For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 52.052 — INDUSTRIAL DISCHARGE PERMIT CONTENTS

Manchester, New Hampshire Code of Ordinances (2025 S-25: local legislation current through ordinance passed June 3, 2025) · Manchester Code of Ordinances § 52.052

Corpus is an independent public-information project, not the official City of Manchester website. Stable reference: corpuslaw.us/code/09278389-55db-4125-9090-68bfe552400a

§ 52.052 INDUSTRIAL DISCHARGE PERMIT CONTENTS.

(A) The IDP will outline the general and specific conditions under which the industrial process waste will be accepted for discharge into the city's public sewers and drains. (B) Specifically, the IDP will include, but need not be limited to, the following: (1) Pretreatment and self-monitoring facilities required. (2) Self-monitoring, sampling, reporting, notification, and record-keeping requirements. These requirements shall include an identification of pollutants to be monitored, sampling location, sampling frequency, and sample type based on federal, state, and local law. (3) Effluent limitations on the industrial process waste. (4) A statement that indicates IDP duration, which in no event shall exceed five years. (5) A statement that the wastewater discharge permit is nontransferable without prior notification to the city in accordance with § 52.057. (6) A statement of applicable civil and criminal penalties for violation of pretreatment standards and requirements, and any applicable compliance schedule. Such schedule may not extend the time for compliance beyond that required by applicable federal, state, or local law. (Ord. passed 1-17-95) Penalty, see § 52.999

Ask a question about Manchester law

Corpus searches the Manchester sections it holds and shows the ones that match, with their citations. Free, no sign-in.