27.62.150 Manufacturing, Processing, Storage and Distribution Use Group.
A building or premises may be used for the following use types as a permitted conditional use in the designated zoning districts and in compliance with the conditions of approval applicable for that use type. (a) a. Assembly facilities, including but not limited to the assembly of equipment, instruments, and appliances such as computers and musical instruments are allowed in the H-2, H-3, and H-4 zoning districts under the following condition: All storage and display of merchandise, and any parts used in the assembly process, shall be screened from public view by a fence, walls, shrubs, or all such storage and display shall be within the enclosure walls of a building. (b) b. Liquefied petroleum gas and similar gas used for fuel stored above ground is allowed in the I-2 and I-3 zoning districts under the following conditions: (1) 1. Tanks may not exceed 30,000 gallon capacity; (2) 2. The storage of gas shall be for use on the premises, and not for resale; (3) 3. All other combustible material shall be stored in such a way as to permit free access of fire-fighting equipment. (4) 4. Open storage of any other material is allowed only in areas enclosed or otherwise adequately screened from public view with an enclosure or screen at least six feet in height. (5) 5. In the I-2 zoning district tanks shall be adequately screened from public view by a fire-resistant ventilated barrier which shall be at least six feet in height; (c) c. Fuel oil storage tanks and all bulk storage of oils, petroleum, and similar flammable liquids and chemicals are allowed in the I-2 and I-3 zoning districts under the following conditions: (1) 1. Such use shall be adequately screened from public view; (2) 2. Storage of such materials shall be for use on the premises and not for resale, except that resale of such stored material at retail is allowed in conjunction with the operation of a fuel sales facility or similar retail outlet. (d) d. Outdoor motorized vehicle storage is allowed in the H-3, H-4, I-1, and I-2 zoning districts under the following conditions: (1) 1. The outdoor storage shall be screened in conformance with the requirements for screening open storage in Chapter 3.50 of the City of Lincoln Design Standards. (2) 2. There shall be no dismantling, wrecking, or disassembling of any vehicles. (3) 3. Vehicles may not be stacked upon each other. (e) e. Warehouses are allowed in the B-4, H-3, and H-4 zoning districts under the following conditions: (1) 1. In the area of the B-4 zoning district from 150 feet east of 17th Street to the eastern edge of the B-4 zoning district, warehouses are prohibited except that pre-existing warehouses in said area may remain, regardless of time unoccupied, but must cease once the building is demolished. (2) 2. In the H-3 and H-4 zoning districts, warehouses are permitted provided outside storage is enclosed with an opaque fence or wall, that gates in said fence or wall are opaque and no less than six feet in height, and the stored materials are less than the height of the fence, wall, and gates enclosing the outside storage area. Outside storage areas associated with pre-existing warehouses which are not enclosed may remain until such time the building is demolished. (f) f. Temporary paving plants used for the paving of federal or state highways or county roads are allowed in any zoning district during the project construction period under the following conditions: (1) 1. The plant shall be located outside the city limits on premises abutting the specific construction project and having access to a paved road. (2) 2. The boundaries of the property used for the plant shall be located no closer than 300 feet from an occupied dwelling or from any school, place of religious assembly, library, early childhood care facility, hospital, motel, or park. (3) 3. The operator shall require its suppliers to use paved roads or other designated truck routes approved by the County Engineer for the delivery of supplies to the paving plant. (4) 4. Paving material prepared at the plant shall not be transported to any location other than the abutting project. (5) 5. The plant shall be removed upon substantial completion of the construction project. (g) g. Temporary concrete paving plants. Temporary concrete paving plants are permitted in any zoning district by administrative permit issued by the Planning Director. The Planning Director shall not issue a permit or renew a permit without written approval by the Director of the Lincoln- Lancaster County Health Department and the Director of the Transportation and Utilities Department. (1) 1. Applications for an administrative permit shall include: (i) i. A site plan showing the entire limits of the permit area including the plant location, material storage areas, and the ingress/egress; (ii) ii. A dust control and suppression plan including the plant operations and haul roads to and from plant to project; (iii) iii. A description or manufacturer’s specification regarding particulate control equipment; (iv) iv. A copy of a signed contract or other verification that the applicant is under contract to supply concrete for a city arterial street paving project; (v) v. A noise control plan that will allow the operation to comply with Chapter 8.24 of the Lincoln Municipal Code; (vi) vi. A copy of a signed lease or other verification that the applicant has permission of the owner of the land upon which the plant shall be located to locate the plant thereon. (2) 2. The administrative permit shall be issued under the following conditions: (i) i. The plant site shall be approved by the City Engineer, or if outside the city limits, by the County Engineer and shall be located in the general vicinity of the specific arterial street paving project or projects and have access to a paved road; (ii) ii. The boundaries of the property used for the plant shall be located no closer than 300 feet from an occupied dwelling or from any school, place of religious assembly, library, early childhood care facility, hospital, motel, or park; (iii) iii. The permittee shall require its suppliers to use only paved roads approved by the Director of Transportation and Utilities or the County Engineer as the case may be, for the delivery of supplies to the plant. The permittee shall further require that the drivers of concrete trucks leaving the plant also use said paved roads. EXCEPTION: The use of nonpaved roads may be approved on a case-by-case basis by the Director of Transportation and Utilities or the County Engineer; (iv) iv. The permit site shall be cleaned up and restored to its pre-permit condition within thirty days following the completion of the project. Restoration includes replanting of vegetation and maintenance of erosion and sediment control until the site is reestablished. Any paved or unpaved road damaged by the permittee’s use of such road, including permittee’s suppliers and concrete trucks entering and/or leaving the plant, shall be repaired at permittee’s cost and expense; (v) v. All concrete produced by this plant shall be used to complete the project. The concrete shall not be provided for concrete work to be performed by persons other than the permittee; (vi) vi. The anticipated set up and removal dates shall be identified on the application. Amendments to these dates must be requested to the Planning Director in writing; (vii) vii. The applicant shall submit a performance bond satisfactory to the City Attorney in the minimum amount of $5,000, or an amount determined by the City to be sufficient, to guarantee performance and clean up of the permit site and to pay for repairs to paved and unpaved roads damaged by permittee’s use of such roads. (3) 3. Permits issued pursuant to this section shall expire on the completion date of the project as set forth in the permit application. The Planning Director may extend the expiration date by administrative amendment upon a showing that the project completion is delayed or that the permittee has contracted for another project in conformance with subparagraph (a) above. (h) h. Permanent concrete paving plants. Permanent concrete paving plants are permitted in the I-1, I-2, and I-3 Districts subject to the conditions below and with written approval by the Director of the Lincoln-Lancaster County Health Department and the Director of the Transportation and Utilities Department. (1) 1. Applications for a permanent concrete paving plant administrative permit shall include: (1) i. A site plan showing the entire limits of the permit area including the plant location, material storage areas, and the ingress/egress; (2) ii. A dust control and suppression plan including the plant operations and haul roads to and from plant to the project the plant serves; (3) iii. A description or manufacturer’s specification regarding particulate control equipment; (4) iv. A noise control plan demonstrating that the operation complies with Chapter 8.24 of the Lincoln Municipal Code; (5) v. A copy of an executed lease or other verification, acceptable to the City, that the applicant has permission to occupy the land upon which the plant shall be located to locate the plant thereon. (2) 2. The administrative permit for permanent concrete paving plant shall be issued under the following conditions: (1) i. The boundaries of the property where the plant is located are no closer than 300 feet from an occupied dwelling, any school, place of religious assembly, library, early childhood care facility, hospital, motel, or park; (2) ii. The permittee shall require its suppliers to use only paved roads approved by the Director of Transportation and Utilities or the County Engineer, where applicable, for the delivery of supplies to the plant. The permittee shall further require that the drivers of concrete trucks leaving the plant use paved roads; EXCEPTION: Use of nonpaved roads may be approved on a case-by-case basis by the Director of Transportation and Utilities or the County Engineer; (3) iii. The applicant shall obtain an air quality permit or written permission from the Lincoln-Lancaster County Health Department prior to installation of any equipment at the plant site. (i) i. Temporary concrete batch plants. Temporary concrete batch plants are permitted in any zoning district by administrative permit issued by the Planning Director. The Planning Director shall not issue a permit or renew a permit without written approval by the Director of the Lincoln-Lancaster County Health Department. (1) 1. Applications for the administrative permit shall include: (1) i. A site plan showing the entire limits of the permit area including the plant location, material storage areas, and the ingress/egress; (2) ii. A dust control and suppression plan including the plant operations and haul roads to and from plant to project; (3) iii. A statement indicating the typical hours of operation. The plant may operate no more than fourteen hours per day, except on New Year Day, Memorial Day, the 4th of July, Labor Day, Thanksgiving Day, and Christmas when the operation shall not begin before noon; (4) iv. A description or manufacturer’s specification regarding particulate control equipment; (5) v. A