§ 21-33.2 — Industrial permits
Code of Ordinances of the City of Rocky Mount, North Carolina (Codified through Ordinance No. O-2025-71, enacted November 10, 2025. (Supp. No. 90)) · Rocky Mount City Code § 21-33.2
Corpus is an independent public-information project, not the official City of Rocky Mount website. Stable reference: corpuslaw.us/code/7daeb2d8-3879-4927-8a3e-826a4cb58173
Sec. 21-33.2. - Industrial permits.
All significant industrial users shall obtain a significant industrial user permit prior to the commencement of discharge to the POTW. Existing industrial users who are determined by the director of water resources to be significant industrial users shall obtain a significant industrial user permit within one hundred eighty (180) days of receiving notification of the director of water resources' determination. Industrial users who do not fit the significant industrial user criteria may at the discretion of the director of water resources be required to obtain a wastewater discharge permit for non-significant industrial users. (1) Significant industrial user determination. All industrial users proposing to discharge non-domestic wastewater, or proposing to change the volume or characteristics of an existing discharge of non-domestic wastewater shall request from the director of water resources a significant industrial user determination. If the director of water resources determines or suspects that the proposed discharge fits the significant industrial user criteria he will require that a significant industrial user permit application be filed. (2) Significant industrial user permit application. Users required to obtain a significant industrial user permit shall complete and file with the city, an application in the form prescribed by the director of water resources, and accompanied by an application fee in the amount prescribed in the schedule of charges and fees. Significant industrial users shall apply for a significant industrial user permit within ninety (90) days after notification of the director of water resources' determination in section 21-33.2(1). The application shall include at a minimum the information required by 15A NCAC 02H 0.0916 (c)(1)(A—M). In support of the application, the user shall submit, any other information deemed necessary by the director of water resources to evaluate the permit application. This may include reporting requirements under 40 CFR 403.12 (b) and section 21-36. The application shall include at a minimum: a. Name of industrial user; b. Address of industrial user; c. Standard industrial classification (SIC) code(s) or expected classification and industrial user category; d. Wastewater flow; e. Types and concentrations (or mass) of pollutants contained in the discharge; f. Major products manufactured or services supplied; g. Description of existing on-site pretreatment facilities and practices; h. Locations of discharge points; i. Raw materials used or stored at the site; j. Flow diagram or sewer map for the industrial user; k. Number of employees; l. Operation and production schedules; and m. Description of current and projected waste reduction activities in accordance with G.S. 143-215.1(g); (3) Application signatories and certification. All wastewater discharge permit applications and user reports must be signed by the current authorized representative of the user on file with the director of water resources or duly authorized representative for the city, as defined in subsection 21-27(1) authorized representative and contain the following certification statement: "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." (4) Application review and evaluation. The director of water resources will evaluate the data furnished by the user and may require additional information. a. The director of water resources is authorized to accept applications for the city and shall refer all applications to the POTW staff for review and evaluation. b. Within thirty (30) days of receipt the director of water resources shall acknowledge and accept the complete application; or if not complete, shall return the application to the applicant with a statement of what additional information is required. (5) Tentative determination and draft permit. a. The POTW staff shall conduct a review of the application and an on-site inspection of the significant industrial user, including any pretreatment facilities, and shall prepare a written evaluation and tentative determination to issue or deny the significant industrial user permit. b. If the staff's tentative determination in subsection a. is to issue the permit, the following additional determination shall be made in writing: 1. Proposed discharge limitations for those pollutants proposed to be limited; 2. A proposed schedule of compliance, including interim dates and requirements, for meeting the proposed limitations; and 3. A brief description of any other proposed special conditions that will have significant impact upon the discharge described in the application. c. The staff shall organize the determinations made pursuant to subsections a. and b. and the city's general permit conditions into a significant industrial user permit. (6) Permit supporting documentation. City staff shall prepare the following documents for all significant industrial user permits. (1) An allocation table (AT) listing permit information for all significant industrial users, including but not limited to permit limits, permit effective and expiration dates, and a comparison of total permitted flows and loads with division approved maximum allowable loadings of the POTW, including flow, on forms or in a format approved by the division. The AT shall be updated as permits are issued or renewed, and as permits are modified where the permitted limits or other AT information is revised. (2) The basis, or rationale, for the pretreatment limitations, including the following: (A) Documentation of categorical determination, including documentation of any calculations used in applying categorical pretreatment standards; and (B) Documentation of the rationale of any parameters for which monitoring has been waived under 40 CFR Part 403.12(e)(2). (7) Final action on significant industrial user applications. a. The director of water resources shall take final action on all applications not later than ninety (90) days following receipt of a complete application. b. The director of water resources is authorized to: 1. Issue a significant industrial user permit containing such conditions as are necessary to effectuate the purposes of this section and G.S. 143-215.1; 2. Issue a significant industrial user permit containing time schedules for achieving compliance with applicable pretreatment standards and requirements; 3. Modify any permit upon not less than sixty (60) days notice and pursuant to subsection 21-33.2(8); 4. Revoke any permit pursuant to section 21-40.2; 5. Suspend a permit pursuant to section 21-40.2; 6. Deny a permit application when in the opinion of the director of water resources such discharge may cause or contribute to pass through or interference of the wastewater treatment plant or where necessary to effectuate the purposes of G.S. 143-215.1. (8) Permit modification. a. Modification of permits shall be subject to the same procedural requirements as the issuance of permits except as listed below. Any changes or new conditions in the permit shall include a reasonable time schedule for compliance. 