For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 13.16.130 — Computation of charges

Code of Ordinances of the City of Elizabeth, New Jersey (Supp. No. 31: codified through Ordinance No. 6138, passed June 24, 2025) · Elizabeth City Code § 13.16.130

Corpus is an independent public-information project, not the official City of Elizabeth website. Stable reference: corpuslaw.us/code/443d8d52-bbd7-40a4-881f-7ef1e6499367

13.16.130 - Computation of charges.

A. Pursuant to N.J.S.A. 40A:26A-1, et seq., the city establishes and imposes user charges in the city for the use of the sewer system or any part or parts thereof and establishes and imposes such computed user charges as shall be hereinafter provided. B. The user charge shall consist of a fixed facility charge and a volumetric charge. In addition, industrial users shall pay separate BOD and TSS charges. C. All users (except industrial users) shall be billed quarterly in arrears. Industrial users shall be billed monthly in arrears for facility and volumetric charges and quarterly in arrears for BOD and TSS charges. D. Facility Charges. 1. The facility charge shall be based on the size of the water meter serving the user. A separate facility charge will be charged for each meter. 2. The facility charge for each metered service shall be as follows: Meter Size In Inches | Charge Per Quarter ⅝ | $ 4.20 ¾ | 11.21 1 | 29.01 1½ | 79.88 2 | 151.11 3 | 354.60 4 | 639.50 6 | 1,453.46 8 | 2,593.04 10 | 4,058.86 E. Volumetric Charges. 1. There shall be three (3) separate volumetric rates as follows: Class (1) users with a water meter size of less than one inch; Class (2) users with a water meter size of one inch or greater; and Class (3) comprising all industrial users regardless of water meter size. 2. Volumetric rates for users in Class (1) and Class (2) shall be based on allocated shares of flow-related costs and allocated shares of BOD and TSS-related costs. 3. The volumetric rate for Class (3) industrial users shall be based only on an allocated share of flow-related costs and not upon any allocated shares of BOD and TSS-related costs, which shall be billed separately. 4. The volumetric charge for Class (1) and Class (2) users shall be based upon the amount of water supplied by the city water utility or by such other system supplying water to the user as shown by the water meter readings for the most recent quarterly period prior to billing; provided, however, that whenever water consumption is metered but the charge for the measuring period is based upon an estimated consumption due to the fact that a meter reading was not made for the measuring period, the sewer charges shall likewise be based upon the estimated consumption. a. The volumetric rate for Class (1) users shall be five dollars and thirty-two cents ($5.32) per one hundred (100) cubic feet of water. b. The volumetric charge for Class (2) users shall be eight dollars and forty-six cents ($8.46) per one hundred (100) cubic feet of water. c. Multi-family residential users served by a one inch meter or larger may submit a request to the director of public works that the city charge them under the ⅝"—¾" classification. Such requests shall be on application forms prescribed by the city and accompanied by sketches, narrative and certifications listed on the application or subsequently requested by the city. The city shall have the right to enter and inspect the premises in question to clarify and verify information submitted by the applicant. A determination of such request shall be based on information furnished to the city and/or collected by the city. Where a user in the one inch and larger classification is strictly residential in nature and metered separately from other classifications, the city may reclassify the user. The city reserves the right to return the user to the one inch and above classification if determined by the city that the characteristics of the user's discharge are not consistent with those of the ⅝"—¾" classification. 5. The volumetric charge for Class (3) industrial users shall be based upon the amount of water supplied by the city water utility or by such other system supplying water to the user as shown by the water meter readings for the most recent quarterly period prior to billing; provided, however, that whenever water consumption is metered but the charge for the measuring period is based upon an estimated consumption due to the fact that a meter reading was not made for the measuring period, the sewer charges shall likewise be based upon the estimated consumption. The volumetric rate for Class (3) industrial users shall be four dollars and thirty-two cents ($4.32) per one hundred (100) cubic feet of water. 6. In the case of consumers of water who discharge into the sewer system an amount of sewage substantially less than or substantially greater than the amount of water supplied to such consumer, the amounts of the sewage discharged into the sewer system shall be determined by meters, gauges or other suitable measuring devices furnished or approved by the city and installed by such consumer at the consumer's expense and at no cost or expense to the city, and the user charge thereon shall be computed at the rates stipulated herein for sewage discharged into the sewer system. 