§ 20.06.130 — Section 109.2 Amended; Schedule of Permit Fees
Lincoln, Nebraska Municipal Code (enCodePlus online edition as published 2026-11-08 (history notes seen through Ord. 21775, Sept. 15, 2025)) · Lincoln Municipal Code § 20.06.130
Corpus is an independent public-information project, not the official City of Lincoln website. Stable reference: corpuslaw.us/code/99c85a01-214d-444a-8f6c-ce990eded8c7
20.06.130 Section 109.2 Amended; Schedule of Permit Fees.
Section 109.2 of the International Building Code is amended to read as follows: 109.2 Schedule of Permit fees. The fee for each permit shall be as set forth in Table 1A and Table 1B below: TABLE 1A BUILDING PERMIT FEES Total Valuation | Fee $0 to and including $1,000 | $55.00 $1,001 to and including $10,000 | $55.00 for the first $1,000, plus $8.00 for each additional $1,000 value and fraction thereof, to and including $10,000 $10,001 to $25,000 | $127.00 for the first $10,000, plus $5.00 for each $1,000 value and fraction thereof, to and including $25,000 Over $25,000 | $202.00 for the first $25,000, plus $2.00 for each $1,000 value and fraction thereof, over $25,000 Reinspection fee (wrong address, work does not pass inspection, work not complete, etc.) | $55.00 TABLE 1B MISCELLANEOUS FEES Permit | Fee Demolition | Residential - $200.00 Commercial - $250.00 plus $.01 per sq. ft. Garages - $30.00 Fire Damage Investigation | $100.00 in addition to building or demolition permit fee Building Damage Investigation | $100.00 in addition to building or demolition Expedited Plan Review | 100% of plan review fee, with a minimum of $300.00 and a maximum of $6,000.00 Extension of Active Building Permit Application | 10% of plan review fee Reinstatement of Expired Permit | 100% of plan review fee The determination of value or valuation under any of the provisions of this code shall be made by the building official. The value to be used in computing the building permit and building plan review fees shall be the total value of all construction work for which the permit is issued, as well as all finish work, painting, roofing, electrical, plumbing, heating, air conditioning, elevators, fire extinguishing systems, and any other permanent equipment. The building official may determine valuation by applying the ICC valuation or other recognized method of estimating building construction project cost. The value or valuation used by the building official in computing the building permit and plan review fees is only an estimate and is not intended to be used as conclusive evidence of the actual value of all construction work for which the permit is issued as well as all finish work, painting, roofing, electrical, plumbing, heating, air conditioning, elevators, fire extinguishing systems, and any other permanent equipment for purposes of determining whether said value exceeds a certain percentage of the fair market value of the building in question. 109.2.1 Plan review fees. When a plan or other data are required to be submitted by Section 107.1, a plan review fee shall be paid at the time of submitting plans and specifications for review. Plan review fees shall also cover zoning, special permit, use permit, or planned unit development reviews. Said plan review fee shall be an amount equal to 65% of the building permit fee as shown in Table 1A above, or $100.00 whichever is greater, for commercial buildings, accessory buildings, and apartments. The plan review fees in this subsection are separate from and in addition to the permit fees specified in Section 109.2 and shall not be credited to the total building permit fee if such permit is issued. There shall be no refund for plan review after any plan review has been completed by the Planning Department, even if the application is withdrawn. One additional plan review of corrections made on the original plans after the initial plan review shall be performed at no cost to the applicant; however, where plans require further corrections, are incomplete, or are changed necessitating additional plan review, an additional plan review fee shall be charged at the rate of 10% of the total permit fee or $50.00, whichever is greater, for each additional review. Shell and limited permit applications will be subject to additional plan review fees as specified in this section. Limited permit reviews will be subject to an additional plan review fee at the rate of twenty percent of the total building permit fee or $100.00, whichever is greater. If plans are revised or changed to the extent a complete review is required, an additional plan review fee shall be charged at the full plan review rate. 109.2.2 Fair Housing Act Plan Review & Inspection Fees. A fee of $30.00 shall be assessed for each dwelling unit in a multi-family building for review and inspection regarding the Fair Housing Act based on Federal and State Laws. 109.2.3 Flood plain development fees. 109.2.3.1 A fee shall be assessed for any development permit applied for under Lincoln Municipal Code Chapters 27.52 and 27.53 and shall be paid at the time of application therefor. The fee for each permit shall be as follows: Flood Plain Development Permit Fees Flood Plain Permit | 15% of Building Fee ($250.00 Minimum) Flood Plain – All other Development (roads, trails, pipelines& levees) | $250.00 Flood Plain Permit – Fill | $250.00 + $50.00 per acre ($2,500.00 Maximum) Flood Plain – Mobile Home Placement | $50.00 Floodplain – Accessory Buildings | $50.00 Flood Plain – Residential Non-substantial Improvement | $100.00 109.2.3.2 In those cases where a development permit is required for a structure, but a building permit is not required, the value of construction as determined by Section 109.3 shall be used to calculate the development permit fee. 109.2.3.3 Any work requiring a development permit commenced prior to the issuance of the permit shall result in the assessment of an investigation fee in accordance with Section 109.4, which investigation fee shall be in addition to the development permit fee. 109.2.3.4 The building official may refund not more than two-thirds (2/3) of the development permit fee when an application for which such fee has been paid is withdrawn or canceled prior to commencement of plan review. 109.2.3.5 Expiration. Permit application and permits shall expire in accordance with Section 105. (: Ord. 20257 §13; October 19, 2015).
(Ord. 21786 §42; September 29, 2025; Ord. 21117 §11; August 23, 2021)
Ask a question about Lincoln law
Corpus searches the Lincoln sections it holds and shows the ones that match, with their citations. Free, no sign-in.
