§ 461-24.1 — Steep Slope District
Code of the City of Clifton, New Jersey (Code 2026-10-20) · Clifton City Code § 461-24.1
Corpus is an independent public-information project, not the official City of Clifton website. Stable reference: corpuslaw.us/code/0bb0b2cd-a558-41d1-a9d3-90108a90b9ef
§ 461-24.1: Steep Slope District.
A. Purpose and scope. (1) The Steep Slope District is an overlay zone intended as an option to the underlying RA-1 and RA-3 zones in the district. (2) It is the intent of the Steep Slope District to establish special land use development controls in the area along the west side of Valley Road to the western boundary of the City of Clifton with Montclair, Little Falls, West Paterson and Paterson. This area consists of the top of the cliff, the cliff face, the talus slope and the side slope of Garrett Mountain. It includes both residentially developed areas and undeveloped lands. The vacant parcels of land remain as one of the few undeveloped areas in the City of Clifton and are subject to increasing development pressures. Due to the environmental sensitivity of steep-sloped topography, there is a special need to control development which could create hazards such as flooding, soil erosion or land slumps, or could destroy important public resources such as ridgelines, tree masses or other amenities. (3) It is the purpose of this district to protect the health, safety and general welfare of the people and property within the City of Clifton from improper construction, building and development on relatively steep-sloped areas in the City. In particular, the aim of this district is to mitigate potential hazards which exist in steep-sloped areas by reason of soil erosion, sedimentation, soil slippage, flooding, surface water runoff, rockfall, destruction of unique views, loss of vegetation and damage to downhill areas. Furthermore, it is appropriate that special design and construction practices be conducted within steep-sloped areas to preserve and maximize the best use of the natural terrain and to maintain the critical land forms intact to the extent reasonably possible and desirable. B. Applicability. The steep slope regulations shall apply to all applications for development in the Steep Slope District except single-family homes on preexisting lots. This would include, but not be limited to, subdivisions, site plans and conditional uses. C. Permitted uses. The permitted principal uses in this district shall be: (1) Lots in excess of 3.5 acres. (a) Semidetached and detached two-family dwellings. (b) Townhouses and garden apartments in single buildings or dwelling groups. (2) Single-family detached dwellings. (3) Private schools and houses of worship as conditional uses subject to Article VI. D. Procedural requirements. For all land development applications, the following information shall be submitted in addition to other submission requirements of the Zoning Ordinance and Subdivision Regulations:[1] (1) A topographic map of the subject property at two-foot contour intervals, with the cross-slope identified by measurement of those areas under 15%, 15.1% to 25%, 25.1% to 30% and over 30% shall be submitted. (2) A soils engineering report regarding site characteristics of the subject property to include the nature, distribution and suitability of subsurface soils for load-bearing, stability and compaction, extent, description and location of exposed rock; erodibility potential of surface soils; permeability and available water-infiltration capacity; depth to bedrock and seasonal highwater table; and the location, type and intensity of vegetative cover on the subject property. (3) A geophysical-hydrologic report investigating conditions of the site's underlying geologic formation and the hydrological characteristics of the proposed development shall be submitted. It must demonstrate that any adverse impacts can be overcome in such a manner as to prevent hazard to life and property and to maintain amenable site features for stormwater management, soil erosion and sedimentation control, vegetative cover and exposed rock stability. (4) Site grading and development data shall be submitted and shall include the type and location of development activity; procedures for grading, excavation, construction access, stockpiling; extent and phasing of construction; and cut and fill operations. (5) A land forms analysis prepared by a geologist or a licensed professional engineer shall be submitted showing the location and extent of the site's major landforms including the top of cliff, base of cliff, the cliff face, talus slope and the side slope. The landform analyses shall calculate the area in each landform category. (6) Any other information which may be reasonably necessary to determine compliance with this section. E. Performance standards. Each land development application in this District shall accomplish the following in the preparation of plans and specifications for site preparation and improvements: (1) The peak rate of surface water runoff after development shall be controlled so that it is no greater than predevelopment conditions for the twenty-five-year storm of twenty-four-hour duration. (2) Any exposed soils shall be stabilized both during and after construction and development. (3) The number and extent of cuts shall be minimized to prevent groundwater