Sec. 40-118. - Covering work prior to inspection.
Upon the completion of the framing of a building or structure and when the erection of all structural or component parts of a building or structure has been completed, and before any air conditioning/air distribution system, ventilating or exhaust system is covered with insulation, lath, wall board, wall paneling or other interior finish materials, the licensed contractor shall contact the permits and inspections division for a rough-in inspection of the air conditioning/air distribution, ventilating and exhaust system to determine whether all requirements relative to air conditioning/air distribution ventilating and exhaust systems rough-in work has been installed to comply with the provisions of this article.
(Ord. No. 36424, § 1, 10-21-03; Ord. No. 38605, § 1, 12-8-09)
Ask a question about Omaha law
Corpus searches the Omaha sections it holds and shows the ones that match, with their citations. Free, no sign-in.