§ 7.1.5 — Permanent Runoff Control Structures/Soil Erosion and Sedimentation Control Devices
Code of Ordinances of the City of High Point, North Carolina (Codified through Ordinance No. 8067/25-45, enacted November 17, 2025 (Supp. No. 9)) · High Point Development Ordinance § 7.1.5
Corpus is an independent public-information project, not the official City of High Point website. Stable reference: corpuslaw.us/code/1b865c61-4fb8-4358-90af-964e21d068ea
7.1.5. - Permanent Runoff Control Structures/Soil Erosion and Sedimentation Control Devices
A. Soil Erosion and Sedimentation Control Devices An approved soil erosion and sedimentation control device may be installed prior to approval of street and utility construction plans in accordance with the standards in this section. B. Permanent Runoff Control Structures 1. Coordination with Streets and Utilities Street and utility construction plans shall show the location of existing or proposed runoff control structures relative to the proposed improvements to avoid conflicts during and after construction. 2. Design and Construction A runoff control structure shall be designed and installed in accordance with the requirements of Section 6.2, Watershed Protection, and this section. 3. Owners Association Required When a permanent runoff control structure serves more than 1 lot within a subdivision, an owners' association shall be required for the purposes of ownership and maintenance responsibility (see Section 7.3, Homeowners' or Property Owners' Association). 4. Maintenance Responsibility The owners association shall be responsible for maintaining the completed permanent runoff control structure(s). If the owners' association is dissolved or ceases to exist, all the owners of record at the time of required maintenance shall be jointly and severally liable for all costs related to the completed permanent runoff control structure(s). 5. Maintenance Note Required on Final Plat When a subdivision contains a permanent runoff control structure to which paragraph (3) above is applicable, the final plat shall contain a prominent note with the full text of paragraph (4) above. 6. Timing of Completion The permanent runoff control structure(s) shall be substantially completed and have full design volume available prior to the recordation of a final plat for the subdivision. This may require the cleanout and disposal of sediment from a pond.
Ask a question about High Point law
Corpus searches the High Point sections it holds and shows the ones that match, with their citations. Free, no sign-in.
