Sec. 26-43. - Construction.

Upon approval of any application for water and/or sewer connection(s), the city may elect to have their own forces make the connection to city-owned mains. The city shall do the excavation, make the proper connection, install a water meter where necessary, fill the excavation with compacted select fill and replace the surface of the street or shall approve and directly supervise such construction by a utility contractor other than the city. Contractor shall be responsible for returning the area to its original condition including yard restoration, repaving of the street and any other disturbance created by the work. The cost of work will be the responsibility of the applicant. The city may decline to have their own forces make a service connection if one (1) of the following conditions exists: (1) The depth of the water/sewer main is such that city forces cannot safely make the tap per "Occupational Safety and Health Standards (OSHA) for the Construction Industry; CFR Part 1926.650 Subpart P - Excavations." (2) The workload of the city forces is such that they cannot make the connection in a timely manner (seven (7) to ten (10) working days after "installation payment" is made). (3) The location of the connection(s) to be made cannot be accessed by city forces.

(Code 1968, § 24-7; Ord. No. 03-36, 7-8-03)