For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 44-121 — Permit required

Omaha Municipal Code (Supp. No. 100, Update 2: codified through Ordinance No. 44760, enacted August 4, 2026) · Omaha Municipal Code § 44-121

Corpus is an independent public-information project, not the official City of Omaha website. Stable reference: corpuslaw.us/code/1f7a6604-4e2f-4819-b655-bbaec460dd21

Sec. 44-121. - Permit required.

Before proceeding to install, alter, repair, relocate, affix or suspend any electrical wiring, or to install or connect any equipment or apparatus which requires electrical wiring to be installed, affixed or suspended to make the same operable, for either interior or exterior wiring, a permit shall be obtained by an electrical contractor or a master electrician from the electrical official at the permits and inspections division.

(Code 1980, § 44-121; Ord. No. 32967, § 1(44-121), 4-20-93)

Ask a question about Omaha law

Corpus searches the Omaha sections it holds and shows the ones that match, with their citations. Free, no sign-in.