§ 32-9 — Meters; used for measuring service, testing

Code of Ordinances of the Town of Wake Forest, North Carolina (Recodification codified through Ordinance No. 2024-25, adopted August 20, 2024) · Wake Forest Code of Ordinances § 32-9

Corpus is an independent public-information project, not the official City of Wake Forest website. Stable reference: corpuslaw.us/code/34849c48-b4a0-47d0-b91a-b767a38e4de6

Sec. 32-9. - Meters; used for measuring service, testing.

The electric service rendered shall be measured by an integrating watt-hour meter or such other meter as may be necessary, the registration of which shall be prima facie evidence of the electric energy received, subject in all cases to verification by testing in case of dispute. Testing, when necessary, will be done by the town at such costs as may be established by the fee schedule, from time to time. If the customer requests a test within six months after the date of the installation or of the last previous test, the cost of the test shall be borne by the customer, unless the meter shall be shown to be more than two percent fast, in which case the cost shall be borne by the town.

(Code 2000, § 32-9; Ord. No. 2023-14, att., 5-16-2023)

Ask a question about Wake Forest law

Corpus searches the Wake Forest sections it holds and shows the ones that match, with their citations. Free, no sign-in.