For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 14.70.015 — Permit Conditions

Lincoln, Nebraska Municipal Code (enCodePlus online edition as published 2026-11-08 (history notes seen through Ord. 21775, Sept. 15, 2025)) · Lincoln Municipal Code § 14.70.015

Corpus is an independent public-information project, not the official City of Lincoln website. Stable reference: corpuslaw.us/code/cf193ad5-4ffd-4545-bb0e-a3c49184572f

14.70.015 Permit Conditions.

In addition to the requirements of the One-Call Notification System Act, all permits granted pursuant to this chapter shall be subject to the following conditions: (a) The permittee shall mark the proposed pathway of the excavation with stakes, flags, posts or white painted or chalked lines that are clearly visible prior to calling the statewide one-call notification center. Such marking requirement is not feasible and will not be required for: (1) New subdivisions; (2) Street widening projects; or (3) Where only a single address is the subject of the permit. In all other examples where a permittee believes that such marking is not feasible, the permittee shall make a request for waiver of this requirement to the Director of Transportation and Utilities prior to calling the statewide one-call notification center; (b) The permittee shall not commence any excavation without first giving notice as required by the One-Call Notification System Act; (c) After the initial marking of the underground facility by the facility operators, if such excavation has not been completed within five business days from the date specified to start excavation, then the permittee may request additional location markings. Whenever a second remarking and any remarkings thereafter are done by the City and the excavation has not yet been initiated, the City may charge the permittee for the cost of such remarkings; and (d) Whenever underground facilities are in close proximity to the proposed pathway location or whenever the vertical location of the underground facility is unknown, the permittee shall use special measures to determine the locations of such underground facilities. (1) If the permittee is conducting the excavation by digging from the surface, when in close proximity to the underground facilities, the permittee shall use hand digging, hydroexcavating, air excavating, or any other techniques that are approved by the Director of Transportation and Utilities to locate such facility. (2) If the permittee is conducting the excavation by tunneling or boring, the permittee shall determine the vertical location of the underground facility by potholing or any other method approved by the Director of Transportation and Utilities. ( Ord. 18926 §2; June 6, 2007).

(Ord. 20747 §91; February 25, 2019)

Ask a question about Lincoln law

Corpus searches the Lincoln sections it holds and shows the ones that match, with their citations. Free, no sign-in.