15.04.040 - Construction permit fee schedule.

A. Generally. 1. The fee for a construction permit shall be the sum of the subcode fees listed and shall be paid before the permit is issued. 2. The fees for new construction shall be based upon the volume of the structure. The volume shall be computed in accordance with N.J.A.C. 5:23-2.28. For the purposes of calculating the volume to determine the fee for large, open-volume, single story spaces in buildings, the height shall be limited to twenty (20) feet notwithstanding the fact that the actual height of the space may be greater than twenty (20) feet. 3. The fee for renovation shall be based on the estimated cost of the work. For the purpose of determining the estimated cost, the applicant shall submit to the construction official such cost data as may be available produced by the architect or engineer of record, or by a recognized estimating firm, or a bona fide contractor's bid. 4. The fee for addition shall be computed on the same basis as for new construction for the added portion. 5. The fee for a combination of renovation and additions shall be the sum of the fees computed separately as renovation and as additions. 6. The fee for plan review shall be twenty (20) percent of the amount to be charged for the construction permit and shall be paid at the time of submission of an application for a permit. The amount paid for plan review shall be credited towards the fee for the construction permit. 7. The fee to be charged for a certificate of occupancy shall be paid before a certificate is issued. The fee shall be in addition to the construction permit fee. 8. The fee to be charged for an annual construction permit shall be charged annually. This fee shall be a flat fee based on the number of maintenance workers who are employed by the facility, and who are primarily engaged in work that is governed by a subcode. Managers, engineers and clerical shall not be considered maintenance workers for the purpose of establishing an annual permit fee. 9. The fee for those subcode inspections performed by a private inspection agency shall be the percentage of the state fees under N.J.A.C. 5:23-4.20 Departmental Fees established in the authorized agencies contract. B. Building Fees. Work/Project | Scope of Work/Activities | Fees ($) New Construction | New Building Addition New Addition | 0.02/Cu. Ft. (75.00 Min. Fee) 0.02/Cu. Ft. (75.00 Min. Fee) Rehabilitation & Alteration | First $50,000.00 Second $50,000.00 Over $100,000.00 | 20.00/1000.00 (75.00 Min. Fee) 18.00/1000.00 16.00/1000.00 Demolition | Garage (up to 3-cars) & Shed One & Two Family Three Family & up Commercial under 5,000.00 Sq. Ft. & Commercial over 5,000.00 Sq. Ft. | 50.00 100.00 125.00 225.00 275.00 Certificate of Occupancy | New One & Two Family New Three Family & Up New Commercial Rehabilitation, Alteration & Renovation to Residential Rehabilitation, Alteration & Renovation to Commercial | 5% of Permit Fee (75.00 Min. Fee) 15% of Permit Fee (150.00 Min. Fee) 15% of Permit Fee (200.00 Min. Fee) 60.00 65.00 Temporary Certificate of Occupancy | Temporary Certificate of Occupancy Renewal of Temporary Certificate of Occupancy | 30.00 30.00 Roofing | One and Two Family All Other Use | 75.00 20.00/1000.00 (100.00 Min. Fee) Siding | One and Two Family All Other Use | 75.00 20.00/1000.00 (100.00 Min. Fee) Tank Removal/Abandonment and Installation | Tank up to 550 Gallons 551 - 1000 Gallons 1001 - 2000 Gallons 2000 - 5000 Gallons Above 5000 Gallons | 85.00 150.00 200.00 250.00 300.00 Pool | Above Ground Pool In-Ground Pool | 75.00 175.00 Fence | To 300 Ln. Ft. Over 300 Ln. Ft. | 75.00 150.00 Asbestos and Lead Abatement | 190.00 Certificate of Clearance for Asbestos and Lead Abatement | 35.00 All Signs | 2.50/Sq. Ft. (75.00 Min. Fee) C. Plumbing Fees. Devices & Fixtures | Fee ($) Water Closet | 15.00 Bidet/Urinal | 15.00 Bathtub/Shower | 15.00 Lavatory/Sink | 15.00 Floor Drain | 15.00 Dishwasher | 15.00 Drinking Fountain | 15.00 Washing Machine | 15.00 Hose BIBB | 15.00 Water Heater | 15.00 Fuel Oil Pipe | 15.00 Gas Pipe | 15.00 L.P. Gas Tank | 15.00 Steam