§ 59-47 — Residential service schedule RE electric water heating and space conditioning
Code of Ordinances, City of Concord, North Carolina (Supp. 53 Update 2: codified through Ordinance No. 26-83, enacted August 13, 2026 (online updated September 15, 2026)) · Concord Code of Ordinances § 59-47
Corpus is an independent public-information project, not the official City of Concord website. Stable reference: corpuslaw.us/code/50f01290-f293-430e-8343-4fe8b7c9782b
Sec. 59-47. - Residential service schedule RE electric water heating and space conditioning.
(a) Availability. This rate is available only to customers dwelling in residences, condominiums, mobile homes, or individually-metered apartments which provide independent and permanent facilities for living, sleeping, eating, cooking, and sanitation. In addition, all energy required for all water heating, cooking, clothes drying, and environmental space conditioning must be supplied electrically, and all electric energy used in such dwelling must be recorded through a single meter. Power delivered under this schedule shall not be used for resale or exchange or in parallel with other electric power or as a substitute for power contracted for or which may be contracted for, under any other schedule of the city, except at the option of the city for service in conjunction with the renewable energy generation rider, or under special terms and conditions expressed in writing in the contract with the customer. (b) Type of service. (1) The city will furnish 60 Hertz service through one meter, at one delivery point, at one of the following approximate voltages, where available: Single-phase, 120/240 volts; or 3-phase, 208Y/120 volts; or other available voltages at the city's option. (2) Motors in excess of two hp, frequently started, or arranged for automatic control, must be of a type to take the minimum starting current and must be equipped with controlling devices approved by the city. (3) Three-phase service will be supplied, if available. Where 3-phase and single-phase service is supplied through the same meter, it will be billed on the rate below. Where additional service is supplied through a separate, second meter, it will be billed on the applicable non-residential rate schedule. (c) Requirements. (1) An electric water heater meeting the specifications set forth below must be installed and used to supply the entire water heating requirements, except that which may be supplied by non-fossil sources such as solar. (i) Water heaters shall be of the automatic insulated storage type, of not less than 30-gallon capacity and may be equipped with only a lower element or with a lower element and an upper element. (ii) Water heaters having only a lower element may have wattages up to but not exceeding the wattages shown below for various tank capacities. Tank Capacity in Gallons | Maximum Single Element Wattage 30—49 | 4500 50—119 | 5500 120 and larger | Approval by city (iii) The total wattage of the elements in a water heater with a lower element and an upper element may not exceed the specific wattages above unless the water heater has interlocking thermostats to prevent simultaneous operation of the two elements such that the maximum wattage is not exceeded during operation. (2) Electric space conditioning meeting the specifications set forth below must be installed and used to supply the entire space conditioning requirements, except that which may be supplied by supplemental non-fossil sources such as solar. (i) Room-type systems shall be controlled by individual room thermostats. (ii) Heat pumps shall be controlled by two-stage heating thermostats, the first stage controlling compressor operation and the second stage controlling all auxiliary electric resistance heaters. Auxiliary heaters shall be limited to 48 amps (11.5 KW at 240 volts) each and shall be switched so that the energizing of each successive heater is controlled by a separate adjustable outdoor thermostat. A manual switch for bypass of the first stage and the interlock of the second stage of the heating thermostat will be permitted. (iii) Excess heating capacity (15 percent more than total calculated heat losses) may be disconnected at the option of the company. (iv) Total heat loss shall not exceed 30 BTUH (at 60 degrees F. temperature differential) per square foot of net heated area. The city's procedure for calculating heat loss or the current edition of the ASHRAE (American Society of Heating, Refrigerating, and Air Conditioning Engineers) guide shall be the source for heat loss calculations. Duct or pipe losses shall be included in the computation of total heat losses. (3) Billing of service under this schedule will begin after the customer has notified the city that qualifications have been met. The city at all reasonable times shall have the right to periodically inspect the premises of the customer for compliance with the requirements, subsequent to the initial inspection. (d) Monthly rate. Charges will be included in customers' bills as provided by subsection 59-40(a), and may include charges for a purchase power adjustment rider (§ 59-41 et seq.), and/or a portfolio standard renewable energy rider (§ 59-42 et seq.) and/or an "extra facilities charge" rider (§ 59-43 et seq.). (e) Payment. See subsection 59-40(b).
(Ord. No. 10-01, § 1, 1-14-2010; Ord. No. 11-16, § 1, 3-10-2011)
Ask a question about Concord law
Corpus searches the Concord sections it holds and shows the ones that match, with their citations. Free, no sign-in.