§ 13.24.110 — Stormwater management requirements for minor developments
Code of Ordinances of the City of Elizabeth, New Jersey (Supp. No. 31: codified through Ordinance No. 6138, passed June 24, 2025) · Elizabeth City Code § 13.24.110
Corpus is an independent public-information project, not the official City of Elizabeth website. Stable reference: corpuslaw.us/code/d2b6bf7e-1c52-4d6a-9d53-fbfbfe24349f
13.24.110 - Stormwater management requirements for minor developments.
A. Regulated activities that meet the definition of a "minor development" are exempt from the requirements for sections 13.24.040, 13.24.080, 13.24.090, and 13.24.110 of this chapter except as provided in the paragraphs below. B. Administration. 1. In cases where a development requires an application to the planning board or the zoning board of adjustment and the zoning officer determines the development meets the definition of a minor development, the applicant shall proceed to submit a minor development stormwater management plan for review and approval with regard to the provisions this section, in addition to other required materials per the land use code. The planning board or zoning board may specify stormwater management measures as conditions of approval. 2. In cases where a development does not require municipal board approval, but a municipal sewer or road opening/utility permit is required and the city engineer determines that the development meets the definition of a minor development, then the applicant shall submit a minor development stormwater management plan and the city engineer shall review the plan for compliance with the provisions of this section. 3. The applicant shall provide four (4) copies of the following information with any stormwater management plan submission for minor developments the: i. Site plans showing dimensions of the property, existing and proposed buildings and structures, and other site features such as driveways, patios, and sidewalks. All existing impervious features, such as dwellings, garages, sheds, driveways, patios, steps, and porches shall be shown to scale on the site plans. Each of these items shall have a description of their material makeup, i.e., pitched slate roof, asphalt driveway, concrete steps. ii. All new features being proposed shall be shown to scale and with dimensions on the site plans. The new features shall be described with material makeup. The plan shall include existing and proposed elevations and contour lines over the entire area of the proposed property. Any existing feature to be removed or relocated shall be indicated. iii. Flood hazard area limits and wetlands shall be shown on the site plans if applicable. iv. Calculations of existing and proposed impervious cover. v. Calculations of the volume of required storage. vi. Proposed design for stormwater management techniques, including construction specifications of the materials to be used for stormwater management facilities. vii. All stormwater management facilities must be located on a plan and described in detail; and all calculations, assumptions, and criteria used in the design of the stormwater management facilities must be shown. 4. An exemption from one or more of the requirements of this section may be granted at the discretion of the city engineer. Any applicant desiring an exemption shall present a list of all exemptions requested and the reasons therefore. C. Design and Performance Standards. 1. No minor development shall cause an increase in erosion on site or off site. 2. No minor development shall alter existing drainage patterns to increase discharge onto adjacent areas. 3. Any new or modified downspout or area drain that drains any impervious surface shall discharge onto a pervious surface or into a stormwater best management practice that complies with this chapter, unless approved by the city engineer. 4. Soil erosion and sediment control measures shall be installed in accordance with the Standards for Soil Erosion and Sediment Control in New Jersey. 5. For minor developments on one- through four-family residential properties, a volume for water storage shall be provided equivalent to three (3) inches of runoff from all proposed impervious surface and shall be configured to accept and store such runoff. Provisions shall be made for positive overflow relief that will not impact adjacent properties. 6. For minor developments not covered under subsection C.5., stormwater management measures shall be designed and installed so that the post-construction peak runoff rates for the two-year, ten-year, and 100-year storm events are no more than fifty (50), seventy-five (75), and one hundred (100) percent, respectively, of the pre-construction peak runoff rates applied at the site's boundary to each abutting lot, roadway, watercourse, or receiving storm sewer system. The percentages apply only to the post-construction stormwater runoff that is attributable to the portion of the site on which the proposed development or project is to be disturbed. 7. Stormwater management practices provided under subsection C.6. shall be designed in accordance with applicable sections of the New Jersey Stormwater Best Management Practices Manual relative to quantity control. 8. All facilities shall be designed in accordance with acceptable engineering practices subject to the approval of the municipal board or official. D. Maintenance. 1. The owner of any installation or system installed under this chapter to control or regulate stormwater runoff shall properly maintain such installation or system to ensure its correct functioning. 2. An applicant grants the city the right of access to inspect any stormwater management measures identified on the submitted site plan to determine correct functioning. 3. Preventative and corrective maintenance shall be performed to maintain the functional parameters (storage volume, infiltration rates, inflow/outflow capacity, etc.) of the stormwater management measure, including, but not limited to, repairs or replacement to the structure; removal of sediment, debris, or trash; restoration of eroded areas; snow and ice removal; fence repair or replacement; restoration of vegetation; and repair or replacement of non-vegetated linings. 4. In the event that the stormwater management facility becomes a danger to public safety or public health, or if it is in need of maintenance or repair, the municipality shall so notify the responsible person in writing. Upon receipt of that notice, the responsible person shall have fourteen (14) days to effect maintenance and repair of the facility in a manner that is approved by the municipal engineer or his designee. The municipality, in its discretion, may extend the time allowed for effecting maintenance and repair for good cause. If the responsible person fails or refuses to perform such maintenance and repair, the municipality or county may immediately proceed to do so and shall bill the cost thereof to the responsible person. Nonpayment of such bill may result in a lien on the property. 5. A stormwater management measure approved under the municipal stormwater management plan or ordinance may be altered or replaced with the approval of the municipality, if the municipality determines that the proposed alteration or replacement meets the design and performance standards pursuant to this section and provides the same level of stormwater management as the previously approved stormwater management measure that is being altered or replaced. E. The penalties listed in section 13.24.120 apply to minor developments.
(Ord. No. 6014, § 12, 6-25-2024)