§ 361-11 — Restrictions on operation
Code of the City of Clifton, New Jersey (Code 2026-10-20) · Clifton City Code § 361-11
Corpus is an independent public-information project, not the official City of Clifton website. Stable reference: corpuslaw.us/code/951cdaf6-c6eb-44ec-88b2-f14f89ba2151
§ 361-11: Restrictions on operation.
A. Unless otherwise regulated by state or federal regulations: (1) Quarrying and related operations shall be conducted for a period not in excess of 10 gross hours per day, starting at 7:00 a.m. and ending at 5:00 p.m., Monday through Friday, and starting at 9:00 a.m. and ending at 5:00 p.m. on Saturday. There shall be no trucking of any material from the quarry prior to starting time and after 4:30 p.m. on any day when the quarry is open for operation. (2) Quarrying or related operations shall not be conducted on Sunday, except for necessary operations of an emergent nature; provided, however, that same will not detrimentally affect the health, safety and welfare of the community, more particularly of those inhabitants residing in the neighborhood of the quarry. (3) Nothing contained herein shall be deemed to prevent the emergency maintenance or repair of equipment. B. All drilling must be done by the wet-drilling method or by any other method of equivalent effectiveness for dust control. C. All roads or traveled rights-of-way within the licensed premises must be treated with water in order to prevent the dissemination of dust. Water must be applied whenever necessary. D. Quarrying which will reduce the quarried area below the grade of the lowest adjoining property or road is prohibited. No quarrying shall be permitted which will endanger the lateral support of abutting properties or roads. In the event that quarrying or excavation should result in face slopes in excess of 30º, a minimum leveled (or natural) buffer area of 50 feet shall be provided between any quarry boundary line and the commencement of the slope. E. In no case shall any quarry products, equipment or other materials be deposited or stored on any property, public or private, other than the licensed premises. No buildings, equipment, quarry products or other materials shall be erected or stored within a distance of 50 feet of any quarry boundary line. F. A stockade, chain-link or existing fence of a minimum height of six feet shall be erected around the perimeter of the area being quarried and that has been quarried, and all means of ingress and egress shall be controlled by substantial gates of similar height, which gates shall be closed and securely locked when not in actual use. Reasonable variations of fence alignment may be made in order to accommodate existing natural features and terrain, thereby making erection of the fence practicable within the boundary lines of the quarry premises. Installation of fences shall be completed in segments of 1/3 over three years. The operator of the quarry shall be relieved of the requirements of this section of this chapter if abutting property owners refuse to grant permission to the operator to go upon their land to carry out its requirements. The operator shall establish such refusal by filing with the Quarry Inspector proof of communication with said abutting owners as well as proof of either their affirmative denial of access or their refusal to respond to such communication. If such property owners grant permission for such work in the future, the operator of the quarry shall honor its obligations under this section at that time. The exception established hereunder shall also apply to the requirements set forth in this chapter, which require the operator to erect signs, screening and trees on said abutting property. G. Blasting and the use of explosives shall be in conformity with New Jersey statutes and regulations and federal regulations where applicable. The licenses shall notify the Quarry Inspector of any contemplated blasting, specifying the intensity and force of each said contemplated blast not less than one hour prior to said scheduled blasting. The licensee shall provide the Quarry Inspector with a certified quarterly report of all blasting done during the previous quarter within 30 days of the termination date of said quarter. Said report shall contain the date and time of each blast, the intensity and force thereof, with supporting documentary evidence, and a map or sketch showing the site location of the explosive used for each blast. H. Signs shall be maintained at all entrances or exits of the quarried premises, indicating the name and address of the licensee and that the business being conducted is a licensed quarry operation. Signs shall also be placed at no greater than two-hundred-foot intervals on the perimeter fence, warning of the potential hazard of climbing the fence. The operator shall be excused from complying with this chapter if abutting landowners deny it permission to erect said signs. Denial shall be proven as set forth in Subsection F above. I. Where conveyors discharge material of less than one inch in diameter onto stockpiles of such material and where the free and uncontained fall of material being stockpiled from the conveyor to the highest point of the stockpile shall exceed a distance of six feet, a high-pressure water-mist spray must be directed onto the material as it falls from the conveyor to the stockpile in such manner as to reduce the accumulation and dissemination of dust. J. Wherever the licensed premises abuts a public street, a solid continuous landscape screen shall be planted and maintained. The landscaping shall consist of massed evergreen and deciduous trees and shrubs of such species or density as will provide a solid and continuous screen throughout the full course of the year. This provision shall not apply where the natural contours of the land provide adequate visual screening so that a person of average height traversing said street would not be able to see the quarry operation. K. All crushing and processing of quarry materials shall be conducted by the use of wet-method of dust control or by local exhaust systems of equivalent effectiveness. L. Provisions shall be made for adequate drainage, soil and sediment control, point- and non-point-source water pollution, as in accord with control of the best management standards set by the Environmental Protection Agency, during quarrying operations and after the termination of same. M. Provisions shall be made for the prompt removal from the streets of Clifton of any debris which has either fallen from any truck removing material from the quarry site or has been washed out of the quarry either as a result of natural events or quarry operation.
[Amended 7-2-85 by Ord. No. 4989-85 ]
Ask a question about Clifton law
Corpus searches the Clifton sections it holds and shows the ones that match, with their citations. Free, no sign-in.