7. The department of public works may require the owner of any real property subject to user charges of the city to install a meter, gauge or other suitable measuring device which is acceptable to the department of public works and installed at the consumer's expense and at no cost or expense to the city, provided, however, that any determination of the department of public works is subject to review and modification by a court of competent jurisdiction. 8. Any owner of real property subject to user charges discharging into the city sewer system who claims to be unable to install a meter, gauge or other suitable measuring device after being so ordered by the director of public works may submit to the department of public works a written application requesting that the department of public works grant to the owner a specified extension of time within which to install such meter, gauge or other suitable measuring device. In the event the department of public works shall grant such specified extension of time, such owner shall install a meter, gauge or other suitable measuring device on or before the date fixed and prescribed therefore by the department of public works and shall pay user charges on or before the times fixed and prescribed there-for by the department of public works. Prior to such installation, the department of public works shall estimate the amount of sewage discharged by such owner into the sewer system. Such estimate by the department of public works shall be submitted to the city council for its approval or modification, and the decision of the city council with respect thereto shall be binding and final unless modified by a court of competent jurisdiction following any review thereof permitted by law. Such owner shall thereupon, prior to the aforementioned installation of a meter, gauge or other suitable measuring device, pay user charges computed at the rate defined in this section for the estimated sewage discharged into the sewer system, and the decision of the department of public works with respect to the amount thereof shall be binding and final unless modified by a court of competent jurisdiction following any review thereof permitted by law. Such user charges computed at the rate defined in this section for the estimated sewage discharged into the sewer system shall be due and payable at such time as the chief financial officer shall fix and prescribe, therefore. 9. Any owner of real property in the city subject to user charges who fails to submit to the department of public works a written application requesting that the department of public works grant to such owner a specified extension of time within which to install a meter, gauge or other suitable measuring device and any owner of real property in the city subject to user charges whose written application is denied by the department of public works shall pay sewer user charges equal to one hundred twenty-five (125) percent of the estimate computed by the department of public works in the manner set forth in subsection E.8. of this section. 10. In all cases in which users of the sewerage system are not supplied with water from the city water utility, the charge for the use of sewerage system shall be based upon the actual discharge as measured by a meter to be installed by the consumer; provided, however, that when in the judgment of the director of public works such charges may be reasonably accurately estimated, the initial charges may be based upon his or her estimate of actual discharge volume. 11. In any other case where the charges for sewer services cannot be reasonably measured based on water consumption during the measuring period, the initial and any subsequent charges shall be based upon an estimate, which may be revised from period to period. F. BOD and TSS Charges. 1. In addition to facility and volumetric charges, industrial users shall be subject to a separate charge for BOD and TSS. 2. Charges for TSS and BOD shall be based on total suspended solids and five-day BOD loadings computed by the joint meeting and reported quarterly to the city. 3. Each industrial user shall perform sampling and analysis in accordance with its industrial user permit and the rules and regulations of the joint meeting. 4. An industrial user may sample and analyze its discharge for suspended solids and five-day BOD at a greater frequency than specified in its industrial user permit provided that the results of all such testing are included in the periodic monitoring reports submitted to the joint meeting. All such additional sampling and analyses shall be the sole responsibility of and at the expense of the industrial user. 5. Samples and measurements taken by industrial users as required by the joint meeting industrial user permit and such additional sampling and analyses taken at the option of the industrial user shall be representative of the volume and nature of the monitored discharge. 6. The rates for BOD and TSS charges for industrial users shall be one hundred twenty-five (125) percent of the rates charged by the joint meeting to the city as those rates may be changed from time to time.

(Ord. No. 6015, § 2, 6-25-2024; Ord. No. 5466, § 2, 4-27-2021; Ord. No. 5025, § 2, 6-26-2018; Ord. No. 4593, § 2, 5-26-2015; Ord. No. 4466, § 2, 6-24-2014; Ord. No. 4085, §§ 1—4, 11-24-2009; Ord. No. 4019, §§ 1—4, 2-10-2009; Ord. 3833 §§ 1—4, 2006; prior code § 118-14)

Ask a question about Elizabeth law

Corpus searches the Elizabeth sections it holds and shows the ones that match, with their citations. Free, no sign-in.