management plans and comprehensive drainage plans shall: a. Prevent any off-site direct discharge of untreated stormwater and non-stormwater from development or redevelopment improvements. b. Minimize increased post-development discharge rates or volumes. c. Provide for the removal of total suspended solids or other constituents so as to meet the median concentration of the state general permit for MS4s generated from development or redevelopment runoff prior to any off-site discharge. d. Continue BMPs for appropriate periods of time. e. Protect groundwater from development runoff infiltration. f. Implement accepted BMPs to minimize impact of a development on existing offsite infrastructure and stormwater facilities. g. Address other stormwater issues identified by the city. h. Comply with section II of the city Design Standards, and chapter 38, article 23. 5. All drainage system reports, peak flow rates and runoff volume calculations, safety requirements, and grading plans shall be certified by a licensed professional authorized by the state to perform such functions. 6. The city reserves the right to amend, modify and/or add requirements to the stormwater master plan.
(Ord. No. 1763, § 1(14.10.010), 3-22-2010)
Ask a question about Bozeman law
Corpus searches the Bozeman sections it holds and shows the ones that match, with their citations. Free, no sign-in.
