§ 11-97 — Special provisions for newly constructed or reconstructed or resurfaced streets

Code of Ordinances of the City of Wilmington, North Carolina (Supp. No. 43, Update 1: codified through Ordinance No. O-2026-51, enacted October 20, 2026) · Wilmington Code of Ordinances § 11-97

Corpus is an independent public-information project, not the official City of Wilmington website. Stable reference: corpuslaw.us/code/ec25c5da-e313-4731-8779-298a93b29180

Sec. 11-97. - Special provisions for newly constructed or reconstructed or resurfaced streets.

(a) Except as provided in subsection (b) below, no permit shall be issued for an excavation or utility work in any public way that has been constructed, reconstructed, repaved, or resurfaced in the preceding period of thirty-six (36) months, as measured from the date of acceptance by the city. Persons shall determine alternative methods of making necessary repairs and facility installations to avoid utility work and excavations that are subject to this section. (b) The city engineer, for good cause, shall grant a variance to an applicant for repair of existing utilities, to respond to emergencies, to comply with applicable state or federal regulations, or to afford a person the means to provide service to buildings that the person has no other reasonable means of serving in the determination of the city engineer. Variances shall be granted subject to special conditions that the city engineer determines to be appropriate to the circumstances, such as special coordination with other excavations and utility work, special paving requirements as referenced in section 11-96(b), additional soil compaction test reports, or any other requirements needed to restore the integrity of the public right-of-way to "as new" condition. In addition to the information provided on the submission of plans and/or application, the applicant shall provide the following with respect to that part of the public right-of-way subject to this provision: (1) Reason why the excavation or utility work was not performed before or when the public right-of-way was paved; (2) Reason why the excavation or utility work cannot be delayed until after the thirty-six-month period expires; and (3) Reason why the excavation or utility work cannot be performed at reasonable cost at another location or the applicant's need cannot be accomplished by a method that does not require excavation or work in the public right-of-way.

(Ord. No. O-2009-8, § 2, 2-3-09)