For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 4.5-51 — Tests and performance monitoring

Asheville, North Carolina Code of Ordinances (2026 S-5) · Asheville City Code § 4.5-51

Corpus is an independent public-information project, not the official City of Asheville website. Stable reference: corpuslaw.us/code/2c1966ae-0021-45db-86e7-04a4148e9cf8

Sec. 4.5-51. Tests and performance monitoring.

(a) Completion tests. Not later than 60 days after any new or substantially rebuilt portion of the cable system is made available for service to subscribers, and thereafter semi-annually pursuant to the FCC's technical standards during the term of the franchise, the franchisee shall conduct technical performance tests to demonstrate full compliance with the technical standards and guidelines of the FCC or other applicable governmental authority. (b) Methodology. Such tests shall be performed by, or under the supervision of a qualified registered professional engineer. Upon request of the city, a copy of the report shall be submitted to the city, describing test results, instrumentation, calibration, and test procedures, and the qualification of the engineer responsible for the tests. (c) Test points. System monitor test points shall be established pursuant to the FCC technical standards. (d) Regulatory tests. In addition to the performance test reports required herein, a copy of any performance test reports required by the FCC or other governmental authority shall be submitted to the city within ten days of the city's request. (e) City required tests. Whenever there have been repeated or multiple complaints made or when there exists other relevant evidence, which would reasonably cast doubt on the compliance of the franchisee's cable system or system facilities with applicable standards, the city shall notify the franchisee in writing of any deficiencies and may require the franchisee to test, analyze, and report on the performance of its system at the expense of the franchisee. In the event any deficiencies are not corrected, the city may require additional tests, full or partial repeat tests, different test procedures, or tests involving a specific subscriber's terminal at the expense of the franchisee. Tests shall be conducted within a reasonable time after requested but not later than 30 days unless mutually agreed upon by the parties hereto. Reports on such tests shall be delivered to the city no later than 14 days after completion of the tests. The report shall include the following information: a summary of the reasons for conducting the tests; the cable system component tested; the procedures employed in said testing; the results of such tests; and methods by which any complaints were resolved. Said tests and analyses shall be supervised by a qualified engineer who shall sign all records of the special tests and forward same to the city with a report interpreting the results of the tests and recommending what actions should be taken. If requested by the city, the franchisee shall retain an independent engineer to conduct such tests. All such tests by an independent engineer shall be at the expense of the city unless the test results confirm the presence of material noncompliance with applicable standards and, in that event, the franchisee shall pay all costs, fees and expenses of the independent engineer. (f) General maintenance. The franchisee shall maintain wires, cables and all other real and personal property and facilities constituting the cable system in good condition, order and repair at all times during the term of the franchise. (g) Maintenance log. The franchisee shall maintain an annual log showing the date, approximate time and duration, type and probable cause of all cable system outages, whole or partial, due to causes other than routine testing or maintenance. The entries in such log shall be retained by the franchisee for one additional year and shall be subject to inspection and copying by the city or its designee during the franchisee's regular business hours upon reasonable request. (h) Service interruption. Except where there exists an emergency situation necessitating a more expeditious procedure, the franchisee shall use reasonable efforts to schedule planned service interruptions for the purpose of repairing, upgrading or testing the cable system, only during periods of minimum use, and after using reasonable efforts to notify affected subscribers. (Ord. No 2496, § 21, 6-23-98)

Ask a question about Asheville law

Corpus searches the Asheville sections it holds and shows the ones that match, with their citations. Free, no sign-in.