discharge or ponding. (4) The maximum number of trees and other vegetative cover shall be preserved. (5) Soil and rock slippage shall be impeded, and any environmentally sensitive areas shall be protected. (6) Improvements shall be designed to follow the natural contours of the land, and to provide the least disruption to the land form. (7) Blasting shall not be conducted unless clearly necessary for site preparation. Blasting shall be conducted during daylight hours consistent with municipal and state laws. F. Compliance with regulations of the Soil Conservation District. All applications made under the provisions of the Steep Slope District shall comply with the regulations governing the Hudson-Essex-Passaic Soil Conservation District. The regulations adopted by the Soil Conservation District in compliance with N.J.S.A 4:24-23 shall govern land disturbance of construction in the Steep Slope District. Application to the Hudson-Essex-Passaic Soil Conservation District shall be filed simultaneously with the filing of an application with the City of Clifton. Any approvals granted by the Planning Board or Board of Adjustment of the City of Clifton shall be conditioned upon approval of the Hudson-Essex-Passaic Soil Conservation District. A preapplication conference with the Soil Conservation District may be requested by the applicant. G. Density computations. (1) Applicability. Uses identified in Subsection C, other than single-family detached dwellings on preexisting lots, are permitted only on sites of at least 3.5 acres in area in the Steep Slope District. (2) The maximum density for uses other than single-family detached dwellings in the Steep Slope District shall not exceed seven units per acre and shall be determined by the development controls contained in this section. H. Impervious surface/open space ratios. The ratio of maximum impervious surface to minimum open space on the area of the parcel excluding the cliff face shall be based upon each slope category as follows: Average Slope(percent) | Maximum Building Coverage(percent) | Maximum Impervious Surface in Addition to Buildings(percent) | Minimum Open Space(percent) 0-15 | 25 | 30 | 30 15.1-25 | 15 | 25 | 40 25.1-30 | 10 | 25 | 50 over 30 | 0 | 0 | 100 I. Special development requirements. Design and construction standards are specified herein. Terms and conditions of approval of a proposed land development application in this district shall be imposed to assure that it achieves the minimum criteria, as follows: (1) Cut and fill requirements. (a) No soil shall be excavated, removed, deposited or disturbed within an area of slope in excess of 30% or on the cliff face or in the talus slope area. (b) The uppermost point of a cut slope shall not be higher than the top of the nearest downhill structure or building, but the vertical cut shall in no event be greater than 15 feet. (c) Vegetation shall be reestablished on all exposed fill slopes. Exposed graded areas shall be mulched and seeded to provide a basic ground cover which will prevent erosion and permit revegetation. In the alternative, they may be rip-rapped and blended into the natural setting. (d) No land shall be graded, cut or filled so as to create a slope exceeding a vertical rise of one foot for each two feet of horizontal distance between abutting lots, and may do so within a lot only where a stone retaining wall of sufficient height and thickness is provided to retain the graded bank. (2) Grade requirements. (a) Paved roads shall not exceed a fourteen-percent slope and the average slope of all roads in the development shall not exceed 10%. Parking and walkways shall not be excess of 6% unless the construction of a ramp is required or steps provided. (b) Each grading shall be judged on its own merits and its relationship to surrounding contours. (3) Setback and buffer requirements. (a) The minimum building setback line from the Valley Road right-of-way line shall be 40 feet. (b) The minimum building setback line from the cliff face shall be the horizontal distance of the talus slope plus 50 feet. The fifty-foot area shall be slope-stablized through the placement of large flat rocks or special precast concrete slabs and cribbing with pressure-treated beams or logs. This would be complemented with trees and shrubs. (c) No structure on the top of the slope shall be located within 100 feet of the cliff face. (4) Streets. (a) In the Steep Slope District, standards for right-of-way width and paving width may be reduced to 40 feet and 26 feet. (b) Within 100 feet of Valley Road, public access streets shall have a right-of-way and paving width of 50 feet and 36 feet respectively. (c) Curbs may be located on only one side of a street in the Steep Slope District. The curb shall be located on the lower side of the street in order to control and channel the flow of stormwater. (d) Sidewalks may be located on only one side of a street in the Steep Slope District. The sidewalk shall be located on the uphill side of the street; however, the pedestrian system should be designed to limit street crossings. (5) Compaction of fill. (a) Fill material shall not consist of or include organic material, nor rocks greater than eight inches in diameter. (b) Fill material shall be compacted to 90% of maximum density. (6) Design guidelines. (a) Structures shall be built on the lesser slopes. No