Sec. 804. - Design, construction and maintenance of stormwater management and/or BMP facilities.
A. Stormwater management facility design. 1. All stormwater management and/or best management practices (BMP) facilities shall be designed by a North Carolina registered professional with qualifications appropriate for the type of system required; these registered professionals are defined as professional engineers, landscape architects, to the extent that N.C.G.S. ch. 89A allows, and land surveyors, to the extent that the design represents incidental drainage within a subdivision, as provided in N.C.G.S. § 89C-3(7). 2. The standards used for the design and construction of all stormwater management and/or BMP facilities shall be in accordance with the "City of Rocky Mount Standard Specifications and Design Manual," latest edition, current state minimum design criteria and "North Carolina Department of Environmental Quality Stormwater Best Management Practices Manual." These standards and all amendments thereto and are hereby adopted by reference. 3. Stormwater management facilities for nutrient reduction and water quality, may consist of one (1) treatment option or a combination of treatment options so long as the following conditions are met: a. Facility shall be designed in accordance with the provisions of subsection 804.A.1—2 and to meet the nutrient reduction requirements of section 802; and b. The annual runoff volume after development shall not be more than ten (10) percent higher than the annual runoff volume before development. 4. In addition to any required vegetative filters all land areas outside of the stormwater management facility shall be provided with a ground cover sufficient to restrain erosion within thirty (30) days after any land disturbance. Upon completion of the stormwater control structure, a permanent ground cover shall be established and maintained as part of a maintenance agreement. 5. A legal description of the area containing the stormwater control structure shall be prepared and included in a separate deed to the owning entity to be filed with the register of deeds in the appropriate county along with any easements necessary for general access to the stormwater management structure. The deeded area shall include the stormwater management structure, vegetative filters, all pipes and water control structures, berms, dikes, etc., and sufficient area to perform inspections, maintenance, repairs and reconstruction. 6. Qualifying areas of the stormwater management structure may be considered pervious when computing total built-upon area. However, if the structure is used to compute the percentage built-upon area for one (1) site, it shall not be used to compute the built-upon area for any other site or area. 7. Prior to the conveyance or transfer of any lot the built-upon area on that lot shall be referenced on the final plat and shall be recorded with the county register of deeds as the built-upon area limitation. The built-upon area limitation shall be binding on all subsequent owners of the site and portions of the site. B. Construction plan approval. If stormwater measures are required as described in this LDC, construction plan approval is required before any land-disturbing activity can begin. C. Posting of financial security required. 1. Plan approval for new stormwater control structures shall be conditioned on the posting of a financial assurance as provided in section 1310 of this LDC for one hundred ten (110) percent of the estimated construction cost for the purpose of construction, repair, or reconstruction necessary for adequate performance of the stormwater management and/or BMP facility. 2. Default under the financial assurance. Upon default of the applicant to complete and/or maintain the stormwater control structure as spelled out in the performance bond or other security, the director of public works may obtain and use all or any portion of the funds necessary to complete the improvements based on an engineering estimate. The director of public works shall return any funds not spent in completing the improvements to the owning entity; provided, however, no funds shall be returned to the owning entity until the director of public works is satisfied that adequate provisions have been made for the future maintenance, repair, and if necessary, reconstruction of the stormwater controls. 3. Default under cash security. Upon default of the owning entity to maintain, repair and, if necessary, reconstruct the stormwater control structure in accordance with the operation and maintenance agreement, the director of public works shall obtain and use all or any portion of the cash security to make necessary improvements based on an engineering estimate. Such expenditure of funds shall only be made after exhausting all other reasonable remedies seeking the owning entity to comply with the terms and conditions of the operation and maintenance agreement. The director of public works shall not return any of the deposited cash funds. D. Authority to enter. The city shall have the power to conduct such investigation as it may reasonably deem necessary to carry out its duties as prescribed in this section, and for this purpose to enter at reasonable times upon any property, public or private, for the purpose of investigating and inspecting the development or stormwater management and/or BMP facilities installed pursuant to this LDC. No person shall obstruct, delay, hamper, or in any way interfere with a city agent or official while in the process of carrying out their duties under this LDC. E. Maintenance and upkeep. 1. All stormwater management facilities and/or best management practice (BMPs) facilities that are constructed or implemented to meet the requirements of this LDC must be maintained in a manner that maintains the nutrient reduction levels and flow attenuation levels anticipated in the design of the facility. 2. Prior to final plat approval or issuance of a certificate of compliance, the applicant shall enter into a binding operation and maintenance agreement between the city and all interests in the development. Such agreement shall: a. Require the owning entity to maintain, repair and, if necessary, reconstruct the stormwater control structure in accordance with the operation and management plan provided by the developer. b. The operation and maintenance of agreement shall be in recordable form executed by the owning entity and director of public works and shall be filed with the register of deeds in the appropriate county. c. The owning entity or entities will be responsible for submitting an annual inspection report of the stormwater management and/or BMP facility performed by a knowledgeable professional in the field to the director of public works. The annual report shall include an assessment of the condition of the facility including any improvements needed to insure that the facility operates safely and achieves the necessary nutrient reduction and flow attenuation levels anticipated in the design of the facility. d. The stormwater management agreement shall clearly delineate the penalties for failure to complete the required inspections, maintenance or improvements and shall grant the city authority to enter the property for the purposes of ensuring compliance with the provisions of the agreement and this LDC. If the owner and/or operator fails to complete the required inspections or any required improvements, the city shall inspect the facilities and make any necessary corrections. Any costs associated with this work, including administrative costs and fines, will be charged to the owner and/or party legally responsible for maintenance of the facility. e. Maintenance agreements shall run with the land and be binding upon subsequent owners of both the development project and/or any offsite facilities. 