§ 6-2-37 — PERMIT INSPECTIONS
Code of Ordinances, City of Greenville, North Carolina · Greenville Code of Ordinances § 6-2-37
Corpus is an independent public-information project, not the official City of Greenville website. Stable reference: corpuslaw.us/code/ad92ae2d-f201-4383-aef4-31459000d6b2
SEC. 6-2-37 PERMIT INSPECTIONS.
(A) Once the permit is duly issued, the supervisor on the driveway construction site shall keep the permit available for on-the-job inspection by authorized personnel of the city. In the event of failure to comply with the terms of the permit, faulty workmanship and/or materials, the City Engineer or his or her authorized agent shall have the right to stop the work until such time as the objectionable conditions are corrected. All cost incurred in the removal and/or correction of noncompliance with design, defective workmanship or materials shall be borne by the applicant. (B) The owner/applicant shall notify the Engineering Department after the driveway is formed for inspection. (C) All driveways are to be inspected by the City Engineer or designee prior to the placement of concrete. (Ord. No. 2371, § 1, passed 9-23-1991; Ord. No. 23-040, § 1, passed 5-11-2023)
Ask a question about Greenville law
Corpus searches the Greenville sections it holds and shows the ones that match, with their citations. Free, no sign-in.
