§ 2.4.16 — Variance
Code of Ordinances of the City of High Point, North Carolina (Codified through Ordinance No. 8067/25-45, enacted November 17, 2025 (Supp. No. 9)) · High Point Development Ordinance § 2.4.16
Corpus is an independent public-information project, not the official City of High Point website. Stable reference: corpuslaw.us/code/fb76e41a-07d5-4b31-a66b-1d64d24d597c
2.4.16. - Variance
A. Applicability Development that would otherwise be subject to undue and unique hardship from the applications of the standards in this Ordinance may seek relief from the standards in accordance with this section. B. Variances Distinguished This section sets out the procedure and review standards for three types of variances. 1. The zoning variance procedure may be used to seek hardship relief from the dimensional standards in this Ordinance. A variance shall not be requested to: (a) Vary from density or intensity beyond that allowed in a base zoning district; (b) Permit a use not allowed in a zoning district; (c) Modify any standards in Section 5.7, Signage other than sign height or allowable sign location; or (d) Allow a prohibited use. 2. The flood damage prevention variance may be used to request relief from the standards in Section 6.4, Flood Damage Prevention, for: (a) The repair or rehabilitation of historic structures when the proposed repair or rehabilitation will not affect the structure's designation as an historic structure and the variance is the minimum necessary to preserve the historic character and design of the structure; (b) A functionally dependent facility, provided it is protected by methods that minimize flood damage during the base flood and create no additional threats to public safety; and (c) Any other type of development, provided it meets the standards of this section for a flood damage prevention variance. 3. The watershed variance may be used to request relief from the State's watershed protection standards in Section 6.2, Watershed Protection, for two types of watershed variances: (a) Major Watershed Variances A major watershed variance is a variance from the minimum State watershed protection rules that results in: (1) The relaxation of any surface water buffer width, density, built-upon area or minimum lot size requirement by a factor greater than 5 percent under the high-density option; (2) The relaxation of any surface water buffer width, density, built-upon area or minimum lot size requirement by a factor greater than 10 percent under the low-density option; (3) The permission to allow activities deemed allowable with exception in accordance with Section 6.2.9 C.5, New Development and Activities, impacting greater than one-third of an acre of a surface water buffer; or (4) Any variation in the design, maintenance or operation requirements of an approved stormwater control measure. (b) Minor Watershed Variances A minor watershed variance is a variance from the minimum State watershed protection rules that results in: (1) The relaxation of any surface water buffer width, density, built-upon area or minimum lot size requirement by a factor of up to 5 percent under the high-density option; (2) The relaxation of any surface water buffer width, density, built-upon area or minimum lot size requirement by a factor up to 10 percent under the low-density option; or (3) The permission to allow activities deemed allowable with exception in accordance with Section 6.2.9 C.5, New Development and Activities, impacting equal to or less than one-third of an acre of a surface water buffer. [image omitted; see the official code] C. Variance Procedure 1. Pre-Application Conference Applicable (see Section 2.3.2, Pre-Application Conference). 2. Application Submittal and Acceptance Applicable (see Section 2.3.4, Application Submittal and Acceptance). 3. Staff Review (a) Applicable (see Section 2.3.5, Staff Review and Action). (b) Dependent upon the type of variance, the Planning and Development Director, Engineering Services Director or TRC shall review the application, prepare a staff report, and provide a recommendation in accordance with Section 2.4.16 D, Variance Review Standards. 4. Public Notification Applicable (see Section 2.3.6, Public Notification). 5. HPC Review and Recommen- dation (a) Applicable (see Section 2.3.8, Review by P&Z or HPC). (b) If the application is for land located within a LHO district, the HPC, following a meeting, shall provide a recommendation on the application to the BOA. The BOA shall not make a decision on an application until they receive a recommendation from the HPC. 6. BOA Review and Decision (a) Applicable (see Section 2.3.9, Action by Decision-Making Body, and Section 2.3.7, Quasi-Judicial Hearing Procedures). (b) The BOA, after the conclusion of a quasi-judicial hearing, shall decide the application for a variance. (c) The decision shall be based on the competent, material, and subsequent evidence in the record, as supplemented by the arguments presented at the quasi-judicial hearing, and the standards in Section 2.4.16 D, Variance Review Standards. (d) The decision shall be one of the following: (1) Approval of the variance as proposed; (2) Approval of the variance with revisions; or (3) Denial of the variance. (e) The concurring vote of four-fifths of the BOA shall be necessary to grant a variance. (f) Each decision shall be made in writing and reflect the BOA's determination of contested facts and their application to the standards in this Ordinance. (g) The written decision shall be signed by the Chair or other duly authorized member of the BOA. (h) The decision of the BOA shall be effective upon the filing of the written decision. 