For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 59-45 — Renewable energy generation rider

Code of Ordinances, City of Concord, North Carolina (Supp. 53 Update 2: codified through Ordinance No. 26-83, enacted August 13, 2026 (online updated September 15, 2026)) · Concord Code of Ordinances § 59-45

Corpus is an independent public-information project, not the official City of Concord website. Stable reference: corpuslaw.us/code/cccc0749-57fd-41c7-bb0d-10004a5f0bf1

Sec. 59-45. - Renewable energy generation rider.

(a) Availability. This schedule is available in conjunction with any of the city's rate schedule(s) applicable to a customer who operates an approved renewable energy generating system located and used at the customer's primary residence or business. The rated capacity of the generating system shall not exceed 20 kilowatts for a residential system, or 2 megawatts for a nonresidential system. The generating system that is connected in parallel operation with service from the city and located on the customer's premises must be manufactured, installed and operated in accordance with governmental and industry standards, in accordance with all requirements of the local code official, and must fully conform with the city's applicable renewable energy generation application. (b) Applicability. This schedule is applicable to all electric service of the same available type supplied at customer's premises at one point of delivery through one kilowatt-hour meter. (c) Type of service. The types of service to which this schedule is applicable are alternating current, 60 hertz, single-phase 2 or 3 wires, or 3-phase 3 or 4 wires at city's standard voltages. (d) Monthly credit and rates. The monthly credit and rates for this rider shall be as written in subsection 59-40(a). (e) Special conditions. (1) The customer must complete any applicable renewable energy interconnection request documents and submit same to the City of Concord for approval prior to receiving service under this schedule. (2) The customer's service shall be metered with two or more electric meters, one of which measures all energy provided by the city and used by the customer and the other measures the amount of energy generated by the customer's alternative energy generator. (3) The city reserves the right to test the customer's alternative energy generator and associated equipment for compliance with the applicable interface criteria. Should it be determined that customer's installation is in violation, the city will disconnect the alternative energy generator from the city's distribution system and it will remain disconnected until the installation is brought back into compliance. (4) An application fee shall be charged as stated in subsection 59-40(a). (f) Payments. See subsection 59-40(b).

(Ord. No. 10-01, § 1, 1-14-2010; Ord. No. 11-16, § 1, 3-10-2011)

Ask a question about Concord law

Corpus searches the Concord sections it holds and shows the ones that match, with their citations. Free, no sign-in.