§ 17.58.130 — Permit Required
Lincoln, Nebraska Municipal Code (enCodePlus online edition as published 2026-11-08 (history notes seen through Ord. 21775, Sept. 15, 2025)) · Lincoln Municipal Code § 17.58.130
Corpus is an independent public-information project, not the official City of Lincoln website. Stable reference: corpuslaw.us/code/f7790589-1b77-461b-b5c0-8e216f22f1d6
17.58.130 Permit Required.
(a) General requirements. No person shall discharge or cause to be discharged to any public wastewater collector any industrial wastes or such wastes as described in Section 17.58.060 of this chapter, without a valid permit from the Director. When the Director has reason to believe that an owner of property has been discharging, is discharging, or is about to discharge any industrial wastes into a public wastewater collector, he may request such person to file an application for such a permit, which application shall be completed and returned to the Director within thirty days after the receipt thereof. (b) Application information. All applications for a permit under this section shall require the applicant to provide the following information as a minimum: (1) Name, address, and telephone number of applicant; (2) Title of authorized representative; (3) The location and legal description of the property to be covered by the permit; (4) A general statement of the type of operations conducted and to be conducted on the property; (5) A site plan of the property showing accurately all wastewater collectors, storm drains, property lines, wastewater services, and other utilities; (6) Plans, specifications, and any other pertinent information relating to proposed pretreatment facilities or covering any work proposed to be performed under the permit. Such information shall be prepared by a professional engineer registered in Nebraska. (7) A complete schedule of all process waters and industrial wastes produced or expected to be produced for discharge from the property, including a description of the character of each waste, the daily volume of discharge, the times and rates of maximum discharges, and representative laboratory analyses; the latter of which shall be performed by an independent testing laboratory unless expressly waived by the Director. (8) Name, address, and telephone number of the person who will actually perform the work covered by the permit. (c) Permit terms. (1) If, after examination by the Director of the information contained in an application for a permit hereunder, it is determined by the Director that the characteristics of the proposed discharge do not conflict with the provisions of this chapter, a permit shall forthwith be issued allowing the discharge of such wastes to the public wastewater collectors. But, if it is determined by the Director that the characteristics of the wastes are not in compliance with the provisions of this chapter, the application shall be denied by the Director and the applicant forthwith advised by the Director of steps which must be taken to ensure compliance with the provisions of this chapter. (2) All wastewater discharge permits or special agreements shall be expressly subject to all provisions of this chapter and rates and charges established by the city. Permits shall be granted for a period of time not to exceed five years and shall be renewed thereafter. The Director shall establish an expiration date, which shall be stated in the permit. The permittee shall file with the Director an application for renewal of the permit at least ninety days prior to the expiration of the existing permit. The information required for renewal of the permit shall consist of an updating of all information previously submitted under the existing permit. (d) Permit conditions. Wastewater discharge permits may contain any or all of the following conditions, as determined by the Director: (1) For discharges which will require pretreatment to meet the permit requirements: (i) Pretreatment facilities approval and reporting. Users shall provide necessary wastewater pretreatment as required to comply with this chapter and shall achieve compliance with the time limitations as specified by the permit. Any facilities required to pretreat wastewater to a level acceptable to the city shall be provided, operated, and maintained at the owner's expense. All required permit application information shall have been submitted to the city for review and approval subsequently granted before any construction of the facilities is commenced. The review and approval of such permit application information, including plans, specifications, and operating procedures, shall in no way relieve the user (permittee) from the responsibility of modifying the facilities as necessary to produce an acceptable effluent under the provisions of this chapter. Any subsequent changes in the pretreatment facilities or method of operation shall be reported to the city at least ninety days prior to the user's initiation of the changes. All records relating to compliance with the permit shall be made available to officials of the city, EPA, or NDEC upon request. Wastewater constituents and characteristics shall not be recognized as confidential information. (ii) Facilities maintenance and records. Pretreatment facilities shall be maintained continuously in satisfactory and effective operation at the owner's expense and shall be subject to periodic inspection by the city. The owner shall maintain operating records and shall submit to the city a monthly effluent summary report. (2) Limits on rate and time of discharge or requirements for flow regulation and equalization. (3) Requirements for a sampling station(s), including city access to such facilities. (4) A self-monitoring program which may include: Sampling locations; frequency and method of sampling; number, types, and standard of tests; and establishing a reporting schedule. The discharger assigned a self-monitoring program in conformance with this chapter shall be responsible for all expenses incurred as a result of the self-monitoring program, including all applicable city charges. (5) Submission of technical reports or discharge reports. (6) Maintenance of plant records relating to wastewater discharges, as specified by the Director, and affording city access thereto. (7) Other conditions as deemed appropriate by the Director to ensure compliance with this chapter or the terms and conditions of the permit, including the agreement of the permittee to furnish at the request of the Director any additional information relating to the installation or use of the wastewater service for which the permit is sought; to accept and abide by all of the provisions of this chapter and all other pertinent ordinances and regulations which may be adopted in the future; to cooperate at all times with the Director in the inspecting, sampling, and study of the industrial wastes and in the facilities provided for pretreatment; and to notify the Director immediately in the event of any accident, negligence, or other occurrence which causes discharge to the public wastewater collectors of any wastes or process waters not covered by the permit or in violation of the permit limitations. (e) Change of discharge permit terms and conditions. The Director may change the terms, conditions, or pollutants covered under the wastewater discharge permit, including changing the average or maximum limits on the elements of wastewater strength, from time to time as circumstances may require. The Director may require the development of a compliance schedule and shall allow a discharger reasonable time to comply with any required changes in the permit, as applicable to the situation. (f) Transfer of discharge permit prohibited. A wastewater discharge permit shall not be assigned or transferred. (g) Termination. The Director may terminate any wastewater discharge permit for violation of the terms and conditions of the permit or the provisions of this chapter. A person whose permit has been terminated shall apply for a new permit within thirty days of notice of termination in order to be considered for a new permit. Any person whose permit has been terminated shall pay all applicable wastewater user charges based upon his former permit until a new permit has been applied for, approved, and issued.
(Ord. 13887 §11; July 9, 1984)
Ask a question about Lincoln law
Corpus searches the Lincoln sections it holds and shows the ones that match, with their citations. Free, no sign-in.