3. As part of the operation and maintenance agreement, an operation and maintenance plan shall be provided by the developer for each stormwater control structure indicating what operation and maintenance actions are needed, what specific quantitative criteria will be used for determining when those actions are to be taken and, consistent with the operation and maintenance agreement, who is responsible for those actions. The plan shall clearly indicate the steps that will be taken for restoring a stormwater control structure to design specifications if a failure occurs. 4. Landscaping and grounds management shall be the responsibility of the owning entity. However, vegetation shall not be established or allowed to mature to the extent that the integrity of the control structure is diminished or threatened, or to the extent of interfering with an easement or access to the stormwater control structure. 5. Except for general landscaping and grounds management, the owning entity shall notify the director of public works prior to any repair or reconstruction of the stormwater control structure. All improvements shall be made consistent with the approved plans and specifications of the stormwater control structure and the operation and maintenance plan. After notification by the owning entity, the director of public works or designee shall inspect the completed improvements and shall inform the owning entity of any required additions, changes, or modifications and of the time period to complete such improvements. The director of public works may consult with an engineer or landscape architect (to the extent that N.C.G.S. ch. 89A allow) designated by the planning board. 6. Amendments to the plans and specifications of the stormwater management and/or BMP facility, the operation and maintenance agreement or the operation and maintenance plan shall be approved by the planning board. Proposed changes shall be prepared by a North Carolina registered professional engineer or landscape architect (to the extent that the N.C.G.S. ch. 89A allow) and submitted to and review by the department of development services prior to consideration by the planning board. a. If the planning board approves the proposed change, the owning entity of the stormwater control structure shall file sealed copies of the revisions with the department of development services. b. If the planning board disapproves the changes, the proposal may be revised and resubmitted to the board as a new proposal. If the proposal has not been revised and is essentially the same as that already reviewed, it shall be returned to the owning entity. 7. If the planning board finds that the operation and maintenance plan is inadequate for any reason, the board shall notify the owning entity of any required changes and the owning entity shall prepare and file copies of a revised operation and maintenance agreement with the department of development services and such revised plan shall be the plan for the development. F. Release of the performance bond. 1. The director of public works shall inspect the stormwater management and/or BMP facility after the developer notifies him that all work has been completed. At or prior to this inspection, the developer shall provide to the city: a. Certified as-built drawings of the stormwater management and/or BMP facility. b. Final plat(s) creating a separate lot of record for the stormwater management facility ready for filing with the register of deeds; c. Signed deed(s) and related easements, as required, to convey the stormwater controls to the owning entity; and d. A certification sealed by an engineer or landscape architect (to the extent that the N.C.G.S. ch. 89A allow) stating that the stormwater management and/or BMP facility is complete and consistent with the approved plans and specifications. 2. If the director of public works approves the inspection report and accepts the items listed in subsection 804.D.1, the director may release up to seventy-five (75) percent of the value of the performance bond or other security, and authorize the issuance of a certificate of compliance for the stormwater management and/or BMP facility. If deficiencies are found, the director of public works shall direct that improvements and inspections be made and/or documents corrected. 3. No sooner than one (1) year after year after the filing date of the deed, easements, and maintenance agreement issuance of the certificate of compliance, the developer may request that the director of public works release the remaining value of the performance bond or other security. Upon receipt of such request the director of public works shall inspect the stormwater control structure to determine whether the controls are performing as designed and intended. a. If the director of public works approves the report and accepts the request, the director of public works shall release the remaining performance bond or other security. b. If the director of public works does not accept the report and rejects the request, he shall provide the developer with instructions to correct any deficiencies and all steps necessary for the release of the performance bond or other security. 4. In the event the director of public works discovers the need for corrective action or improvements, he shall notify the owning entity of the needed improvements and the date by which the corrective action is to be completed. All improvements shall be made consistent with the plans and specifications of the stormwater control structure and the operation and maintenance plan. After notification by the owning entity, the director of public works shall inspect and approve the completed improvements. G. Variances. Pursuant to N.C.G.S. § 160D-406 and as described in section 509, the board of adjustment as established by the city shall hear and decide requests for variances from the requirements of this LDC. When practical difficulties or unnecessary hardships would result from carrying out the strict letter of this chapter, the board of adjustment may vary or modify any provision of this LDC so that the spirit of the chapter shall be observed; public safety and welfare secured; substantial justice done; and the project will provide equal or better protection of waters of the state than the requirements of 51A NCAC 02B.0711.
(Ord. No. O-2004-65, § 2, 8-9-04; Ord. No. 0-06-68, § 2, 7-10-06; Ord. No. O-2018-78, § 2, 8-13-18; Ord. No. O-2021-2, § 4, 1-11-21; Ord. No. O-22-48, § 6, 7-11-22)