5.17.320 Coordination of Construction Activities.
All Grantees are required to cooperate with the City and with each other as follows: (a) By December 1 of each year, each Grantee shall provide the Director of Transportation and Utilities with a schedule of its proposed major construction activities which may affect the right-of-way for the next year. (b) The City shall prepare a one-year repaving plan indicating proposed right-of-way reconstruction, repaving and resurfacing. Such plan shall be updated annually, after receipt of the construction plans of the various Grantees. (c) Each Grantee shall meet with the City, other Grantees and users of the right-of-way annually or as determined by the City to schedule and coordinate construction. (d) All construction locations, activities and schedules shall be coordinated, as ordered by the Director of Transportation and Utilities, to minimize public inconvenience, disruption or damages. (e) Whenever two or more Grantees propose major excavations in the same area within any one year period, the City may require that they jointly excavate to minimize continual disruption to the right-of-way. ( prior Ord. 17759 §32; November 13, 2000).
(Ord. 20747 §19; February 25, 2019)
Ask a question about Lincoln law
Corpus searches the Lincoln sections it holds and shows the ones that match, with their citations. Free, no sign-in.