For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 870-159 — Certification of appropriateness for actions

Code of the City of Camden, New Jersey · Camden City Code § 870-159

Corpus is an independent public-information project, not the official City of Camden website. Stable reference: corpuslaw.us/code/8957dc18-42e3-43fe-8aa4-0f1e23582149

§ 870-159: Certification of appropriateness for actions.

A. A certificate of appropriateness is required in an historic district or historic structure for the following actions: (1) Rehabilitation of the exterior of a structure. (2) Restoration of the exterior facade of a structure. (3) Reconstruction of the exterior of a structure. (4) Additions to any structure. (5) Alteration of the exterior of a structure. (6) Demolition of a structure. (7) New construction. (8) Relocation of a structure or improvement. (9) Erection of signs. B. Any applicant undertaking such rehabilitation, restoration, reconstruction, alteration, new construction or demolition of improvements shall first complete and submit an application for a certificate of appropriateness to the Zoning Officer/Administrative Officer or the Secretary of the Historic Preservation Commission. C. The construction code official shall not issue a permit for exterior rehabilitation, restoration, reconstruction, alteration, new construction or demolition prior to action by the Commission and Board and a certificate of appropriateness issued, except in failure to act in the prescribed time pursuant to N.J.S.A. 40:55D-111. D. A complete application shall consist of: (1) A completed application form, in full, supplied by the Historic Preservation Commission. (2) For vacant structures, additions and new construction, architectural drawings or rendering of details of the exterior of the structure, including but not limited to cornices, brackets, windows/fenestration, brickwork, mortar, window trim and moldings, heads and sills, porches, balusters, porch friezes, projecting elements, doors and bays and finishes to be applied to exterior details. (3) For occupied structures, a narrative description pursuant to guidelines set by the Commission of the proposed scope of work on a facade may be submitted instead of architectural drawings. Said narrative description of proposed scope of work may include but not be limited to the same details as in Subsection D(2) of this section. (4) Photographs of existing building or structure affected by proposed work and photographs of adjacent buildings and/or structures. (5) Material and product data indicating nature of new materials proposed. (6) Samples of proposed new and/or replacement materials (samples shall be brought by applicant to Commission meeting). (7) Claim of economic hardship with required support information and data. (8) Elevations and details of proposed sign indicating materials, dimensions, text style, and actual copy intended. Signs to be mounted and/or hung from a building or structure shall be represented by a drawing showing building or structure elevation at minimum scale of 1/4 inch equals one foot zero inches with proposed sign superimposed on elevation. (9) An application fee of $25 for exterior alterations or additions and $10 for signs. The fee may be waived for low- and moderate-income residents. (10) An application for a certificate of appropriateness for demolition under this article shall present evidence that the structure cannot be put to a reasonable, beneficial use or that there are other substantial grounds of hardship or need requiring demolition of the structure. A lack of long-term maintenance which has caused a deteriorated condition shall not be justification for issuance of a Certificate of Appropriateness for demolition. E. Upon submission of a complete application to the Zoning Officer/Administrative Officer, and his certification thereof, the Historic Preservation Commission shall have no longer than 45 days, or such further time as may be consented to by the applicant, to take action on said application. F. Failure by the Commission to take action within the prescribed time shall be deemed as recommending approval of the application and shall be forwarded to the Board. G. The Commission shall be guided by the Secretary of the Interior's Standards and any standards adopted by the City Council for the regulation of specific historic sites or districts. H. The Commission may recommend to the Board that the application be approved, approved with conditions or denied. A copy of the Commission's action shall be sent, by mail or hand delivery, to the applicant or his representative. I. The Commission, when recommending denial of an application, shall give reasons for said action. J. The Board shall hear all recommendations from the Commission, except as required under this article and the New Jersey Municipal Land Use Law.[1] K. Approvals. (1) The Planning Board, pursuant to § 870-154, shall act within 45 days of Commission action, except when the Board of Adjustment is acting pursuant to Article XXXI, or within such further time as may be consented to by the applicant to take action on said application. (2) A majority of Board members present shall be considered necessary to take action on a Commission recommendation. (3) Failure of the Board to take action within the prescribed time shall be deemed as approving the application. The Secretary of the Board shall issue a certificate of appropriateness and shall note thereon that the Board failed to act within the prescribed time. (4) Upon favorable decision approving or approving with conditions any application, the Board shall issue a certificate of appropriateness. Conditions shall be in detail for rehabilitation, restoration, alteration, reconstruction, new construction or demolition. (5) The certificate of appropriateness shall authorize the Construction Code Official to issue a permit if all other conditions or requirements of the law have been satisfied. Copies of the Board's final decision shall also be sent to the following agencies: (a) The Division of Planning and Zoning. (b) The Department of Planning and Development. (c) The City Architectural Historian or the equivalent. (d) The City Clerk. (e) The Construction Code Official. (f) The Zoning Officer/Administrative Officer. (g) The City Council. (h) The Historic Preservation Commission. (6) If a certificate of appropriateness has been denied, the Construction Code Official or his agent shall not issue a permit unless a subsequent certificate for the same property has been granted. (7) If, after a certificate of appropriateness is issued, a change in scope of work becomes necessary, the applicant shall reapply to the Commission pursuant to procedures in this section. The new application shall be considered an amendment to the original application. (8) The certificate of appropriateness shall be valid for one year from the date of approval. Two extensions of six months each may be granted by the Planning Board. The running of the one-year approval, and the running of any extensions, shall be tolled during the period that the certificate of appropriateness is challenged in a court of law, or in any other manner whether administrative, legislative or judicial, including all applicable appeal periods. The provisions of this section shall be applicable to all certificates of appropriateness which have been issued and have not expired as of the date of adoption of this section (12-14-2010), as well as all certificates of appropriateness which are approved by the Planning Board after the date of adoption of this section. During the one-year approval period of any certificate of appropriateness, as well as the time periods by which it may be extended as a result of either extensions granted by the Planning Board or as a result of the tolling caused by a challenge described above, the City's right to enforce the certificate of appropriateness shall not be in any way limited or restricted by this chapter provision. (9) The Construction Code Official, Zoning Officer/Administrative Officer or their agents may stop work at any site which does not comply with an issued certificate of appropriateness and/or this article. (10) The Historic Preservation Commission shall review the municipal, State and National Register nominations with the same procedures as established for hearings as outlined under N.J.S.A. 40:55D-10 of the New Jersey Municipal Land Use Law. Notice of the hearing shall be published at least 10 days prior to the date thereof.

Ask a question about Camden law

Corpus searches the Camden sections it holds and shows the ones that match, with their citations. Free, no sign-in.