§ 9-4-167.1 — STORMWATER STANDARDS IN MASTER PLAN COMMUNITIES
Code of Ordinances, City of Greenville, North Carolina · Greenville Code of Ordinances § 9-4-167.1
Corpus is an independent public-information project, not the official City of Greenville website. Stable reference: corpuslaw.us/code/4fae3486-f77e-454c-9fe5-d2c47e26936d
SEC. 9-4-167.1 STORMWATER STANDARDS IN MASTER PLAN COMMUNITIES.
(A) For the purpose of this article, the following definitions shall apply unless the context clearly indicates or requires a different meaning. Built-upon area (BUA). That portion of a development project that is covered by impervious or partially impervious cover including buildings, pavement, gravel areas (e.g., roads, parking lots, paths), recreation facilities (e.g., tennis courts) and the like. (Note: wooden slatted decks and the water area of a swimming pool are considered pervious.) Impervious surfaces. Those areas within developed land that prevent or significantly impede the infiltration of stormwater into the soil. Common "impervious surfaces" include but are not limited to roof tops, sidewalks, walkways, patio areas, roads, driveways, parking lots, storage areas, brick or concrete pavers, compacted gravel surfaces (roads, driveways, parking and storage areas), and other surfaces which prevent or significantly impede the natural infiltration of stormwater into the soil. New development. The following: (1) Any activity including grubbing, stump removal and/or grading that disturbs greater than one acre of land to establish, expand or replace a single-family or duplex residential development or recreational facility. For individual single-family residential lots of record that are not part of a larger common plan of development or sale, the activity must also result in greater than 10% built-upon area. (2) Any activity including grubbing, stump removal and/or grading that disturbs greater than one-half an acre of land to establish, expand or replace a multi-family residential development or a commercial, industrial or institutional facility. Redevelopment. Any rebuilding activity other than a rebuilding activity that: (1) Results in no net increase in built-upon area; and (2) Provides equal or greater stormwater control than the previous development. (B) Attenuation requirements. (1) At a minimum, new development and redevelopment as described in this section shall not result in a net increase in peak flow leaving the site from pre-development conditions for the one-year, five-year and ten-year, 24-hour storm events. (2) New development and redevelopment, as described in this section, in areas at special risk with well documented water quantity problems as determined by the City Engineer, shall not result in a net increase in peak flow leaving the site from pre-development conditions for the 25-year, 24-hour storm event. (3) Peak flow leaving the site from pre-development conditions for the one-year, five- year, ten-year and 25-year, 24-hour storm events shall be calculated, and the plan shall be prepared and approved using the standards of the City Engineer, as set forth in the city's Manual of Standard Designs and Details and stormwater management program. (4) The drainage plan as required by this section shall include but not be limited to a site plan showing existing proposed buildings, storm drainage facilities, ground cover, site construction plans with grading plan, and drainage system; drainage facility design data including area map, engineering calculations, area of impervious cover and total land area. (5) ln the event that literal interpretation of this section creates an undue hardship, the applicant may appeal to the Board of Adjustment for a variance in whole or in part from this section. (6) No part of this section shall be applied to structures existing prior to the effective date of this section nor shall existing impervious ground cover be used in the calculation of runoff. (C) Exemptions to the attenuation requirement. Peak flow control is not required for developments that meet one or more of the following requirements: (1) The increase in peak flow between pre- and post-development conditions does not exceed 10% (note that this exemption makes it easier to conduct redevelopment activities); or (2) The development occurs in a part of a drainage basin where stormwater detention can aggravate local flooding problems as dete1mined by the city. (3) Redevelopment projects that replace or expand existing structures or improvements and that do not result in a net increase in built-upon area. (Ord. No. 20-059, § 9, passed 10-19-2020)
Ask a question about Greenville law
Corpus searches the Greenville sections it holds and shows the ones that match, with their citations. Free, no sign-in.