7. North Carolina Environmental Management Commission (EMC) Review (a) Table 2.4.16, N.C. Environmental Management Commission (EMC) Review of Watershed Variances, shows the circumstances under which a watershed variance request must be reviewed by the EMC. TABLE 2.4.16: N.C. ENVIRONMENTAL MANAGEMENT COMMISSION (EMC) REVIEW OF WATERSHED VARIANCES A. RECOMMENDATION TO EMC | 1. Major Watershed Variance to Relax Surface Water Buffer Width, Density, BUA or Minimum Lot Size Requirements If BOA decides in favor of granting the major variance request, then the application shall be forwarded to EMC with a watershed variance report. 2. Major Watershed Variance to Allow Activities Impacting a Surface Water Buffer If BOA decides in favor of granting the major variance request, then a watershed variance report must be prepared within 60 days of receiving a complete application and forwarded to DWR. B. FINAL DECISION MADE WITHIN 60 DAYS | 1. Major Watershed Variance to Allow Activities Impacting a Surface Water Buffer A final decision must occur within 60 days following the watershed variance report being posted on the DWR website. (b) If the BOA does not recommend approval of a major watershed variance, it shall be deemed denied and shall not be forwarded to the EMC. (c) If the EMC approves the major watershed variance, then it will prepare a decision that includes any conditions or stipulations added by the EMC and authorizing the BOA to issue a final decision granting the variance. (d) If the EMC denies the major watershed variance, then it will prepare a decision authorizing the BOA to issue a final decision denying the variance. 8. Notification of Decision The decision of the BOA shall be delivered by personal service, electronic mail, or by first-class mail to the applicant, the landowner, and to any person who has submitted a written request for a copy prior to the date the decision becomes effective. The person providing notification of decision shall certify that proper notification has been made. D. Variance Review 1. Zoning Variance (a) General Requirements (1) No change in permitted uses may be authorized by a variance. (2) It is not necessary to demonstrate that, in the absence of the variance, no reasonable use can be made of the property. (3) Hardships resulting from personal circumstances, as well as hardships resulting from conditions that are common to the neighborhood or the general public, may not be the basis for granting a variance. (4) The act of purchasing property with knowledge that circumstances exist that may justify the granting of the variance is not a self-created hardship. (b) Review Standards A zoning variance shall be approved upon a showing that all of the following standards are met: (1) Unnecessary hardship would result from the strict application of the Ordinance. (2) The hardship results from conditions that are peculiar to the property, such as location, size, or topography. (3) The hardship did not result from actions taken by the applicant or the property owner. (4) The requested variance is consistent with the spirit, purpose, and intent of the Ordinance, such that public safety is secured, and substantial justice is achieved. 2. Flood Damage Prevention Variance Standards A flood damage prevention variance shall be approved upon evidence presented that demonstrates the following requirements are met and the required findings made: (a) General Requirements (1) The variance is the minimum necessary, considering the flood hazard, to afford relief. (2) Approval of the variance will not render the structure in violation of applicable federal, state, or local requirements. (3) Approval of the variance will not result in any increase in flood levels within any designated floodway or non-encroachment area during the base flood discharge. (4) The variance is issued prior to any other prerequisite permit or development approvals. (5) Consideration shall be given to all of the following factors: (i) The danger that materials may be swept onto other lands and injure others; (ii) The danger to life and land due to flooding or erosion damage; (iii) The susceptibility of the proposed facility and its contents to flood damage and the effect of such damage on the individual landowner; (iv) The importance of the services provided by the proposed facility to the community; (v) The necessity to the facility of a waterfront location as a functionally-dependent facility; (vi) The availability of alternative locations, not subject to flooding or erosion damage, for the proposed use; (vii) The compatibility of the proposed use with existing and anticipated development; (viii) The relationship of the proposed use to the City's adopted policy guidance and the City's floodplain management program; (ix) The safety of access to the use in times of flood for ordinary emergency vehicles; (x) The expected height, velocity, duration, rate of rise, and sediment transport of the floodwaters and the effects of wave action, if applicable, expected at the site; and (xi) The costs of providing governmental services during and after flood conditions including maintenance and repair of public utilities and facilities such as sewer, gas, electrical and water systems, and streets and bridges. (b) Required Findings (1) There is a good and sufficient cause to grant the variance. (2) Failure to grant the variance would result in exceptional hardship. (3) Granting the variance will not result in increased flood heights, additional threats to public safety, extraordinary public expense, create nuisance, cause fraud on or victimization of the public, or conflict with this Ordinance. 