Boiler | 70.00 Hot Water Boiler | 70.00 Sewer Pump | 70.00 Interceptor/Separator | 70.00 Residential Back Flow Preventer | 70.00 Commercial Back Flow Preventer | 70.00 Grease Trap | 70.00 Water Cooled A/C | 70.00 Sewer Connection | 75.00 Water Service Connection | 75.00 Stack | 15.00 Minimum Fee | 65.00 D. Electrical Fees. Devices & Fixtures | Increments and Rating | Fees ($) Outlets, Wall Switches, Fluorescent Fixtures, Receptacles, Motors & Devices of 1-HP or 1-KW or Less | 1 to 25 Increments of 20 | 45.00 10.00 Motors & Electrical Devices | To - 10 H.P. To - 50 H.P. To - 100 H.P. Above - 100 H.P. | 20.00 65.00 150.00 550.00 Transformers & Generators | To - 10 KW To - 45 KW To - 112.5 KW Above - 112.5 KW | 20.00 65.00 150.00 550.00 Photovoltaic System | To - 10 KW To - 45 KW Above - 45 KW | 20.00 65.00 125.00 Services Panel | To - 100 AMP To - 225 AMP To - 300 AMP To - 400 AMP To - 500 AMP To - 600 AMP To - 1000 AMP Above - 1000 AMP | 65.00 65.00 150.00 150.00 150.00 150.00 150.00 575.00 Minimum Fee | 65.00 E. Fire Permit Fees. Devices & Fixtures | Increments and System | Fees ($) Wet and/or Dry Sprinkler Head | 1 to 20 To - 100 To - 200 To - 400 To - 1000 Over - 1000 | 85.00 130.00 245.00 625.00 900.00 1140.00 Alarm Devices (Smoke and/or Fire Devices) | 1 - 12 To - 37 To - 62 To - 87 To - 112 To - 137 Over - 137 | 50.00 55.00 70.00 85.00 100.00 120.00 140.00 Pre-Engineered | CO 2 Suppression FM 200 Suppression Foam Suppression Dry Chemical Wet Chemical | 105.00 105.00 105.00 105.00 105.00 Miscellaneous | Stand Pipe Kitchen Hood | 240.00 80.00 Heat Producing Devices | Smoke Control Fire Pump/GPM Type Oil/Gas Fire Appliance Fire Place Vent/Metal Chimney | 90.00 160.00 55.00 68.00 Minimum Fee | 65.00 F. Certificate of Occupancy Fees. 1.Certificate of occupancy | $35.00 2.Certificate of occupancy granted to change in use groups | $120.00 3.Certificate of continued occupancy | $120.00 G. Annual Permit Fees. 1.One to 25 workers (including foremen) | $500.00 2.Each additional worker over 25 | $175.00 Prior to the issuance of the annual permit, a training registration fee of one hundred forty dollars ($140.00) per subcode and a list of at least one, but not more than three individuals to be trained per subcode shall be submitted by the applicant to the department of community affairs training section along with a copy of the construction permit. H. Asbestos Removal. 1. Fee shall be the fee established in N.J.A.C. 5:23-8.9. I. Lead Abatement. 1. Fee .....$140.00 J. Training and Administration Fees. 1. DCA Training fees: N.J.A.C. 5:23-4.19 a.Volume of new construction times | $0.0016 b.Cost of renovation work, including all disciples | $0.80 per $1,000.00 2. Administrative Fee, N.J.A.C. 5:23-(subcode enforced by private agencies only) a.Administrative surcharge | 15 percent of permit fee 3. Variation, Re-submission, N.J.A.C. 5:23-2.10 a.Class 1 plans | $350.00 b.Class 2 and 3 | $65.00 c.Class 1 plans resubmission | $125.00 d.Class 2 and 3 plans resubmission | $35.00 4. Construction Board of Appeals a.Fee will be | $50.00 K. Any nonprofit charitable organization which solely provides permanent care for terminally ill individuals in the city shall be exempt from the payment of any construction permit fees effective June 30, 1996. L. Any nonprofit organization which has been determined by the city to qualify as a community housing development corporation (CHODO) as defined by the National Affordable Housing (Cranston-Gonzales) Act of 1990 shall be exempt from the payment of any construction permit fees for construction in an area of the city which has been declared blighted, or an area in need of rehabilitation. M. Miscellaneous Permit Fees. Fees ($) Dumpster in Public Right-of-Way | 100.00 (3 increment days without construction permit) 100.00 (5 increment days with Construction Permit) Renewal of Certificate of Occupancy For Day Care | 450.00 Scaffold in Public Right-of-Way (Subject to prior approval from Dept. of Engineering) | 100.00

(Ord. No. 6016, §§ 1—3, 6-25-2024; Ord. No. 4540, § 1(Sch. A), 1-27-2015; Ord. No. 4516, § 1(Sch. A), 11-25-2014; prior code § 26-4)