For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 27.52.020 — Definitions

Lincoln, Nebraska Municipal Code (enCodePlus online edition as published 2026-11-08 (history notes seen through Ord. 21775, Sept. 15, 2025)) · Lincoln Municipal Code § 27.52.020

Corpus is an independent public-information project, not the official City of Lincoln website. Stable reference: corpuslaw.us/code/aba1f00e-4d22-44b9-8423-e74739e4c68c

27.52.020 Definitions.

For the purpose of this chapter, certain terms and words are hereby defined: 100-Year Flood shall mean the flood having a one percent chance of being equaled or exceeded in any given year. 100-Year Flood Elevation shall mean the height of the flood water that would occur during a 100-year flood. Base Flood shall mean the flood having a one percent chance of being equaled or exceeded in any given year. Basement shall mean any enclosed area having its floor below grade level on all sides. Development shall mean any man-made change to improved or unimproved real estate, including but not limited to, buildings or other structures, mining, dredging, filling, grading, paving, excavation or drilling operations, or storage of equipment or materials. Development area shall mean the entire site of a proposed development or improvement. Existing manufactured home park or subdivision shall mean a manufactured home park or subdivision for which the construction of facilities for servicing the lots on which the manufactured homes are to be affixed (including, at a minimum, the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads) is completed before the effective date of this ordinance. Existing Urban Area shall mean those areas inside the corporate limits of the City of Lincoln as well as those areas outside the corporate limits having a zoning designation other than AG Agriculture and AGR Agricultural Residential, on the effective date of this ordinance. Expansion to an existing manufactured home park or subdivision shall mean the preparation of additional sites by the construction of facilities for serving the lots on which the manufactured homes are to be affixed (including the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads). FEMA shall mean the Federal Emergency Management Agency. Fill shall mean soil, buildings, or other material that eliminates flood storage volume in the floodplain. Flood Insurance Rate Map (FIRM) shall mean the Flood Insurance Rate Map for Lancaster County, Nebraska and Incorporated Areas Revised April 16, 2013 issued by FEMA, and any revisions thereto, on which FEMA has delineated both the areas of special flood hazards and the risk premium zones applicable to the community. Flood Insurance Study (FIS) shall mean the Flood Insurance Study for Lancaster County, Nebraska and Incorporated Areas Revised April 16, 2013 issued by FEMA in conjunction with the FIRM and containing background data such as base flood discharges and water surface elevations used to prepare the FIRM. Flood storage area or Salt Creek flood storage area shall mean a portion of the Salt Creek floodprone area that stores floodwaters along the stream reach adjacent to the Salt Creek levee and is assigned a percentage of allowable fill, as shown on the Salt Creek Floodprone Area and Salt Creek Flood Storage Area Detail Maps adopted by resolution of the City Council, copies of which are on file with the Department of Building and Safety. Floodplain shall mean those lands which are subject to a one percent or greater chance of flooding in any given year, as shown on the Flood Insurance Rate Map issued by FEMA for Lancaster County, Nebraska and incorporated areas, as amended. Copies of the said maps shall be on file in the Department of Building and Safety. Floodprone area shall mean those lands subject to a one percent or greater chance of flooding in any given year, as determined by hydrologic and hydraulic studies completed by the City or other government agency, or other acceptable source as approved by the City where this is the best available information. Floodproofing shall mean any combination of structural and nonstructural additions, changes, or adjustments to structures which reduce or eliminate flood damage to real estate or improved real property, water and sanitary facilities, structures and their contents. Floodway shall mean the channel of a river or other watercourses and the adjacent land areas that must be reserved in order to discharge the base flood without cumulatively increasing the water surface elevation more than one foot. Freeboard shall mean a minimum elevation requirement above the 100-year flood elevation or Base Flood Elevation (BFE) that provides a margin of safety against extraordinary or unknown risks, and said minimum elevation shall be 1 foot above the 100-year flood elevation where the floodplain or floodprone area is based upon NOAA Atlas 14 precipitation, or 2 feet above the 100-year flood elevation where the floodplain or floodprone area is not based upon NOAA Atlas 14 precipitation. Historic structure shall mean any structure that is: (a) listed individually in the National Register of Historic Places (a listing maintained by the Department of the Interior) or preliminarily determined by the Secretary of the Interior as meeting the requirements for individual listing on the National Register; (b) certified or preliminarily determined by the City of Lincoln, a Certified Local Government (CLG), in consultation with the Nebraska State Historic Preservation Officer (SHPO), as contributing to the historical significance of a locally or nationally designated historic district; (c) individually designated as a Landmark by the City of Lincoln, a CLG, under the provisions of Chapter 27.57 of the Lincoln Municipal Code. Letter of Map Change (LOMC) shall mean a determination document issued by FEMA that officially revises the FIRM based on updated information, whether improved data or topography changes created by fill placement. Includes Letter of Map Amendment (LOMA), Letter of Map Revision (LOMR), and Letter of Map Revision based on Fill (LOMR-f). Lowest floor shall mean the lowest floor of the lowest enclosed area (including basement). An unfinished or flood-resistant enclosure, usable solely for parking of vehicles or building access, in an area other than a basement area is not considered a building's lowest floor; provided that such enclosure is not built so as to render the structure in violation of the applicable non-elevation design requirements of this ordinance. Manufactured