For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 395-4 — Construction specifications

Code of the City of Clifton, New Jersey (Code 2026-10-20) · Clifton City Code § 395-4

Corpus is an independent public-information project, not the official City of Clifton website. Stable reference: corpuslaw.us/code/1186da88-9561-4d28-86cb-4fed51c4c950

§ 395-4: Construction specifications.

A. All sidewalks, curbs, driveways and aprons in any street, avenue, alley or land, or section thereof, in the City of Clifton, where the grade has been or may hereafter be established, shall be constructed and installed to such width of such material as shall be shown in specifications prepared by the City Engineer, in addition to other specifications prepared or which may have been prepared by the City Engineer, not inconsistent with those herein provided, and approved by the Municipal Council. B. The ingredients of the concrete of every sidewalk shall be only portland cement, clean sharp sand and clean broken stone or gravel. No cinders or ashes shall be used in concrete. No concrete shall be used that does not contain at least one part portland cement in every six parts of the whole, or as hereinafter specified. C. Concrete shall be constructed with Type II, air-entrained cement and shall develop a compressive strength of 4,000 pounds per square inch at 28 days. Air-entrainment shall not be less than 3% nor more than 6%. D. Concrete shall be finished with floats and straightedges. Just before the concrete obtains its initial set, it shall be finished with a wooden float and brushed with a wet soft-haired brush. Surfaces shall drain completely at all times. Concrete sidewalks shall be sloped toward the street at a grade of one-fourth (1/4) inch per foot. All edges shall be finished and rounded with an edging tool having a radius of one-fourth (1/4) inch. E. Expansion joints shall be one-half (1/2) inch wide placed at intervals of approximately 20 feet and shall be filled with performed expansion joint filler. Traverse construction joints shall be one-eighth (1/8) inch thick placed midway between expansion joints. Blind joints shall cut midway between the expansion and contraction joints. Expansion joints shall be placed between the sidewalk/driveway and all appurtenances, such as manholes, utility poles, curb, etc. An expansion joint shall be placed between sidewalk and concrete apron and/or concrete driveway. Expansion joint filler shall be performed bituminous conforming to AASHTO M33, M153 Type II and M213. F. Concrete shall be placed on a firm, compacted subgrade. All concrete sidewalks shall be at least four feet wide and shall be four inches thick, except at driveways, in which case sidewalks, aprons and driveways shall be six inches thick. G. At the intersection of two streets or where required by federal or state statutes or City of Clifton ordinances, handicap ramp curbs and sidewalks shall be constructed in accordance with the prevailing requirements of Subchapter 7 (Barrier Free) of the Uniform Construction Code of New Jersey. H. Concrete paver driveway aprons shall be constructed as follows: Precast concrete pavers shall be of standard size, approximately four inches wide by eight inches long by 2.375 inches +/- 0.125 inches thick, and reasonably uniform in size and shape, with a minimum compressive strength of 8,000 PSI and a water absorption maximum of 5%. Concrete pavers shall exceed the standards of ASTM C-936-82. No pavers shall be set in the sidewalk. (1) The concrete pavers shall be laid on a base consisting of two-inch 4,000 PSI concrete on top of four-inch-thick densely graded aggregate (quarry process stone) compacted and rolled. The pavers are to be set to the correct position and grade with a rubber mallet. All cuts of the pavers are to be made to an even and straight line with a carborundum disk wet saw. After all the pavers are in position, sand shall be swept over the surface completely, then using a plate compactor to tamp the pavers to a uniform level. Two or three passes of the compactor shall be made to bring the pavers to their final level. Tamping shall be done in both directions. After each area of pavers is compacted, clean masons sand is to be sandswept in all directions into the intermittent joints between the pavers. Vehicle traffic shall not be allowed on paved surface until sweeping is completed. I. After forms are in place and prior to pouring concrete and setting pavers, the applicant shall call the Clifton Engineering Department for an inspection of the forms. No concrete is to be poured, and no pavers are to be set without inspection and approval by the City Engineer or his representative. J. The City assumes no responsibility upon or by virtue of the issuance of the sidewalk, curb or driveway permit.

[Amended 8-4-87 by Ord. No. 5190-87 ]

Ask a question about Clifton law

Corpus searches the Clifton sections it holds and shows the ones that match, with their citations. Free, no sign-in.