copy of a signed contract or other verification that the applicant is under contract to supply concrete for a project requiring at least 3,000 yards of concrete located within the same section or one mile of the permitted plant. The contract or other verification shall include the commencement and ending dates of the project. The Planning Director may increase the one-mile distance limit to no more than two miles if necessary to avoid routing trucks through local streets or inadequate county roads, or locations near occupied dwellings, schools, libraries, places of religious assembly, or other noise or dust sensitive uses; and (6) vi. A noise control plan that will allow the operation to comply with Chapter 8.24 of the Lincoln Municipal Code. (7) vii. A copy of a signed lease or other verification that the applicant has permission of the owner of the land upon which the plant shall be located to locate the plant thereon. (2) 2. The administrative permit shall be issued under the following conditions: (i) i. The plant shall be located on premises in the same section or within one mile of the project identified on the application or as authorized under subparagraph (d)(1)(v) above; (ii) ii. The silo, batch plant, and aggregate storage shall be located no closer than 300 feet from an occupied dwelling or from any school, place of religious assembly, library, early childhood care facility, hospital, motel, or park; (iii) iii. The permittee shall require its suppliers to use only paved roads approved by the Director of Transportation and Utilities or the County Engineer as the case may be, for the delivery of supplies to the concrete batch plant. The permittee shall further require that the drivers of concrete trucks leaving the plant also use said paved roads. EXCEPTION: The use of nonpaved roads may be approved on a case-by-case basis by the Director of Transportation and Utilities or County Engineer. Additional bonding may be required to pay for repairs of damage to such nonpaved roads; (iv) iv. The plant shall be removed upon completion of the project identified in the application; or upon construction and occupancy resulting in a violation of subparagraph (d)(2)(ii) above. The permit site shall be cleaned up and restored to its pre-permit condition within thirty days following the completion of the project; (v) v. All concrete produced by this plant shall be used to complete the project, except that the permittee may use the concrete product for sidewalks, driveways, foundations, parking lots, and other small concrete work to be performed by the permittee. The concrete shall not be provided for concrete work to be performed by persons other than the permittee. The amount of concrete produced for small concrete work shall not exceed fifty percent of that produced for the project; (vi) vi. The plant shall be recalibrated to the satisfaction of the Transportation and Utilities Department prior to construction of any public improvement using concrete produced by this plant; (vii) vii. The anticipated set up and removal dates shall be identified on the application. Amendments to these dates must be requested to the Planning Director in writing; (viii) viii. The applicant shall submit a performance bond satisfactory to the City Attorney in the amount of $5,000 to guarantee performance and clean up of the permit site. (3) 3. Permits issued pursuant to this section shall expire on December 31 of the year of issuance or the completion date of the project as set forth in the permit application, whichever is earlier. The Planning Director may extend the expiration date by an administrative amendment upon a showing that the project completion date is delayed by weather or other causes beyond control of the permittee, or that the permittee has contracted for another project in conformance with subparagraph (a) above; provided, however, no extension of the expiration date may extend the permit beyond December 31 of the year of issuance. Renewal of a previously issued permit shall be by application in the same form as the original permit. (4) 4. The Planning Director may revoke the temporary permit for any one or more of the following violations: (i) i. Failure to operate the facility in accordance with the provisions of this section or with the approved application; (ii) ii. A violation of any city, county, state, or federal law; (iii) iii. Denial of access to the site to determine compliance with this section; (iv) iv. Unreasonable noise or disturbance to the surrounding neighborhood; (j) j. Appeal. The action of the Planning Director in approving, denying, refusing to renew, or revoking an administrative permit for a temporary concrete paving plant or temporary concrete batch plant pursuant to subsections (g) or (h) above may be appealed by any council member, the Mayor, or any aggrieved person to the Planning Commission by filing notice of appeal with the Planning Director within fourteen days following the decision of the Planning Director. Final action by the Planning Commission may be appealed to the City Council by any council member, the Mayor, or any aggrieved person by filing notice of appeal with the City Clerk within fourteen days following the action by the Planning Commission. (: Ord. 20674 §2; June 18, 2018: Ord. 20619 §3; January 29, 2018: Ord. 20435 §2; January 30, 2017: Ord. 20372 §39; August 29, 2016: Ord. 20108 §8; November 17, 2014: Ord. 19827 §13; February 25, 2013: Ord. 19733 §30; June 25, 2012).
(Ord. 21571 §2; February 12, 2024; Ord. 21373 §7; October 31, 2022; Ord. 21093 §5; July 26, 2021; Ord. 20749 §28; February 25, 2019)