3. Watershed Variance Standards A watershed variance (major or minor) shall be approved upon evidence presented that demonstrates the following requirements are met and the required findings are made: (a) General Requirements (1) Where the watershed protection standards in this Ordinance exceed the State's minimum watershed protection standards, then a modification to the requirements may be requested in accordance with Section 6.2.16, Watershed Modifications. (2) The applicant shall demonstrate that the project meets all the following criteria: (i) The basic project purpose cannot be practically accomplished in a manner that would avoid or better minimize disturbance, preserve aquatic life and habitat, and protect water quality; (ii) The development activity cannot practically be reduced in size or density, reconfigured or redesigned to better minimize disturbance, preserve aquatic life and habitat, and protect water quality; (iii) Stormwater control measures shall be used to minimize disturbance, preserve aquatic life and habitat, protect water quality, and will function in perpetuity; (iv) For requests involving the permission to allow activities deemed allowable with exception in accordance with Section 6.2.9 C.5, New Development and Activities, it shall be necessary to demonstrate that, in the absence of the variance, the applicant can secure no reasonable return from, nor make reasonable use of their property; and (v) The variance results in the minimum possible deviation from the terms of the surface buffer requirements that shall make reasonable use of the property possible. (3) The act of purchasing property with knowledge that circumstances exist that may justify the granting of the variance shall not be regarded as a self-created hardship. (4) None of the following may be used as the basis for approving a watershed variance: (i) Neither the nonconforming use of lands, buildings, or structures in the same zoning district, nor the permitted use of lands, buildings, or structures in other zoning districts; (ii) Difficulties or hardships resulting from personal circumstances or resulting from conditions that are common to the neighborhood or the general public; (iii) Hardships resulting from factors other than application of the relevant standards of this Ordinance; (iv) That granting the variance would allow greater profit from the property; or (v) Financial hardship. (b) Required Findings (1) There are practical difficulties or unnecessary hardships that prevent compliance with the Ordinance. (2) The difficulty or hardship results from conditions that are peculiar to the physical nature of the property, such as location, size, shape, or topography. (3) The difficulty or hardship did not result from actions taken by the applicant or the property owner. (4) The variance is consistent with the spirit, purpose, and intent of the Ordinance, such that water quality is protected, public safety and welfare is secured, and substantial justice is achieved. (5) The variance will ensure equal or better protection of the waters of the State than the requirements of this Ordinance. E. Conditions of Approval In granting a variance the BOA may prescribe conditions of approval to ensure compliance with the standards of this section, and to assure that the use of the land to which the variance applies will be compatible with surrounding lands and will not alter the essential character of the neighborhood. 1. A variance granted subject to a condition of approval shall be permitted as long as there is compliance with the condition. 2. Violation of a condition of approval shall be deemed a violation of this Ordinance. 3. If a violation or invalidation of a condition of approval occurs, the Planning and Development Director may revoke the certificate of occupancy for the development subject to the variance. F. Effect 1. General Approval of a variance authorizes only the particular regulatory relief approved by the BOA. It does not exempt the applicant from the responsibility to obtain all other permits or development approvals required by this Ordinance or any other applicable laws, and does not indicate that the development for which the variance is granted should receive other permits or development approvals under this Ordinance unless the relevant and applicable portions of this Ordinance are met. 2. Notification Regarding Flood Insurance Costs (a) An applicant for whom a flood damage prevention variance is approved shall be provided written notice by the Planning and Development Director specifying the difference between the base flood elevation (BFE) and the elevation to which the structure is built. The notice shall inform the applicant about the risks to life and property from construction below the BFE and that issuance of a variance to construct a structure below the BFE will result in increased premium rates for flood insurance. (b) The notification shall be maintained by the Engineering Services Director with the record of the flood damage prevention variance action. 3. Records Upon request, the Engineering Services Director shall report all flood damage prevention variances approved in accordance with this section to the Federal Emergency Management Agency and the State of North Carolina. The Planning and Development Director shall maintain a record of all watershed variances and provide those records to the DWR upon request in accordance with Section 6.2.17, Watershed Accounting. G. Amendment Amendment of a variance may only be reviewed and considered in accordance with the procedures and standards established for its original approval. H. Expiration 1. The approval of a variance establishes a vested right in accordance with Section 1.10.1, Development Permit. 2. A variance approval shall expire and become null and void within 1 year of the issuance of the order unless development authorized by the variance has substantially commenced. I. Appeal Any decision by the BOA shall be subject to Superior Court review by proceedings in the nature of certiorari.
(Ord. No. 7415/18-44, § 1.D, 5-21-2018; Ord. No. 7476/18-105, §§ 1.C, 6, 12-3-2018; Ord. No. 7622/20-38, §§ 4.G, 9, 8-5-2020; Ord. No. 7679/20-95, § 3.B, 12-9-2020; Ord. No. 7712/21-29, § 5.L, 5-19-2021; Ord. No. 7926/23-41, § 2, 5-15-2023; Ord. No. 8052/25-30, § 3, 7-21-2025)
Ask a question about High Point law
Corpus searches the High Point sections it holds and shows the ones that match, with their citations. Free, no sign-in.