structures shall be located on the talus slope or the cliff face. (b) Each major subdivision and/or development in excess of five acres shall provide, if possible, a lookout area or observation point to take advantage of the topographic prominence of the Steep Slope District. This area shall be usable by either residents of the site or by the public at large. If available to the public at large, appropriate off-street parking shall be provided. (c) Residences should be oriented where possible to the east to take advantage of the major views from the Garret Mountain slope. (d) Roads shall be primarily north-south to follow contours, to take advantage of winter sun melt and to reduce stormwater runoff velocity. (e) The higher and lower sections of the residential development should be linked, where possible, by an internal pedestrian system or steps and ramps. The pedestrian system would typically be perpendicular to the road system. (7) Vegetation and revegetation. (a) The developer shall submit stabilization and revegetation plan which shall include a complete description of the existing vegetation, the vegetation to be planted, and slope stabilization measures to be installed. The revegetation and slope stabilization plan shall be submitted with the grading plan. (b) Vegetation shall be removed only when absolutely necessary (e.g., for buildings, filled areas, roads). (c) Every effort shall be made to conserve topsoil which is removed during construction for later use on areas requiring vegetation or landscaping (e.g., cut and fill slopes). (d) Vegetation sufficient to stabilize the soil shall be established on all disturbed areas as each stage of grading is completed. All disturbed soil surfaces shall be stabilized or covered prior to the first day of November. If the planned impervious surface (e.g., roads, driveways, etc.) cannot be established prior to November, a temporary treatment adequate to prevent erosion shall be installed on those surfaces. (e) Construction shall be scheduled to minimize soil disturbance between the first day of November and the first day of April. J. Bulk regulations. Unless specifically set forth in this section to the contrary, the bulk regulations contained in Article IV and the supplementary regulations contained in Article V shall apply to land use development in the Steep Slope District. This shall include bulk and supplementary regulations for garden apartments and townhouses. K. Height requirements. Building Type | Stories | Feet One-family dwelling | 2 | 30 Two-family dwelling | 2 1/2 | 35 Garden apartments | 2 | 30 Townhouses | 3 | 35 L. Review by City Engineer required. Any application for development which is subject to the controls of this section shall, upon filing, be forwarded to the City Engineer for a report. The review by the City Engineer shall include an analysis of the plans as to compliance or noncompliance with the performance standards and special development requirements of this section. No hearing on said applications shall be scheduled until the City Engineer determines that he has sufficient information to start with his review and shall so notify the Zoning Officer. M. Enforcement. The City Engineer or any other professional engaged by the City of Clifton for this purpose shall be responsible for the monitoring and enforcement of the performance standards and development requirements of this section. N. Definitions. As used in this section, the following terms shall have the meanings indicated: AVERAGE SLOPE The "average slope" of the property shall be calculated on the basis of the following formula: S = 0.0023 x I x L (sign) A Where 0.0023 = | Conversion factor of square feet to acres I = | Contour interval L = | Total length of contour lines within the parcel, but not including cliff face A = | Area in acres, but not including cliff face BEDROCK Continuous solid rock that underlies regolith. CLIFF FACE A sheer, nearly vertical slope of exposed bedrock. DEVELOPABLE AREA The portion of a lot, exclusive of the cliff face, on which the dwelling unit capacity of the lot is calculated. PERMITTED ZONE DENSITY In the Steep Slope Overlay District, the density permitted for single-family homes in the underlying RA-1 and RA-3 zones. REGOLITH The noncemented rock fragments and mineral grains, including soil, derived which overlie bedrock. ROCK WASTE The material comprising the talus slope or sliderock. SIDE SLOPE The section of a steep-sloped area that is below the talus slope and generally of moderate or lesser gradient than the talus slope or the cliff face. STEEP SLOPE OVERLAY DISTRICT A district located west of Valley Road in the City of Clifton which contains a series of zoning controls related to the topography of the land in the district. All uses in the district except single-family homes on preexisting lots shall be subject to the Steep Slope District requirements. TALUS SLOPE The apron, cone or embankment of rock waste sloping outward from the base of the cliff face that is the course of the rock waste. TOP OF CLIFF The portion of a hill located above the cliff face, overlain with regolith, generally the plateau or hill crest.
[Added 3-18-1986 by Ord. No. 5062-86 ]
Ask a question about Clifton law
Corpus searches the Clifton sections it holds and shows the ones that match, with their citations. Free, no sign-in.