1. Changes in the ownership of the discharge when no other change in the permit is indicated; 2. A single modification of any compliance schedule not in excess of four (4) months; 3. Modification of compliance schedules (construction schedules) in permits for new sources where the new source will not begin to discharge until control facilities are operational. b. Within nine (9) months of the promulgation of a federal categorical pretreatment standard, the wastewater discharge permit of users subject to such standards shall be revised to require compliance with such standard within the time frame prescribed by such standard. Where a user, subject to federal categorical pretreatment standard, has not previously submitted an application for a wastewater discharge permit as required by subsection 21-33.2(2), the user shall apply for a wastewater discharge permit within one hundred eighty (180) days after the promulgation of the applicable federal categorical pretreatment standard. c. A request for a modification by the permittee shall constitute a waiver of the 60-day notice required by G.S. 143-215.1(b) for modifications. (9) Permit conditions. a. The director of water resources shall have the authority to grant a permit with such conditions attached as he believes necessary to achieve the purpose of this section and G.S. 143-215.1. Wastewater permits shall contain, but are not limited to, the following: 1. A statement of duration; 2. A statement of non-transferability; 3. Applicable effluent limits based on categorical standards or local limits or both; 4. Applicable monitoring, sampling, reporting, notification, and record keeping requirements. These requirements shall include an identification of pollutants to be monitored, sampling location, sampling frequency, and sample type based on federal, state, and local law; 5. Requirements for notifying the POTW in the event of an accidental discharge and/or slug load as defined in subsection 21-27(1); 6. Requirements to implement a plan or other controls for prevention of accidental discharges and/or slug loads as defined in subsection 21-27(1) if determined by the director of water resources to be necessary for the users and 7. Requirements for immediately notifying the POTW of any changes at its facility affecting the potential for spills and other accidental discharges, or slug load as defined in subsection 21-27(1). Also see sections 21-36.5 and 21-36.6 8. A statement of applicable civil and/or criminal penalties for violation of pretreatment standards and requirements and any applicable compliance schedule. b. In addition, permits may contain, but are not limited to, the following: 1. Limits on the average and/or maximum rate of discharge, and/or requirements for flow regulation and equalization. 2. Limits on the instantaneous, daily and/or monthly average and/or maximum concentration, mass, or other measure of identified wastewater pollutants or properties. 3. Requirements for the installation of pretreatment technology or construction of appropriate containment devices, etc., designed to reduce, eliminate, or prevent the introduction of pollutants into the treatment works. 4. Development and implementation of waste minimization plans to reduce the amount of pollutants discharged to the municipal wastewater system. 5. The unit charge or schedule of user charges and fees for the management of the wastewater discharged to the system. 6. Requirements for installation and maintenance of inspection and sampling facilities and equipment. 7. Specifications for monitoring programs that may include sampling locations, frequency of sampling, number, types, and standards for tests, and reporting schedules. 8. Requirements for immediate reporting of any instance of noncompliance and for automatic resampling and reporting within thirty (30) days where self-monitoring indicates a violation(s). 9. Compliance schedules for meeting pretreatment standards and requirements. 10. Requirements for submission of periodic self-monitoring or special notification reports. 11. Requirements for maintaining and retaining plans and records relating to wastewater discharges as specified in section 21-35.3 and affording the director of water resources, or his representatives, access thereto. 12. Requirements for prior notification and approval by the director of water resources of any new introduction of wastewater pollutants or of any significant change in the volume or character of the wastewater prior to introduction in the system. 13. Requirements for the prior notification and approval by the director of water resources of any change in the manufacturing and/or pretreatment process used by the permittee. 14. A statement that compliance with the permit does not relieve the permittee of responsibility for compliance with all applicable federal and state pretreatment standards, including those becoming effective during the terms of the permit. 15. Other conditions as deemed appropriate by the director of water resources to ensure compliance with this section, and state and federal laws, rules, and regulations. (10) Permits duration. Permits shall be issued for a specified time period, not to exceed five (5) years. A permit may be issued for a period less than a year or may be stated to expire on a specific date. (11) Permit transfer. Wastewater permits are issued to a specific user for a specific operation. A wastewater discharge permit shall not be reassigned or transferred or sold to a new owner, new user, different premises, or a new or changed operation. (12) Permit reissuance. A significant industrial user shall apply for permit re-issuance by submitting a complete permit application in accordance with section 21-33.2 a minimum of one hundred eighty (180) days prior to the expiration of the existing permit.
(Ord. No. O-2013-71, § 1(Exh. A), 6-24-13)
Ask a question about Rocky Mount law
Corpus searches the Rocky Mount sections it holds and shows the ones that match, with their citations. Free, no sign-in.
