For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 22-8 — Design and performance standards

Code of Ordinances of the City of Jacksonville, North Carolina (Codified through Ordinance No. 2025-52, adopted November 18, 2025 (Supp. No. 63)) · Jacksonville Code of Ordinances § 22-8

Corpus is an independent public-information project, not the official City of Jacksonville website. Stable reference: corpuslaw.us/code/3c25f846-6049-49c5-9932-597108de5f46

Sec. 22-8. - Design and performance standards.

(a) Except as provided in section 22-8(b)(2) and section 22-8(c)(1) of this chapter, erosion and sedimentation control measures, structures, and devices shall be planned, designed, and constructed to provide protection from the calculated maximum peak rate of runoff from the ten-year storm. Runoff rates shall be calculated using the procedures in the latest edition of the USDA, Natural Resources Conservation Service's "National Engineering Field Handbook", or other acceptable calculation procedures. (b) HQW Zones. In high quality water (HQW) zones the following design standards shall apply: (1) Limit on uncovered area. Uncovered areas in HQW zones shall be limited at any time to a maximum total area of twenty acres within the boundaries of the tract. Only the portion of the land-disturbing activity within a HQW zone shall be governed by this section. Larger areas may be uncovered within the boundaries of the tract with the written approval of the director upon providing engineering justification with a construction sequence that considers phasing, limiting exposure, weekly submitted self-inspection reports, and a more conservative design than the twenty-five-year storm. (2) Maximum peak rate of runoff protection. Erosion and sedimentation control measures, structures, and devices within HQW zones shall be planned, designed and constructed to provide protection from the runoff of the twenty-five-year storm which produces the maximum peak rate of runoff as calculated according to procedures in the latest edition of the United States Department of Agriculture Natural Resources Conservation Service's "National Engineering Field Handbook" or according to procedures adopted by any other agency of this state or the United States or any generally recognized organization or association. (3) Sediment basin design. Sediment basins within HQW zones shall be designed and constructed according to the following criteria: a. Use a surface withdrawal mechanism, except when the basin drainage area is less than one (1) acre; b. Have a minimum of one thousand eight hundred (1,800) cubic feet of storage area per acre of disturbed area; c. Have a minimum surface area of three hundred twenty-five (325) square feet per cfs of the twenty-five-year storm (Q25) peak flow; d. Have a minimum dewatering time of forty-eight (48) hours; e. Incorporate three (3) baffles, unless the basin is less than twenty (20) feet in length, in which case two (2) baffles shall be sufficient. Upon a written request of the applicant, the director may allow alternative design and control measures in lieu of meeting the conditions required in subparagraphs (3)(b) through (3)(e) of this sub-section if the applicant demonstrates that meeting all of those conditions will result in design or operational hardships and that the alternative measures will provide an equal or more effective level of erosion and sediment control on the site. Alternative measures may include quicker application of ground cover, use of sediment flocculants, and use of enhanced ground cover practices. (4) Grade. Newly constructed open channels in HQW zones shall be designed and constructed with side slopes no steeper than two (2) horizontal to one (1) vertical if a vegetative cover is used for stabilization unless soil conditions permit a steeper slope or where the slopes are stabilized by using mechanical devices, structural devices or other forms of ditch liners proven as being effective in restraining accelerated erosion. In any event, the angle for side slopes shall be sufficient to restrain accelerated erosion. (c) Design standards for The Upper Neuse River Basin (Falls Lake Watershed). In addition to any other requirements of state, federal, and local law, land-disturbing activity in the watershed of the drinking water supply reservoir that meets the applicability requirements of Session Law 2009-486, section 3(a), shall meet all of the following design standards for sedimentation and erosion control. (1) Erosion and sedimentation control measures, structures, and devices shall be planned, designed, and constructed to provide protection from the runoff of the twenty-five-year storm that produces the maximum peak rate of runoff as calculated according to procedures set out in the latest edition of the United States Department of Agriculture Natural Resources Conservation Service's "Engineering Field Handbook" found through nrcs.usda.gov or according to procedures adopted by any other agency of the state or the United States. (2) Sediment basins shall be planned, designed, and constructed so that the basin will have a settling efficiency of at least seventy (70) per cent for the 40-micron size soil particle transported into the basin by the runoff of the two-year storm that produces the maximum peak rate of runoff as calculated according to procedures in the latest edition of the United States Department of Agriculture Natural Resources Conservation Service's "National Engineering Field Handbook" or according to procedures adopted by any other agency of the state or the United States. (3) Newly constructed open channels shall be planned, designed, and constructed with side slopes no steeper than two (2) horizontal to one (1) vertical if a vegetative cover is used for stabilization unless soil conditions permit steeper side slopes or where the side slopes are stabilized by using mechanical devices, structural devices, or other ditch liners sufficient to restrain accelerated erosion. The angle for side slopes shall be sufficient to restrain accelerated erosion, as determined by the approving authority, based on soil conditions. (4) For an area of land-disturbing activity where grading activities have been completed, temporary or permanent ground cover sufficient to restrain erosion shall be provided as soon as practicable, but in no case later than seven (7) calendar days after completion of grading. For an area of land-disturbing activity where grading activities have not been completed, temporary ground cover shall be provided as follows: a. For an area with no slope, temporary ground cover shall be provided for the area if it has not been disturbed for a period of fourteen (14) calendar days. b. For an area of moderate slope, temporary ground cover shall be provided for the area if it has not been disturbed for a period of ten (10) calendar days. For purposes of this section, "moderate slope" means an inclined area, the inclination of which is less than or equal to three (3) units of horizontal distance to one (1) unit of vertical distance. c. For an area of steep slope, temporary ground cover shall be provided for the area if it has not been disturbed for a period of seven (7) calendar days. For purposes of this item, "steep slope" means an inclined area, the inclination of which is greater than three (3) units of horizontal distance to one (1) unit of vertical distance.

(Ord. No. 04-22, 5-4-04; Ord. No. 2021-19, § 8, 4-20-21)

Ask a question about Jacksonville law

Corpus searches the Jacksonville sections it holds and shows the ones that match, with their citations. Free, no sign-in.