home shall mean, for purposes of this chapter, a structure, transportable in one or more sections, which is built on a permanent chassis and is designed for use with or without a permanent foundation when attached to the required utilities. The term "manufactured home" shall not include a "recreational vehicle." Manufactured home park or subdivision shall mean a parcel (or contiguous parcels) of land divided into two or more manufactured home lots for rent or sale. NAVD shall mean the North American Vertical Datum of 1988. New construction shall mean structures for which the start of construction commenced on or after the effective date of this ordinance and shall include any subsequent improvements to such structures. New manufactured home park or subdivision shall mean a manufactured home park or subdivision for which the construction of facilities for servicing the lots on which the manufactured homes are to be affixed (including at a minimum, the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads) is completed on or after the effective date of this ordinance. Non-substantial improvement shall mean any improvement that does not meet the definition of substantial improvement, as defined in this section. Percentage of allowable fill shall mean the percentage of the volume of flood storage in each flood storage area of Salt Creek that can be allowed to be eliminated without increasing the 100-year flood elevation of Salt Creek by more than one foot. Qualified engineer shall mean a registered professional engineer who, by reason of training and experience, is considered knowledgeable in hydrology and hydraulics and their application to the flood insurance study and has demonstrated competence to the satisfaction of the Director of Building and Safety. Recreational vehicle shall mean a vehicle which is: (1) built on a single chassis; (2) 400 square feet or less when measured at the largest horizontal projections; (3) designed to be self-propelled or permanently towable by a light duty truck; and (4) designed primarily not for use as a permanent dwelling but as temporary living quarters for recreational, camping, travel, or seasonal use. Residential Building or Residential Structure shall mean a dwelling, or non-commercial building or structure designed for habitation by one or more families, or a commercial or mixed-use building that contains one or more dwellings units. This includes condominium and multifamily buildings, dormitories and assisted living facilities, as well as hotels, motels, and rooming houses where the normal occupancy of a guest is 6 months or more. Residential Development shall mean any portion of a development area allowing for residential buildings, residential structures, or residential uses unless residential uses are prohibited by resolution or ordinance. Riverine shall mean relating to, formed by, or resembling a river (including tributaries, streams, brooks, etc.). Special Flood Hazard Area shall mean the land in the floodplain subject to a one percent or greater chance of flooding in any given year. Start of construction shall mean either the first placement of permanent construction of a structure on a site, such as the pouring of slabs or footings, the installation of piles, the construction of columns, or any work beyond the stage of excavation, or the placement of a manufactured home on a foundation. Permanent construction does not include land preparation, such as clearing, grading, and filling; nor does it include the installation of streets and/or walkways; nor does it include excavation for a basement, footings, piers or foundations or the erection of temporary forms; nor does it include the installation on the property of accessory buildings, such as garages or sheds not occupied as dwelling units or not as part of the main structure. For a substantial improvement, the actual start of construction shall mean the first alteration of any wall, ceiling, floor, or other structural part of a building, whether or not that alteration affects the external dimension of the building. Structure shall mean, for floodplain management purposes, a walled and roofed building, including a gas or liquid storage tank, that is principally above ground, as well as a manufactured home. Substantial damage shall mean damage of any origin sustained by a structure whereby the cost of restoring the structure to its before damaged condition would equal to or exceed fifty percent of the market value of the structure before the damage occurred. Substantial improvement shall mean any reconstruction, rehabilitation, addition, or other improvement of a structure, the cost of which equals or exceeds fifty percent of the market value of the structure before the start of construction of the improvement. Substantial improvement shall include structures which have incurred substantial damage, regardless of the actual repair work performed. The term shall not, however, include either (i) any project for improvement of a structure to correct existing violations of state or local health, sanitary, or safety code specifications which have been identified by the local code enforcement official and which are the minimum necessary to assure safe living conditions, or (ii) any alteration of a historic structure, provided that the alteration will not preclude the structure’s continued designation of a historic structure. Variance shall mean a grant of relief from the terms of a floodplain management regulation, this shall be done by Special Permit in accordance with Section 27.52.060 of this chapter. Violation shall mean the failure of a structure or other development to be fully compliant with the floodplain management regulations as set forth in this chapter. A structure or other development without the elevation certificate, other certifications, or other evidence of compliance as required is presumed to be in violation until such time as that documentation is provided. Watershed Master Plan shall mean a plan generated by the City or by the City in cooperation with other agencies, which includes hydrologic and hydraulic modeling for the 100-year event, including 100-year floodplain elevation and limits. (: Ord. 19867 §2; April 15, 2013: Ord. 19485 §2; January 10, 2011: Ord. 18893 §1; March 5, 2007: Ord. 18662 §2; January 9, 2006: Ord. 18359 §2; May 10, 2004).

(Ord. 21393 §3; January 09, 2023)

Ask a question about Lincoln law

Corpus searches the Lincoln sections it holds and shows the ones that match, with their citations. Free, no sign-in.