For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 37-0306 — Permit modification

Fargo Municipal Code, Fargo, North Dakota (Supp. No. 14, Update 5: codified through Ordinance No. 5555, adopted August 17, 2026) · Fargo Municipal Code § 37-0306

Corpus is an independent public-information project, not the official City of Fargo website. Stable reference: corpuslaw.us/code/b8da05ad-4e9c-405b-bddf-7aff1fecbcab

37-0306. - Permit modification.

The city engineer is authorized to modify erosion and sediment control permits for cause. The city engineer shall provide written notice of the modification to the permit, and state the cause therefore, at least thirty days before the modified permit is to take effect. Written notice shall be deemed to be delivered upon mailing the notice to the address of the applicant and the owner as provided in the application or such other address as the applicant or owner may provide to the city engineer in writing. Cause for modifying the permit shall include but not be limited to: 1. Promulgation of new federal, state or local regulatory requirements; 2. Changes in the requirements of this chapter; 3. Changes in the process used by the permittee or changes in discharge rate, volume, or character; and 4. Changes in the design or capability of receiving storm water systems. The city engineer shall include within the modified permit a reasonable time schedule for compliance with the altered or added requirements in the modified permit.

Source: 4510 (2006).

Ask a question about Fargo law

Corpus searches the Fargo sections it holds and shows the ones that match, with their citations. Free, no sign-in.