12.08.120 - Rules and regulations.

All permits issued under this section shall be subject to the following rules and regulations: A. All excavations shall be kept properly barricaded at all times and during the hours of darkness shall be provided with proper warning lights. This regulation shall not excuse the permittee from taking any other necessary precautions for the protection of persons or property. Permittee is responsible for providing any pedestrian and/or vehicular traffic control where the work involves the diversion of traffic flow as required by the police department. B. All work shall be done in such a manner as to cause a minimum of interference with pedestrian and/or vehicular traffic on the street affected. C. The city engineer may, upon application by the permittee, extend the time limit during which the permit shall be valid. D. All refuse and material shall be removed within forty-eight (48) hours. E. All excavations shall be completely backfilled by the permittee, and shall be compacted by tamping or other suitable means in a manner prescribed by the department of public works/engineering division. Where the public works inspector determines that the excavated materials are unsuitable for backfill, the permittee shall backfill the excavation with bank run gravel or crushed stone. F. If tunneling operations are required, the tunnel shall be backfilled with rammed concrete composed of one part cement to ten (10) parts sand. G. If blasting is required to be done in the course of any excavation, it shall be done in strict compliance with all applicable state laws and regulations. H. If the work is not completed within the time specified in the permit or any extension granted by the city engineer, or is not performed in accordance with the regulations set forth in this subsection and any other regulations that may be established by the city engineer, then the city engineer may instruct the department of public works to complete the work and restore the surface of the street. The cost of completing the work and restoring the street shall be charged to the permittee and may be deducted from his deposit or recovered by an action in court of competent jurisdiction. I. All excavation work shall be done in accordance with the OSHA Construction Safety Orders.

(Prior code § 126-29.2)

Ask a question about Elizabeth law

Corpus searches the Elizabeth sections it holds and shows the ones that match, with their citations. Free, no sign-in.